Featured partner
Recommended for Braintree

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Braintree

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Civil and environmental engineering consultancy with an office titled Essex at 1-2…
Civil and structural engineering practice with an Essex office at 8 Atlantic Square,…
Flood risk and drainage consultancy based in Crawley, working across England and Wales.
Multi-disciplinary consultancy with its Essex head office at Majesty House, Skyline 120,…
A flood risk assessment in Braintree is often needed in the Braintree Town Centre Conservation Area or around the Bradford Street, Braintree Conservation Area, and on other sites at risk of flooding from rivers, the sea, surface water or other sources. Braintree District Council is the local planning authority. Policy LPP 74 says new development should be directed to Flood Zone 1 or the lowest risk areas, with flood risk assessments and climate-change allowances required for higher-risk locations, and surface-water drainage addressed in the scheme. It is a historic market town in mid-Essex, quite unlike the coastal towns of the county or the New Towns farther south, with two official conservation areas in the town itself: the town centre and the historic route along Bradford Street. Confirm the current validation requirements with the council before submitting.
Local planning authority: Braintree District Council

Braintree is in the area of Braintree District Council. It is a historic market town in mid-Essex, quite unlike the coastal towns of the county or the New Towns farther south, with two official conservation areas in the town itself: the town centre and the historic route along Bradford Street. The Braintree Town Centre Conservation Area and the Bradford Street, Braintree Conservation Area are the official features that shape flood risk and drainage work here. Essex County Council is the Lead Local Flood Authority. There is no confirmed 2027 successor council for Essex.
In Braintree, including around the Braintree Town Centre Conservation Area and around the Bradford Street, Braintree Conservation Area, the same adopted local plan policies apply. Braintree District Council assesses flood risk and drainage under Policy LPP 74 of the Braintree District Local Plan 2013-2033. Policy LPP 74 says new development should be directed to Flood Zone 1 or the lowest risk areas, with flood risk assessments and climate-change allowances required for higher-risk locations, and surface-water drainage addressed in the scheme. Confirm the current validation requirements with the council before submitting.
Local plan: Braintree District Local Plan 2013-2033 (The Braintree District Local Plan 2013-2033 is the statutory development plan as of 15 November 2026. Section 1 was adopted in February 2021 and Section 2 was adopted in July 2022.)
LPP 63: Natural Environment and Green Infrastructure
Policy LPP 63 (Natural Environment and Green Infrastructure) of the Braintree District Local Plan 2013-2033 Section 2 requires the protection and enhancement of habitats, biodiversity and geodiversity, including designated nature-conservation sites, and the mitigation of adverse effects.
LPP 74: Flood Risk and Surface Water Drainage
Policy LPP 74 (Flood Risk and Surface Water Drainage) of the Braintree District Local Plan 2013-2033 Section 2 says new development should be directed to Flood Zone 1 or the lowest risk areas, with flood risk assessments and climate-change allowances required for development in higher-risk locations, and surface-water drainage addressed in the scheme.
General guidance for flood risk and drainage assessment, not formal advice for your site.
Braintree District Council. Essex County Council is the Lead Local Flood Authority. There is no confirmed 2027 successor council for Essex.
A flood risk assessment in Braintree is often needed in the Braintree Town Centre Conservation Area or around the Bradford Street, Braintree Conservation Area, and on other sites at risk of flooding from rivers, the sea, surface water or other sources. Confirm the current validation requirements with the council.
Policy LPP 74 says new development should be directed to Flood Zone 1 or the lowest risk areas, with flood risk assessments and climate-change allowances required for higher-risk locations, and surface-water drainage addressed in the scheme. Confirm the current validation requirements with the council.