Featured partner
Recommended for Witham

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Witham

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Ecological consultancy whose own website states that it is based in Essex and lists…
Ecological consultancy of Essex Wildlife Trust, trading as Essex Ecology Services…
Arboricultural and ecological consultancy with a Kent office at The Watermill, Maidstone…
Ecological consultancy whose own site uses the trading identity Lamarsh, Essex, in…
Biodiversity net gain in Witham needs to be measured where development could affect habitats in the Witham Conservation Area or along the River Brain. Braintree District Council is the local planning authority. Braintree District Council applies the statutory 10 per cent biodiversity net gain minimum. Policy LPP 63 seeks to protect and enhance biodiversity, but the council has not adopted a higher than statutory standard. After the National Planning Policy Framework published on 17 August 2026, qualifying applications are assessed against the statutory 10 per cent minimum except on a justified site allocation. Habitats in the Witham Conservation Area and along the River Brain can support bats, birds and other protected species. Confirm the current validation requirements with the council before submitting.
Local planning authority: Braintree District Council

Witham is in the area of Braintree District Council. It is a historic town on the River Brain, between Chelmsford and Colchester, quite unlike the New Towns of south Essex or the coastal towns farther east, with an official conservation area first designated in 1968 and later extended to include Bridge Street and Guithavon Street. The Witham Conservation Area and the River Brain are the official features that shape biodiversity net gain work here. Essex County Council is the Lead Local Flood Authority. There is no confirmed 2027 successor council for Essex.
In Witham, including around the Witham Conservation Area and along the River Brain, the same adopted local plan policies apply. Braintree District Council applies the statutory 10 per cent biodiversity net gain minimum. Policy LPP 63 seeks to protect and enhance biodiversity, but the council has not adopted a higher than statutory standard. After the National Planning Policy Framework published on 17 August 2026, qualifying applications are assessed against the statutory 10 per cent minimum except on a justified site allocation. Confirm the current validation requirements with the council before submitting.
Local plan: Braintree District Local Plan 2013-2033 (The Braintree District Local Plan 2013-2033 is the statutory development plan as of 15 November 2026. Section 1 was adopted in February 2021 and Section 2 was adopted in July 2022.)
LPP 63: Natural Environment and Green Infrastructure
Policy LPP 63 (Natural Environment and Green Infrastructure) of the Braintree District Local Plan 2013-2033 Section 2 requires the protection and enhancement of habitats, biodiversity and geodiversity, including designated nature-conservation sites, and the mitigation of adverse effects.
LPP 74: Flood Risk and Surface Water Drainage
Policy LPP 74 (Flood Risk and Surface Water Drainage) of the Braintree District Local Plan 2013-2033 Section 2 says new development should be directed to Flood Zone 1 or the lowest risk areas, with flood risk assessments and climate-change allowances required for development in higher-risk locations, and surface-water drainage addressed in the scheme.
General guidance for biodiversity net gain (bng), not formal advice for your site.
Braintree District Council. Essex County Council is the Lead Local Flood Authority. There is no confirmed 2027 successor council for Essex.
Biodiversity net gain in Witham needs to be measured where development could affect habitats in the Witham Conservation Area or along the River Brain. Confirm the current validation requirements with the council.
Braintree District Council applies the statutory 10 per cent biodiversity net gain minimum. Policy LPP 63 seeks to protect and enhance biodiversity, but the council has not adopted a higher than statutory standard. After the National Planning Policy Framework published on 17 August 2026, qualifying applications are assessed against the statutory 10 per cent minimum except on a justified site allocation. Confirm the current validation requirements with the council.