Featured partner
Recommended for Esher

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Esher

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Flood risk consultancy based at Pyle Hill near Woking, on the northern edge of Guildford…
Flood risk and drainage consultancy based in Crawley, working across England and Wales.
Transport planning and infrastructure consultancy with its main office on North Street…
Transport planning and infrastructure consultancy based at Lion House, Oriental Road in…
The River Mole at Esher has a flashy response, as Surrey County Council's Section 19 report on winter 2013/14 records, together with operation of the Lower Mole Flood Alleviation Scheme and the temporary closure of Woodstock Lane South. A flood risk assessment here should show how a proposal stays safe, how it avoids passing risk downstream, and how surface water will be managed with SuDS. The local planning authority is Elmbridge Borough Council, and Surrey County Council is the Lead Local Flood Authority. Policy CS26 of the Core Strategy, adopted on 20 July 2011, requires a sequential test and those safety, off-site and drainage tests.
Local planning authority: Elmbridge Borough Council

Even though Esher is downstream of Dorking, the Section 19 report of 28 October 2015 shows a flashy response on the River Mole, with sharp peaks on 24 December 2013, 17 January and 1 February 2014. The peak flow of 148 cubic metres per second on 23 to 24 December was the largest in the gauge's 16-year record, estimated as a 1 in 150 annual chance; the 2013/14 event at Esher is separately estimated as a 1 in 50 annual chance event. The Environment Agency operated the Lower Mole Flood Alleviation Scheme on 24 and 25 December and through January and February 2014. In the wider Esher and East Molesey sub-area, no properties were reported as flooded from the River Mole or the Thames in December 2013; later Thames flooding in January and February 2014 was recorded in Molesey, not as Esher town-centre flooding. Surrey County Council temporarily closed Woodstock Lane South. The River Rythe also has a medium flood risk. Across Elmbridge there were about 100 incidents of internal property flooding that winter, predominantly fluvial.
Elmbridge Borough Council assesses flood risk under Policy CS26 of the Core Strategy, adopted on 20 July 2011, together with national policy and the council's Strategic Flood Risk Assessment. Policy CS26 requires the sequential test, that development is safe and does not increase flood risk elsewhere or constrain the flood plain, flood resistance and resilience measures in Flood Zones 2 and 3, and SuDS, with surface water in Flood Zones 2 and 3 controlled at greenfield rates. Surrey County Council is the Lead Local Flood Authority. Confirm current Environment Agency maps, the SFRA and local validation requirements with the council before submitting.
Local plan: Elmbridge Core Strategy (adopted 20 July 2011) and Development Management Plan (adopted 15 April 2015) (The Core Strategy was adopted on 20 July 2011 and the Development Management Plan on 15 April 2015. These remain the adopted development plan as of 13 November 2026. A previous draft Local Plan was withdrawn from examination in 2025 after the inspector indicated it would be found unsound. A new Local Plan is at scoping consultation (4 November to 9 December 2026), with adoption scheduled for 16 August 2029; it is not adopted. The Core Strategy plan period runs to July 2026, but the adopted policies remain in force until replaced. Under local government reorganisation, plan-making passes to the new East Surrey unitary council on 1 April 2027.)
CS15: Biodiversity
Seeks to avoid loss and contribute to a net gain in biodiversity. The policy protects designated sites, including those relevant to the Thames Basin Heaths SPA and the South West London Waterbodies SPA, protects woodland including ancient woodland, and protects priority habitats and species. Clause 8 requires that new development does not result in a net loss of biodiversity and, where feasible, contributes to a net gain through the incorporation of biodiversity features. It does not set a percentage. National sites named in the reasoned justification include Esher Common SSSI.
DM21: Nature conservation and biodiversity
Expects all new development to preserve, manage and where possible enhance existing habitats, protected species and biodiversity features, in accordance with Core Strategy Policy CS15. Support is given to proposals that incorporate new biodiversity features. Development affecting internationally designated sites is considered against Policies CS13 and CS15 and relevant legislation. Development affecting nationally designated sites will not be permitted if it would have an adverse effect, except in exceptional circumstances where the benefits clearly outweigh the harm, with avoidance, mitigation and compensation sought. Significant harm to locally designated sites or to priority habitats and species will not be permitted. Potential SANG sites identified on the Policies Map are protected from development that would compromise that function. The presumption in favour of sustainable development does not apply to development affecting international sites.
DM6: Landscape and trees
Requires development to include an integral scheme of landscape, tree retention, protection and/or planting that reflects or enhances the existing landscape, contributes to biodiversity, and does not result in the loss of or damage to significant trees and hedgerows unless, in exceptional circumstances, the benefits would outweigh the loss. Existing trees, including their root systems, must be adequately protected before, during and after construction. Loss or deterioration of irreplaceable habitats, including ancient woodland and ancient or veteran trees, is not accepted unless, in exceptional circumstances, the benefits would outweigh the loss. The policy also covers works to trees protected by a Tree Preservation Order.
CS26: Flooding
Requires development to be located, designed and laid out so that it is safe, flood risk is minimised and risk is not increased elsewhere, with residual risks safely managed. Permission is only granted where a sequential test shows the site is in the lowest appropriate flood risk zone in accordance with national policy and the Elmbridge Strategic Flood Risk Assessment, and where development would not constrain the natural function of the flood plain. Development in Flood Zones 2 or 3 requires flood resistance and resilience measures. New development must include SuDS; all development in Flood Zones 2 and 3 must control surface water runoff at greenfield rates as near to source as possible. The policy covers both fluvial and surface water flooding and takes account of climate change. Reasoned justification records comprehensive flood defence and alleviation works along the River Mole after the 1968 floods, and residual risk behind Lower Mole defences.
CS13: Thames Basin Heaths Special Protection Area
Requires new residential development likely to have a significant effect on the Thames Basin Heaths SPA to demonstrate adequate avoidance or mitigation, agreed with Natural England. A 5 km zone of influence applies, with a 400 m exclusion zone where mitigation is unlikely to protect the integrity of the SPA. Outside the exclusion zone but within 5 km, mitigation is required prior to occupation and in perpetuity, based on access management and Suitable Accessible Natural Greenspace. Applicants should check current mapping for a specific site rather than assume a town centre falls inside the zone.
General guidance for flood risk and drainage assessment, not formal advice for your site.
Elmbridge Borough Council is the local planning authority. Surrey County Council is the Lead Local Flood Authority. From 1 April 2027 planning powers pass to the new East Surrey unitary council under local government reorganisation.
Policy CS26 requires a sequential test and that development in areas at risk of flooding is safe, does not increase risk elsewhere, and includes SuDS and, in Flood Zones 2 or 3, resistance and resilience measures. The River Mole, the River Rythe and residual risk behind the Lower Mole Flood Alleviation Scheme can all be relevant. Confirm the current SFRA and validation requirements with the council.
The Section 19 report records a major event on the River Mole at Esher and the closure of Woodstock Lane South, but the reported internal property flooding from the Thames in this sub-area in January and February 2014 was in Molesey. Across Elmbridge there were about 100 internal incidents. Check current maps and the SFRA for a specific site.