Flood risk and drainage assessments in Hammersmith for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Hammersmith and Fulham rules explained

Recommended For Hammersmith

  1. Motion

    Transport planning and infrastructure consultancy with its main office on North Street…

  2. JMS Engineers

    Civil and structural engineering practice with a London office in Lambeth.

  3. RGP

    Transport and civil engineering consultancy with a Surrey office in Godalming and a…

  4. Scott White and Hookins

    Civil and structural engineering consultancy whose London office is in Sutton town centre.

At a glance

Flood risk in Hammersmith is shaped by River Thames and The Mall Conservation Area, together with surface-water drainage on and around the site. A flood risk assessment should use the current Environment Agency mapping and the council's strategic flood risk assessment, and should not borrow a neighbouring town's catchment story. London Borough of Hammersmith and Fulham is the local planning authority and the Lead Local Flood Authority, and the London Plan, published on 2 March 2021, also forms part of the development plan. Drainage proposals should show how surface water will be managed on site. Confirm the current validation requirements with the council before submitting.

Local planning authority: London Borough of Hammersmith and Fulham

Hammersmith Bridge at dusk, its suspension towers and deck lights reflected in the River Thames
Photo: Diliff, CC BY-SA 3.0

In Hammersmith

Hammersmith is the Thames-side major centre around Hammersmith Broadway Conservation Area, Hammersmith Bridge and The Mall Conservation Area, with Hammersmith Grove Conservation Area to the north. That riverside interchange is not the inland Shepherd's Bush Green story used on the Shepherd's Bush pages. Flood-risk and drainage work should be written for this centre, starting from River Thames and The Mall Conservation Area.

Rivers
River Thames — The River Thames forms the southern edge of Hammersmith at The Mall, Furnivall Gardens and Hammersmith Bridge, inside the Thames Policy Area.
Landmarks
Hammersmith Bridge — Hammersmith Bridge is the listed suspension bridge that carries the Thames crossing at the south end of Hammersmith Town Centre and is a distinctive riverside landmark.
Conservation areas
Hammersmith Broadway Conservation Area — Hammersmith Broadway Conservation Area covers the transport interchange and civic core of Hammersmith Major Centre.
The Mall Conservation Area — The Mall Conservation Area covers the historic Thames-side terrace and pubs immediately west of Hammersmith Bridge.
Hammersmith Grove Conservation Area — Hammersmith Grove Conservation Area covers the Victorian streets north of King Street, a short walk from the Broadway.
Local authority and policy

In Hammersmith, including around River Thames and Hammersmith Bridge, the London Borough of Hammersmith and Fulham assesses flood risk and drainage under Policies CC3 and CC4 of the Hammersmith and Fulham Local Plan, adopted on 28 February 2018, read with London Plan Policies SI12 and SI13. Confirm the current local validation requirements with the council before submitting. Confirm the current validation requirements with the council before submitting.

Local plan: Hammersmith and Fulham Local Plan (The Hammersmith and Fulham Local Plan was adopted on 28 February 2018 and remains the adopted local plan. A Regulation 18 consultation on a replacement plan took place in 2025 and is not treated as adopted. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)

  • OS5: Greening the Borough

    Policy OS5 of the Hammersmith and Fulham Local Plan, adopted on 28 February 2018, seeks to enhance biodiversity and green infrastructure by maximising gardens, garden space and soft landscaping, seeking green or brown roofs and other planting as part of new development, protecting gardens from new development, seeking to prevent the removal or mutilation of protected trees, seeking retention of existing trees and provision of new trees on development sites, adding to the greening of streets and the public realm, and making Tree Preservation Orders where justified in the interests of amenity. Supporting text notes that trees and soft landscaping also help to reduce rainfall run-off and the risk of surface water flooding.

  • OS4: Nature Conservation

    Policy OS4 protects nature conservation areas and green corridors identified on the Policies Map from development likely to cause demonstrable harm to their ecological value, unless the development would release a site needed to realise a qualitative gain for the local community and there is no net loss of native species and no net loss of habitat, or replacement nature conservation interest of equal or greater value is provided in the locality. Outside those areas, proposals should enhance nature conservation interest through initiatives such as new green infrastructure and habitats, tree planting and brown and green roofs, and protect any significant interest on the site and any nearby nature conservation area, appropriate to the scale and nature of the development. The policy does not set a biodiversity net gain percentage above the statutory 10 per cent minimum.

  • CC3: Minimising Flood Risk and Reducing Water Use

    Policy CC3 requires developments to reduce the use of water and minimise current and future flood risk. A site-specific flood risk assessment is required for all proposals in Flood Zones 2 and 3, all new development over 1 hectare in Flood Zone 1, all new development in surface water flooding hotspots identified in the council's Surface Water Management Plan, and all new development with a subterranean element in areas identified as being at risk from elevated groundwater levels. The FRA must address the National Planning Policy Framework, include an Exception Test where applicable, assess flooding from all relevant sources, and integrate appropriate flood-proofing. New self-contained basement flats will not be permitted in Flood Zone 3 where there is a risk of rapid inundation, or in surface water hotspots with a significant or higher flood hazard, unless a satisfactory means of escape can be provided.

  • CC4: Minimising Surface Water Run-off with Sustainable Drainage Systems

    Policy CC4 requires all proposals for new development to manage surface water run-off as close to its source as possible and on the surface where practicable, in line with the London Plan drainage hierarchy. All major developments must implement Sustainable Drainage Systems to enable a reduction in peak run-off to greenfield rates for storms up to the 1 in 100 year event plus climate change allowance, and must provide a sustainable drainage strategy. All other developments must maximise attenuation, achieving greenfield run-off rates where possible, particularly in surface water flooding hotspots or where impermeable area increases. Drainage measures should also help deliver biodiversity, amenity and water-quality objectives. All flat roofs in new developments should be living roofs to help reduce run-off, and SuDS must be retained and maintained for the lifetime of the development.

What you’ll usually need

General guidance for flood risk and drainage assessment, not formal advice for your site.

Timing and seasons
Not seasonal.
Standards
National Planning Policy Framework; Planning Practice Guidance: Flood risk and coastal change

Questions about flood risk assessments in Hammersmith

Who is the local planning authority for a flood risk assessment in Hammersmith?

London Borough of Hammersmith and Fulham. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

When is a flood risk assessment likely in Hammersmith?

When a planning application in Hammersmith could affect trees, habitats, heritage, flood risk or existing buildings around River Thames and Hammersmith Bridge. Confirm the current validation requirements with the council.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan in Hammersmith alongside the London Borough of Hammersmith and Fulham local plan.