Flood risk and drainage assessments in Harwich for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Tendring District Council rules explained

Recommended For Harwich

  1. Ardent Consulting Engineers

    Civil and environmental engineering consultancy with an office titled Essex at 1-2…

  2. J P Chick & Partners

    Civil and structural engineering practice with an Essex office at 8 Atlantic Square,…

  3. Unda

    Flood risk and drainage consultancy based in Crawley, working across England and Wales.

  4. Richard Jackson

    Civil and structural engineering consultancy with its head office at 847 The Crescent,…

Get your free quote from ROAVR Group

Tell ROAVR Group about your site in Harwich. It's free, and there's no obligation. Your request is for ROAVR Group only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

A flood risk assessment in Harwich is often needed in the Harwich Conservation Area or around the Lower Dovercourt Conservation Area, and on other sites at risk of flooding from rivers, the sea, surface water or other sources. Tendring District Council is the local planning authority. Policy PPL 1 sets the requirements for development within a flood zone, including Flood Zones 2 and 3. Policy PPL 5 seeks to ensure that new development makes adequate provision for drainage and sewerage and includes sustainable drainage systems. It is a historic port at the mouth of the Stour and Orwell, quite unlike the seaside resort of Clacton-on-Sea to the south, with official conservation areas at Harwich, covering the old town and harbour, and at Lower Dovercourt, the adjoining historic seaside streets. Confirm the current validation requirements with the council before submitting.

Local planning authority: Tendring District Council

Fishing boats in Harwich Harbour, with a blue boat in the foreground and the quay behind
Photo: Simon Mortimer, CC BY-SA 2.0

In Harwich

Harwich is in the area of Tendring District Council. It is a historic port at the mouth of the Stour and Orwell, quite unlike the seaside resort of Clacton-on-Sea to the south, with official conservation areas at Harwich, covering the old town and harbour, and at Lower Dovercourt, the adjoining historic seaside streets. The Harwich Conservation Area and the Lower Dovercourt Conservation Area are the official features that shape flood risk and drainage work here. Essex County Council is the Lead Local Flood Authority. There is no confirmed 2027 successor council for Essex.

Conservation areas
Harwich Conservation Area — The official Harwich Conservation Area, covering the historic port and old town, as designated by Tendring District Council.
Lower Dovercourt Conservation Area — The official Lower Dovercourt Conservation Area, covering the adjoining historic seaside streets of Dovercourt, as designated by Tendring District Council.
Local authority and policy

In Harwich, including around the Harwich Conservation Area and around the Lower Dovercourt Conservation Area, the same adopted local plan policies apply. Tendring District Council assesses flood risk and drainage under Policy PPL 1 and Policy PPL 5 of the Tendring District Local Plan 2013-2033 and Beyond. Policy PPL 1 sets the requirements for development within a flood zone, including Flood Zones 2 and 3. Policy PPL 5 seeks to ensure that new development makes adequate provision for drainage and sewerage and includes sustainable drainage systems. Confirm the current validation requirements with the council before submitting.

Local plan: Tendring District Local Plan 2013-2033 and Beyond (The Tendring District Local Plan 2013-2033 and Beyond is the statutory development plan as of 15 November 2026. Section 1 was adopted in January 2021 and Section 2 was adopted on 25 January 2022.)

  • PPL 4: Biodiversity and Geodiversity

    Policy PPL 4 (Biodiversity and Geodiversity) of the Tendring District Local Plan Section 2 protects sites designated for their international, European and national importance to nature conservation, and seeks a network of interconnected green and blue spaces that secures a net gain in biodiversity and geodiversity.

  • PPL 1: Development and Flood Risk

    Policy PPL 1 (Development and Flood Risk) of the Tendring District Local Plan 2013-2033 and Beyond Section 2, adopted on 25 January 2022, sets the requirements for development within a flood zone, including Flood Zones 2 and 3 as defined by the Environment Agency.

  • PPL 5: Water Conservation, Drainage and Sewerage

    Policy PPL 5 (Water Conservation, Drainage and Sewerage) of the Tendring District Local Plan Section 2 seeks to ensure that all new development makes adequate provision for drainage and sewerage and includes sustainable drainage systems.

  • PPL 11: The Area of Special Character, Frinton-on-Sea

    Policy PPL 11 of the Tendring District Local Plan 2013-2033 and Beyond Section 2 identifies the Area of Special Character at Frinton-on-Sea, covering The Avenues.

What you’ll usually need

General guidance for flood risk and drainage assessment, not formal advice for your site.

Timing and seasons
Not seasonal.
Standards
National Planning Policy Framework; Planning Practice Guidance: Flood risk and coastal change

Questions about flood risk assessments in Harwich

Who is the local planning authority for a flood risk assessment in Harwich?

Tendring District Council. Essex County Council is the Lead Local Flood Authority. There is no confirmed 2027 successor council for Essex.

When is a flood risk assessment likely in Harwich?

A flood risk assessment in Harwich is often needed in the Harwich Conservation Area or around the Lower Dovercourt Conservation Area, and on other sites at risk of flooding from rivers, the sea, surface water or other sources. Confirm the current validation requirements with the council.

What does the adopted flood policy require in Harwich?

Policy PPL 1 sets the requirements for development within a flood zone, including Flood Zones 2 and 3. Policy PPL 5 seeks to ensure that new development makes adequate provision for drainage and sewerage and includes sustainable drainage systems. Confirm the current validation requirements with the council.