Bat surveys in Orpington for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Bromley rules explained

Recommended For Orpington

  1. Greengage Environmental

    Environmental and ecology consultancy with a London office at Holyrood Street, near…

  2. Eight Versa

    London environmental consultancy based at Marshalsea Road, Southwark, formerly trading…

  3. The Ecology Partnership

    Independent ecology consultancy with its head office in Leatherhead, Surrey.

  4. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

Get your free quote from Eight Versa

Tell Eight Versa about your site in Orpington. It's free, and there's no obligation. Your request is for Eight Versa only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Buildings and mature trees around The Priory, Orpington Conservation Area and in the River Cray can support bats, so a bat survey is often needed in Orpington. Demolition, roof works, loft conversions and the loss of mature trees are typical triggers, particularly on or next to a conservation area. London Borough of Bromley is the local planning authority, and the London Plan, published on 2 March 2021, also forms part of the development plan. Survey timing and the need for further emergence or activity work should follow current good practice and the council's validation list. Confirm the current validation requirements with the council before submitting.

Local planning authority: London Borough of Bromley

The Priory, Orpington, a flint and brick medieval building with mullioned windows and a red-tiled roof, seen against a blue sky
Photo: Ethan Doyle White, CC BY-SA 4.0

In Orpington

Orpington is the eastern major centre in the borough, around Orpington High Street, The Priory, Orpington Conservation Area and the River Cray, with the Metropolitan Green Belt on the town's edge. That Cray and priory setting is not Bromley Town Centre, Market Square or the River Ravensbourne. Bat surveys are often needed where works affect roofs, lofts or mature trees around The Priory, Orpington Conservation Area and River Cray.

Conservation areas
The Priory, Orpington Conservation Area — The Priory, Orpington Conservation Area was designated on 14 May 1985 and covers the medieval priory and its immediate setting in the town.
Rivers
River Cray — The River Cray is the watercourse through Orpington, a different catchment from the River Ravensbourne at Bromley Town Centre.
Local character
Orpington High Street — Orpington High Street is the commercial spine of Orpington Major Centre, a short walk from the priory and the River Cray.
Green Belt
Metropolitan Green Belt — Orpington sits against the Metropolitan Green Belt on the south-eastern edge of Greater London, a planning constraint that is much closer here than at Bromley Town Centre.
Local authority and policy

In Orpington, including around The Priory, Orpington Conservation Area and River Cray, the London Borough of Bromley assesses bat and other protected-species issues under Policy 72 of the Bromley Local Plan, adopted on 16 January 2019, together with Policy 79, Policy G6 of the London Plan, published on 2 March 2021, and the Conservation of Habitats and Species Regulations. The Validation Guidance of January 2025 requires a preliminary ecological assessment where protected species may be affected. Confirm the current local validation requirements with the council before submitting. Confirm the current validation requirements with the council before submitting.

Local plan: Bromley Local Plan (The Bromley Local Plan was adopted on 16 January 2019 and remains the adopted local plan. A review is under way but is not treated as adopted policy. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)

  • Policy 73: Development and Trees

    Policy 73 of the Bromley Local Plan, adopted on 16 January 2019, seeks the retention of healthy trees of amenity value and, where development may affect important trees, requires a tree survey and arboricultural implications assessment in accordance with BS5837.

  • Policy 72: Protected Species

    Policy 72 resists development that would have an adverse effect on protected species unless mitigating measures can be secured.

  • Policy 115: Reducing Flood Risk

    Policy 115 requires a flood risk assessment in Flood Zones 2 and 3, in surface water flood risk hotspots, and for major development across the borough, and applies the sequential and exception tests.

  • Policy 116: Sustainable Urban Drainage Systems

    Policy 116 requires developments to incorporate sustainable drainage and requires a site-specific flood risk assessment in Flood Zones 2, 3a and 3b and in Flood Zone 1 surface water hotspots.

  • Policy 79: Biodiversity and Access to Nature

    Policy 79 requires the Council to enhance biodiversity across the borough and assist ecological restoration. It does not set a biodiversity net gain percentage above the national minimum.

What you’ll usually need

General guidance for bat survey, not formal advice for your site.

Timing and seasons
Roost inspections can be done all year; emergence and re-entry surveys are seasonal, typically May to September.
Standards
Bat Conservation Trust Bat Surveys for Professional Ecologists: Good Practice Guidelines

Questions about bat surveys in Orpington

Who is the local planning authority for a bat survey in Orpington?

London Borough of Bromley. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

When is a bat survey likely in Orpington?

When a planning application in Orpington could affect trees, habitats, heritage, flood risk or existing buildings around The Priory, Orpington Conservation Area and River Cray. Confirm the current validation requirements with the council.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan in Orpington alongside the London Borough of Bromley local plan.