Featured partner
Recommended for Fulham

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Fulham

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
London-based ecological consultancy in Muswell Hill.
Environmental and ecology consultancy with a London office at Holyrood Street, near…
London environmental consultancy based at Marshalsea Road, Southwark, formerly trading…
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Biodiversity net gain in Fulham is judged against the habitats around River Thames and Bishops Park Conservation Area, not against a generic borough-wide picture. After the National Planning Policy Framework published on 17 August 2026, qualifying applications are assessed against the statutory 10 per cent minimum except on a justified site allocation. London Borough of Hammersmith and Fulham is the local planning authority, and the London Plan, published on 2 March 2021, also forms part of the development plan. A metric assessment should reflect the actual site and the adjoining habitats in Fulham, including any designated open space or watercourse. Confirm the current validation requirements with the council before submitting.
Local planning authority: London Borough of Hammersmith and Fulham

Fulham is the southern major centre in the borough, around Walham Green Conservation Area at Fulham Broadway, with Fulham Palace and Bishops Park Conservation Area on the Thames and Hurlingham Conservation Area further south. That palace and Broadway setting is not Shepherd's Bush Green, and it is not the Hammersmith Bridge and Broadway interchange either. A net gain metric for a site in Fulham should reflect the habitats around River Thames and Bishops Park Conservation Area.
In Fulham, including around River Thames and Bishops Park Conservation Area, the London Borough of Hammersmith and Fulham assesses biodiversity under Policies OS4 and OS5 of the Hammersmith and Fulham Local Plan, adopted on 28 February 2018. Those policies do not set a percentage above the statutory 10 per cent minimum. After the National Planning Policy Framework published on 17 August 2026, qualifying applications are assessed against the statutory 10 per cent minimum except on a justified site allocation. Confirm the current local validation requirements with the council before submitting. Confirm the current validation requirements with the council before submitting.
Local plan: Hammersmith and Fulham Local Plan (The Hammersmith and Fulham Local Plan was adopted on 28 February 2018 and remains the adopted local plan. A Regulation 18 consultation on a replacement plan took place in 2025 and is not treated as adopted. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
OS5: Greening the Borough
Policy OS5 of the Hammersmith and Fulham Local Plan, adopted on 28 February 2018, seeks to enhance biodiversity and green infrastructure by maximising gardens, garden space and soft landscaping, seeking green or brown roofs and other planting as part of new development, protecting gardens from new development, seeking to prevent the removal or mutilation of protected trees, seeking retention of existing trees and provision of new trees on development sites, adding to the greening of streets and the public realm, and making Tree Preservation Orders where justified in the interests of amenity. Supporting text notes that trees and soft landscaping also help to reduce rainfall run-off and the risk of surface water flooding.
OS4: Nature Conservation
Policy OS4 protects nature conservation areas and green corridors identified on the Policies Map from development likely to cause demonstrable harm to their ecological value, unless the development would release a site needed to realise a qualitative gain for the local community and there is no net loss of native species and no net loss of habitat, or replacement nature conservation interest of equal or greater value is provided in the locality. Outside those areas, proposals should enhance nature conservation interest through initiatives such as new green infrastructure and habitats, tree planting and brown and green roofs, and protect any significant interest on the site and any nearby nature conservation area, appropriate to the scale and nature of the development. The policy does not set a biodiversity net gain percentage above the statutory 10 per cent minimum.
CC3: Minimising Flood Risk and Reducing Water Use
Policy CC3 requires developments to reduce the use of water and minimise current and future flood risk. A site-specific flood risk assessment is required for all proposals in Flood Zones 2 and 3, all new development over 1 hectare in Flood Zone 1, all new development in surface water flooding hotspots identified in the council's Surface Water Management Plan, and all new development with a subterranean element in areas identified as being at risk from elevated groundwater levels. The FRA must address the National Planning Policy Framework, include an Exception Test where applicable, assess flooding from all relevant sources, and integrate appropriate flood-proofing. New self-contained basement flats will not be permitted in Flood Zone 3 where there is a risk of rapid inundation, or in surface water hotspots with a significant or higher flood hazard, unless a satisfactory means of escape can be provided.
CC4: Minimising Surface Water Run-off with Sustainable Drainage Systems
Policy CC4 requires all proposals for new development to manage surface water run-off as close to its source as possible and on the surface where practicable, in line with the London Plan drainage hierarchy. All major developments must implement Sustainable Drainage Systems to enable a reduction in peak run-off to greenfield rates for storms up to the 1 in 100 year event plus climate change allowance, and must provide a sustainable drainage strategy. All other developments must maximise attenuation, achieving greenfield run-off rates where possible, particularly in surface water flooding hotspots or where impermeable area increases. Drainage measures should also help deliver biodiversity, amenity and water-quality objectives. All flat roofs in new developments should be living roofs to help reduce run-off, and SuDS must be retained and maintained for the lifetime of the development.
General guidance for biodiversity net gain (bng), not formal advice for your site.
London Borough of Hammersmith and Fulham. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
When a planning application in Fulham could affect trees, habitats, heritage, flood risk or existing buildings around River Thames and Bishops Park Conservation Area. Confirm the current validation requirements with the council.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan in Fulham alongside the London Borough of Hammersmith and Fulham local plan.