Featured partner
Recommended for Chipping Norton

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Chipping Norton

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Civil engineering consultancy whose own site publishes a trading address at The Stables,…
Flood and drainage engineering consultancy whose own site publishes a trading address at…
Multidisciplinary consultancy whose own contact page publishes an Oxford office at The…
Civil engineering consultancy whose own site publishes a trading address at 2 Preston…
A flood risk assessment in Chipping Norton is often needed where work could affect the Chipping Norton Conservation Area, or the Cotswolds Area of Outstanding Natural Beauty. West Oxfordshire District Council is the local planning authority. Policy EH7 applies the sequential approach to flood risk, requires sustainable drainage systems, and requires a site-specific flood risk assessment in the circumstances set out in the policy. It is a historic Cotswolds market town around the Chipping Norton Conservation Area and the Cotswolds Area of Outstanding Natural Beauty, quite unlike Witney or Woodstock. The adopted West Oxfordshire Local Plan 2031 applies here. Confirm the current validation requirements with the council before submitting.
Local planning authority: West Oxfordshire District Council

Chipping Norton is in the area of West Oxfordshire District Council. It is a historic Cotswolds market town around the Chipping Norton Conservation Area and the Cotswolds Area of Outstanding Natural Beauty, quite unlike Witney or Woodstock. The adopted West Oxfordshire Local Plan 2031 applies here. The Chipping Norton Conservation Area and the Cotswolds Area of Outstanding Natural Beauty are the official features that shape flood risk and drainage work here. Oxfordshire County Council is the Lead Local Flood Authority. There is no confirmed successor council for Oxfordshire.
In Chipping Norton, including around the Chipping Norton Conservation Area and at the Cotswolds Area of Outstanding Natural Beauty, the same adopted local plan policies apply. West Oxfordshire District Council assesses flood risk and drainage under Policy EH7 of the West Oxfordshire Local Plan 2031. Policy EH7 (Flood risk) of the West Oxfordshire Local Plan 2031, adopted on 27 September 2018, provides that flood risk will be managed using the sequential, risk-based approach set out in the National Planning Policy Framework, that the Sequential Test and, if necessary, the Exception Test will be applied, that all sources of flooding will need to be addressed, that sustainable drainage systems will be integrated into the site design, and that a site-specific flood risk assessment will be required in the circumstances set out in the policy. Oxfordshire County Council is the Lead Local Flood Authority. Confirm the current validation requirements with the council before submitting.
Local plan: West Oxfordshire Local Plan 2031 (adopted)
EH3: Biodiversity and geodiversity
Policy EH3 (Biodiversity and geodiversity) of the West Oxfordshire Local Plan 2031, adopted on 27 September 2018, requires the biodiversity of West Oxfordshire to be protected and enhanced to achieve an overall net gain in biodiversity, gives the highest level of protection to sites of international and national importance, and protects irreplaceable habitats including ancient woodland and aged or veteran trees. The policy does not set a higher than statutory biodiversity net gain percentage. West Oxfordshire District Council applies the statutory 10 per cent minimum.
EH7: Flood risk
Policy EH7 (Flood risk) of the West Oxfordshire Local Plan 2031, adopted on 27 September 2018, provides that flood risk will be managed using the sequential, risk-based approach set out in the National Planning Policy Framework, that the Sequential Test and, if necessary, the Exception Test will be applied, that all sources of flooding will need to be addressed, that sustainable drainage systems will be integrated into the site design, and that a site-specific flood risk assessment will be required in the circumstances set out in the policy.
EH2: Landscape character
Policy EH2 (Landscape character) of the West Oxfordshire Local Plan 2031, adopted on 27 September 2018, provides that the quality, character and distinctiveness of West Oxfordshire's natural environment will be conserved and enhanced, and that new development should conserve and, where possible, enhance features of the local landscape such as trees, hedges, woodlands, rivers, streams and ponds.
General guidance for flood risk and drainage assessment, not formal advice for your site.
West Oxfordshire District Council. Oxfordshire County Council is the Lead Local Flood Authority. There is no confirmed successor council for Oxfordshire.
A flood risk assessment in Chipping Norton is often needed for development in or near the Chipping Norton Conservation Area or the Cotswolds Area of Outstanding Natural Beauty, including sites in flood risk areas or above the national size thresholds. Confirm the current validation requirements with the council.
Oxfordshire County Council is the Lead Local Flood Authority. There is no confirmed successor council for Oxfordshire.