Flood risk and drainage assessments in Brixton for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Lambeth rules explained

Recommended For Brixton

  1. JMS Engineers

    Civil and structural engineering practice with a London office in Lambeth.

  2. RGP

    Transport and civil engineering consultancy with a Surrey office in Godalming and a…

  3. Motion

    Transport planning and infrastructure consultancy with its main office on North Street…

  4. Scott White and Hookins

    Civil and structural engineering consultancy whose London office is in Sutton town centre.

At a glance

Surface water flood risk in Brixton Town Centre is a frequent reason for a flood risk assessment in Brixton. The Thames tidal floodplain lies in the north of the borough, around Waterloo and Vauxhall, and the River Graveney is a fluvial risk in the south, toward Streatham; neither runs through the town centre. The local planning authority, and the Lead Local Flood Authority, is the London Borough of Lambeth. Policy EN5 of the Lambeth Local Plan, adopted on 22 September 2021, requires a flood risk assessment for major development in Flood Zone 1, for all development in Flood Zones 2, 3a and 3b, or where a site may be subject to other sources of flooding, including surface water and sewers. Policy SI12 of the London Plan, published on 2 March 2021, also forms part of the development plan.

Local planning authority: London Borough of Lambeth

Lambeth Town Hall in Brixton, a red-brick and stone civic building with a clock tower, seen under a clear sky
Photo: Pinhas stern, CC BY-SA 4.0

In Brixton

The Local Plan records that a large part of the north of the borough is in Flood Zone 3a from tidal flooding of the Thames, defended by the Thames Barrier and built defences, and that there is an additional fluvial risk close to the River Graveney in the south. In Brixton Town Centre the more typical concern is surface water or sewer flooding, including around Brockwell Park and the surrounding streets. A flood risk assessment should be coordinated with a topographical survey of levels and with any sustainable drainage design under Policy EN6.

Local character
Brixton Town Centre — Lambeth's principal major centre, and the search centre used for these pages. It is inland of the Thames floodplain that affects the north of the borough.
surface water flood risk — The Local Plan and Strategic Flood Risk Assessment identify surface water and sewer flooding as risks across the borough, including inland centres such as Brixton, in addition to tidal risk in the north and fluvial risk near the River Graveney.
Conservation areas
Brixton Conservation Area — The conservation area covering the historic core of the town centre, identified in the Local Plan as a heritage setting for new development.
Other
Brockwell Park — One of south London's largest historic parks, a registered park and garden immediately south of Brixton Town Centre, designated in the Local Plan among the borough's key open spaces.
Rush Common — Historic common land on the rise toward Brixton Hill, still subject to the Rush Common Act 1806 as well as planning policy, and identified in the Local Plan as an open-space asset.
Rivers
River Graveney — A fluvial watercourse in the south of the borough, toward Streatham, identified in the Local Plan as a source of fluvial flood risk. It does not run through Brixton Town Centre.
Flood zones
Thames tidal floodplain — The Local Plan records that a large part of the north of the borough, including Waterloo and Vauxhall, lies in Flood Zone 3a from tidal flooding of the River Thames, defended by the Thames Barrier and built defences. That floodplain does not extend through Brixton Town Centre.
Local authority and policy

The London Borough of Lambeth assesses flood risk and drainage under Policies EN5 and EN6 of the Lambeth Local Plan, adopted on 22 September 2021, together with Policies SI12 and SI13 of the London Plan, published on 2 March 2021. Policy EN5 requires assessments to consider all sources of flooding and the latest climate change allowances, and to take account of the Strategic Flood Risk Assessment, Surface Water Management Plan and Local Flood Risk Management Strategy. The Local Information Requirements 2024 set out when a site-specific flood risk assessment must be submitted. Confirm the current local validation requirements with the council before submitting.

Local plan: Lambeth Local Plan 2020–2035 (adopted 22 September 2021) and The London Plan 2021 (published 2 March 2021) (The Lambeth Local Plan 2020–2035 was adopted on 22 September 2021 and remains the adopted borough development plan as of 13 November 2026, together with the London Plan 2021, published on 2 March 2021. The draft London Plan 2026 is in consultation and is not adopted. There is no 2027 successor council. The London Borough of Lambeth is the local planning authority and the Lead Local Flood Authority.)

  • EN1: Open space, green infrastructure and biodiversity

    Protects open space, green infrastructure and the nature conservation or biodiversity value of designated sites, including Local Nature Reserves and Sites of Importance for Nature Conservation. In accordance with London Plan Policy G6, development should protect, enhance, create or manage biodiversity in line with the borough's Biodiversity Action Plan.

  • EN5: Flood risk

    Applies a sequential, risk-based approach to the location of development and requires a flood risk assessment for major development in Flood Zone 1, for all development in Flood Zones 2, 3a and 3b, or where the site may be subject to other sources of flooding. Assessments must consider all sources, including tidal, fluvial, surface water, groundwater, sewer and reservoir flooding, and take account of climate change.

  • EN6: Sustainable drainage systems and water management

    Requires sustainable drainage so that development does not increase flood risk and, where possible, reduces it, delivering water quality, amenity and biodiversity benefits in line with the drainage hierarchy.

  • Q10: Trees

    Requires new development to take particular account of existing trees on the site and on adjoining land, and will not permit the loss of, or a threat to, trees of significant amenity, historic or ecological value, including veteran trees. Layouts should be informed by arboricultural survey and tree constraints information, with adequate replacement planting, using tools such as i-tree or CAVAT, where removal is imperative.

What you’ll usually need

General guidance for flood risk and drainage assessment, not formal advice for your site.

Timing and seasons
Not seasonal.
Standards
National Planning Policy Framework; Planning Practice Guidance: Flood risk and coastal change

Questions about flood risk assessments in Brixton

Who is the Lead Local Flood Authority for Brixton?

The London Borough of Lambeth. It is also the local planning authority. The London Plan forms part of the development plan. There is no 2027 successor council for this borough.

Does the Thames floodplain run through Brixton Town Centre?

No. The Local Plan locates the highest tidal flood risk in the north of the borough, including Waterloo and Vauxhall. Brixton Town Centre is inland; surface water and sewer flooding are the more typical local concerns, with fluvial risk from the River Graveney further south toward Streatham.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policies SI12 and SI13 deal with flood risk and sustainable drainage alongside Policies EN5 and EN6.