Featured partner
Recommended for Camberley

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Camberley

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Flood risk consultancy based at Pyle Hill near Woking, on the northern edge of Guildford…
Transport planning and infrastructure consultancy with its main office on North Street…
Transport planning and infrastructure consultancy based at Lion House, Oriental Road in…
Flood risk and drainage consultancy based in Crawley, working across England and Wales.
The Section 19 report of 28 October 2015 records internal property flooding in Camberley in winter 2013/14 at Robins Bow, Middleton Road, The Maultway and a short section of London Road, in the Blackwater River catchment. A flood risk assessment should examine the risk to a site, the effect a proposal could have elsewhere, and how residual risks will be managed. The local planning authority is Surrey Heath Borough Council. Policy DM10 of the Core Strategy, adopted on 1 February 2012, takes a sequential approach and requires a site-specific assessment in Flood Zones 2 and 3, on sites of 1 hectare or more in Zone 1, and on sites at medium or high risk from other sources identified in the strategic flood risk assessment.
Local planning authority: Surrey Heath Borough Council

Camberley lies in the Blackwater River catchment, which drains south-west toward the River Loddon. The Section 19 investigation into winter 2013/14 found a number of incidents of internal property flooding in the Camberley sub-area, at Robins Bow, Middleton Road, The Maultway and part of London Road. There are no main rivers in that investigated sub-area, although its western boundary is adjacent to the Blackwater; the nearest mapped low fluvial flood risk is more than 750 m from the incidents at Robins Bow. Middleton Road and parts of London Road lie on a surface water flow route mapped as high risk (more frequent than a 1 in 30 annual chance). The Maultway sits on the watershed with the Mill Bourne catchment. Most of the sub-area is underlain by Camberley Formation sand, with limited potential for groundwater flooding at the surface. The Core Strategy also records the Blackwater as a historic source of flooding in western Camberley, Frimley, Frimley Green and Mytchett. About six incidents of property flooding were recorded across Surrey Heath in that winter.
Surrey Heath Borough Council applies Policy DM10 (Development and Flood Risk) of the Core Strategy adopted on 1 February 2012. DM10 will not support development in Flood Zones 2 and 3, on sites of 1 hectare or greater in Zone 1, or on sites at medium or high risk from other sources identified in the SFRA, unless the sequential and exception tests are passed where relevant, a site-specific flood risk assessment shows the proposal would reduce risk or at least be risk-neutral, and identified risks can be reduced to acceptable levels. Development is expected to reduce the volume and rate of surface water run-off through SuDS. The Local Validation List 2025 also applies the national requirement for an assessment in Flood Zones 2 and 3. Surrey County Council is the Lead Local Flood Authority. Applicants should confirm the current checklist with both authorities before submitting.
Local plan: Core Strategy and Development Management Policies Development Plan Document (2012), extant saved policies of the Local Plan 2000, and the Camberley Town Centre Area Action Plan (Adopted. The Core Strategy and Development Management Policies DPD was adopted on 1 February 2012 and covers the period 2011 to 2028. It remains the statutory development plan, together with saved Local Plan 2000 policies and the Camberley Town Centre Area Action Plan, until replaced.)
CP14A: Biodiversity and Nature Conservation
Seeks to conserve and enhance biodiversity in Surrey Heath. Development that results in harm to or loss of features of interest for biodiversity will not be permitted. Particular regard is had to SPAs and SACs, SSSIs, and local sites including ancient woodland. Outside those areas, new development will where appropriate be required to contribute to the protection, management and enhancement of biodiversity.
CP13: Green Infrastructure
Seeks a network of accessible and integrated green infrastructure. Schemes that enhance existing green infrastructure, increase provision or improve connectivity are encouraged. Development that results in the loss, fragmentation or isolation of green infrastructure will be resisted. Strategic green infrastructure includes European sites and SANGs.
DM9: Design Principles
Among other design tests, development is acceptable where it protects trees and other vegetation worthy of retention and provides high quality hard and soft landscaping where appropriate.
CP14B: European Sites
Development is permitted only where it will not give rise to a likely significant adverse effect on the integrity of the Thames Basin Heaths SPA and/or the Thursley, Ash, Pirbright & Chobham Common SAC. No net new residential development is permitted within 400 m of the SPA. All net new residential development within 5 km must provide or contribute to SANG (at least 8 ha per 1,000 new occupants) and contribute to SAMM, in accordance with the adopted Avoidance Strategy. Developments of 10 or more net new dwellings are only permitted within identified SANG catchment areas.
DM10: Development and Flood Risk
Takes a sequential approach to flood risk. Development in Flood Zones 2 and 3, on sites of 1 ha or greater in Zone 1, and on sites at medium or high risk from other sources of flooding identified in the SFRA, will not be supported unless the sequential and exception tests are passed where relevant, a site-specific flood risk assessment shows the proposal would reduce risk or at least be risk-neutral, and any identified risks can be reduced to acceptable levels through design and mitigation. Development is expected to reduce the volume and rate of surface water run-off through appropriately designed SuDS.
General guidance for flood risk and drainage assessment, not formal advice for your site.
Surrey Heath Borough Council. From 1 April 2027 planning powers pass to the new West Surrey unitary council under local government reorganisation.
Policy DM10 requires a site-specific assessment in Flood Zones 2 and 3, on sites of 1 hectare or more in Zone 1, and on sites at medium or high risk from other sources identified in the SFRA. The Local Validation List 2025 also applies the national tests for Flood Zones 2 and 3.
The Section 19 report into winter 2013/14 investigates Robins Bow, Middleton Road, The Maultway and part of London Road, in the Blackwater River catchment. Surface water, rather than the main river, was the main mapped risk at those streets. The Core Strategy also records historic Blackwater flooding in western Camberley, Frimley, Frimley Green and Mytchett.
Surrey County Council, until 1 April 2027 when that role passes, with planning powers, to the new West Surrey unitary council. The Environment Agency remains responsible for main rivers including the Blackwater River.