Biodiversity net gain in Wembley for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Brent rules explained

Recommended For Wembley

  1. Aven Ecology

    London-based ecological consultancy in Muswell Hill.

  2. Greengage Environmental

    Environmental and ecology consultancy with a London office at Holyrood Street, near…

  3. Eight Versa

    London environmental consultancy based at Marshalsea Road, Southwark, formerly trading…

  4. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

Get your free quote from ROAVR Group

Tell ROAVR Group about your site in Wembley. It's free, and there's no obligation. Your request is for ROAVR Group only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

The River Brent, Brent Reservoir and open land around Wembley Stadium are the habitats that most often shape a biodiversity net gain assessment in Wembley. For planning applications the local planning authority is the London Borough of Brent. The council applies the statutory minimum of 10 per cent under the Environment Act 2021. Policy BGI1 of the Local Plan 2019-2041, adopted on 24 February 2022, already requires development to achieve a net gain in biodiversity, but it does not set a higher local percentage. Policy G6 of the London Plan, published on 2 March 2021, also forms part of the development plan.

Local planning authority: London Borough of Brent

An aerial view of Wembley Stadium and the surrounding town, looking across the arch and the pitch
Photo: Arne Müseler, CC BY-SA 3.0 de

In Wembley

Barn Hill Open Space, Tokyngton Recreation Ground, Chalkhill Open Space and the Grand Union Canal south of the town add further parkland, hillside and waterside habitat around Wembley Town Centre and Wembley Park. A net gain assessment should sit alongside any preliminary ecological appraisal and should not treat the statutory metric as a substitute for protecting Brent Reservoir.

Local character
Wembley Town Centre — A Major Centre in the London Plan, with future potential to become a Metropolitan Centre, focused on Wembley High Road. This is the main search centre for the Brent borough page.
Olympic Way — The processional route between Wembley Park station and Wembley Stadium, a planted public realm corridor in the town.
Wembley Park — The district immediately east of Wembley Town Centre, around the stadium and station. It is an area covered by this page, not a separate place.
Wembley High Road — The main street of Wembley Town Centre, where street trees, building lines and levels set the character for tree and topographical surveys.
Landmarks
Wembley Stadium — The national stadium immediately east of Wembley Town Centre, a defining landmark whose surrounding public realm, trees and levels often feature in survey work.
Wembley Arena — The arena next to Wembley Stadium, part of the same landmark cluster east of Wembley Town Centre.
Rivers
River Brent — The main river corridor through Wembley, running south and east of the town centre toward Brent Reservoir and on through the borough.
SSSIs
Brent Reservoir — A Site of Special Scientific Interest north-east of Wembley, also known locally as the Welsh Harp, named in the Local Plan supporting text on green and blue infrastructure.
Other
Barn Hill Open Space — Open space and hillside north of Wembley Park, looking toward Brent Reservoir, part of the green setting of the town.
Grand Union Canal — The Paddington Arm of the canal, running south of Wembley through Alperton, a waterside corridor close enough to be part of the town's wider setting.
Tokyngton Recreation Ground — Parkland on the River Brent south of Wembley Town Centre, part of the river-corridor setting.
Chalkhill Open Space — Open space north of Wembley Park, part of the local green network between the town and Barn Hill Open Space.
Local authority and policy

The London Borough of Brent applies the statutory biodiversity net gain duty under the Environment Act 2021, which requires a minimum 10 per cent gain for qualifying development, together with Policy BGI1 of the Local Plan 2019-2041, adopted on 24 February 2022, and London Plan Policy G6. Policy BGI1 already requires a net gain in biodiversity but does not set a percentage. Confirm the current validation requirements with the council before submitting.

Local plan: Brent Local Plan 2019-2041 (adopted 24 February 2022) and The London Plan 2021 (published 2 March 2021) (The Brent Local Plan 2019-2041 was adopted by Full Council on 24 February 2022 and remains the adopted borough development plan as of 13 November 2026, together with the London Plan 2021, published on 2 March 2021. The draft London Plan 2026 is in consultation and is not adopted. There is no 2027 successor council. The London Borough of Brent is the local planning authority and the Lead Local Flood Authority.)

  • G7: Trees and woodlands

    Requires existing trees of value to be retained wherever possible. Where trees are removed, there should be adequate replacement based on the value of the benefits lost, determined by a method such as i-Tree or CAVAT. Additional planting, particularly of large-canopied species, should generally be included.

  • SI 12: Flood risk management

    Requires development proposals to minimise and mitigate flood risk and address residual risk, including, where possible, making space for water and setting development back from watercourses. In London the boroughs are the Lead Local Flood Authorities.

  • BGI1: Green and Blue Infrastructure in Brent

    Requires development to achieve a net gain in biodiversity and avoid any detrimental impact on the geodiversity of an area, and to place emphasis on solutions that support biodiversity when meeting the urban greening factor. It also seeks additional public open space, including in Wembley Central ward, and requires development on or near the Capital Ring to protect its character and, where appropriate, contribute to its improvement. The policy does not set a biodiversity net gain percentage.

  • BGI2: Trees and Woodlands

    Requires development with existing trees on or adjoining the site that could be affected to submit a BS5837 or equivalent tree survey. Major development should make provision for the planting and retention of trees on site; where retention is agreed not to be possible, new trees should achieve equivalent canopy cover or a financial contribution should be made for off-site planting of equivalent canopy cover. Minor development that results in the loss of trees should provide appropriate replacements on site. Works to trees should accord with BS3998 or equivalent, and retained or proposed trees should accord with BS5837 recommendations.

  • BSUI3: Managing Flood Risk

    Requires proposals that need a flood risk assessment to demonstrate that the development will be resistant and resilient to all relevant sources of flooding including surface water, to pass the sequential and exception tests as required by national policy, to minimise flood risk on site and not increase it elsewhere, and not to create new basement dwellings in areas of high flood risk. Proposals that fail to make appropriate provision for flood risk mitigation, or which would increase the risk or consequences of flooding, will be refused. Opportunities will be sought from redevelopment in functional floodplain (Flood Zone 3b) to restore natural function and storage capacity.

  • G6: Biodiversity and access to nature

    London Plan Policy G6 requires development proposals to manage impacts on biodiversity and aim to secure net biodiversity gain. Sites of Importance for Nature Conservation should be protected. The policy does not set a percentage.

What you’ll usually need

General guidance for biodiversity net gain (bng), not formal advice for your site.

Timing and seasons
Habitat condition surveys are best carried out in the growing season (roughly April to September).
Standards
Statutory biodiversity metric; Environment Act 2021

Questions about bng assessments in Wembley

Who is the local planning authority for a biodiversity net gain assessment in Wembley?

London Borough of Brent. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

Is biodiversity net gain required in Wembley?

Yes, for qualifying applications. The council applies the statutory minimum of 10 per cent under the Environment Act 2021. Policy BGI1 and London Plan Policy G6 already seek net gain but do not set a higher local percentage. Confirm the current validation requirements with the council.

Does an emerging plan change the percentage?

No. The Brent Local Plan 2019-2041 is adopted and does not set a percentage above the statutory duty. The draft London Plan 2026 is not adopted. These drafts use the statutory 10 per cent duty.