Featured partner
Recommended for Beccles

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Beccles

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Civil engineering consultancy, also trading as SuDS Designs, whose own site publishes a…
A flood risk assessment in Beccles is often needed where work could affect the Beccles Conservation Area, or the River Waveney. East Suffolk Council is the local planning authority. Policy WLP8.24 requires flooding from all sources to be considered, a site-specific flood risk assessment where development is at risk, and the use of sustainable drainage systems. Unallocated new housing is not permitted on sites at risk from flooding. It is a Waveney market town around the official Beccles Conservation Area and the River Waveney, of which part of the town is within the Broads Authority area, quite unlike Lowestoft, Felixstowe or Woodbridge. The adopted East Suffolk Council Waveney Local Plan applies here. Confirm the current validation requirements with the council before submitting.
Local planning authority: East Suffolk Council

Beccles is in the area of East Suffolk Council. It is a Waveney market town around the official Beccles Conservation Area and the River Waveney, of which part of the town is within the Broads Authority area, quite unlike Lowestoft, Felixstowe or Woodbridge. The adopted East Suffolk Council Waveney Local Plan applies here. The Beccles Conservation Area and the River Waveney are the official features that shape flood risk and drainage work here. Suffolk County Council is the Lead Local Flood Authority. There is no confirmed successor council for East Suffolk.
In Beccles, including around the Beccles Conservation Area and at the River Waveney, the same adopted local plan policies apply. East Suffolk Council assesses flood risk and drainage under Policy WLP8.24 of the East Suffolk Council Waveney Local Plan. Policy WLP8.24 (Flood Risk) of the East Suffolk Council Waveney Local Plan, adopted on 20 March 2019, requires development proposals to consider flooding from all sources and take into account climate change. Proposals at risk of flooding should only be granted planning permission if it can be demonstrated that there are no available sites suitable for the proposed use in areas with a lower probability of flooding, that the development provides sustainability benefits which outweigh flood risk, and that a site-specific flood risk assessment demonstrates that the flood risk can be satisfactorily mitigated over the lifetime of the development. New residential development on sites not allocated in the Local Plan or a Neighbourhood Plan will not be permitted on sites at risk from flooding. Developments should use sustainable drainage systems to drain surface water. Confirm the current validation requirements with the council before submitting.
Local plan: East Suffolk Council Suffolk Coastal Local Plan and East Suffolk Council Waveney Local Plan (adopted)
SCLP10.1: Biodiversity and Geodiversity
Policy SCLP10.1 (Biodiversity and Geodiversity) of the East Suffolk Council Suffolk Coastal Local Plan, adopted on 23 September 2020, requires development to maintain, restore or enhance biodiversity and geodiversity and to provide a biodiversity net gain that is proportionate to the scale and nature of the proposal. Development resulting in the loss or deterioration of irreplaceable habitats, including ancient woodland and veteran trees, will not be permitted unless there are wholly exceptional reasons and a suitable compensation strategy exists. The policy does not set a higher than statutory biodiversity net gain percentage. East Suffolk Council applies the statutory 10 per cent minimum.
SCLP9.5: Flood Risk
Policy SCLP9.5 (Flood Risk) of the East Suffolk Council Suffolk Coastal Local Plan, adopted on 23 September 2020, provides that the Strategic Flood Risk Assessment should be the starting point in assessing whether a proposal is at risk from flooding. Proposals for new development, or the intensification of existing development, will not be permitted in areas at high risk from flooding, namely Flood Zones 2 and 3, unless the applicant has satisfied the safety requirements in national planning practice guidance, including the sequential test, where needed the exception test, and a site-specific flood risk assessment that addresses the characteristics of flooding and an appropriate range of flood event scenarios, taking climate change into account. Developments should be safe, resilient and should not increase flood risk elsewhere, and are encouraged to include natural flood management measures.
WLP8.34: Biodiversity and Geodiversity
Policy WLP8.34 (Biodiversity and Geodiversity) of the East Suffolk Council Waveney Local Plan, adopted on 20 March 2019, supports development where it can be demonstrated that it maintains, restores or enhances the existing green infrastructure network and positively contributes towards biodiversity through the creation of new green infrastructure and improvement to linkages between habitats, having regard to the Waveney Green Infrastructure Strategy (2015). Development proposals should be accompanied by sufficient information to assess the effects of development on protected sites, species, biodiversity or geology, together with any proposed prevention, mitigation or compensation measures. The policy does not set a higher than statutory biodiversity net gain percentage. East Suffolk Council applies the statutory 10 per cent minimum.
WLP8.24: Flood Risk
Policy WLP8.24 (Flood Risk) of the East Suffolk Council Waveney Local Plan, adopted on 20 March 2019, requires development proposals to consider flooding from all sources and take into account climate change. Proposals at risk of flooding should only be granted planning permission if it can be demonstrated that there are no available sites suitable for the proposed use in areas with a lower probability of flooding, that the development provides sustainability benefits which outweigh flood risk, and that a site-specific flood risk assessment demonstrates that the flood risk can be satisfactorily mitigated over the lifetime of the development. New residential development on sites not allocated in the Local Plan or a Neighbourhood Plan will not be permitted on sites at risk from flooding. Developments should use sustainable drainage systems to drain surface water.
General guidance for flood risk and drainage assessment, not formal advice for your site.
East Suffolk Council. Suffolk County Council is the Lead Local Flood Authority. There is no confirmed successor council for East Suffolk.
A flood risk assessment in Beccles is often needed where development could be affected by the River Waveney, or by other sources of flooding around the Beccles Conservation Area. Confirm the current validation requirements with the council.
Suffolk County Council is the Lead Local Flood Authority. Confirm the current validation requirements with the council.