Flood risk and drainage assessments in Horley for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Reigate and Banstead Borough Council rules explained

Recommended For Horley

  1. Floodline Consulting

    Flood risk consultancy based at Pyle Hill near Woking, on the northern edge of Guildford…

  2. Unda

    Flood risk and drainage consultancy based in Crawley, working across England and Wales.

  3. Motion

    Transport planning and infrastructure consultancy with its main office on North Street…

  4. Mayer Brown

    Transport planning and infrastructure consultancy based at Lion House, Oriental Road in…

Get your free quote from Floodline Consulting

Tell Floodline Consulting about your site in Horley. It's free, and there's no obligation. Your request is for Floodline Consulting only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

A flood risk and drainage assessment in Horley is often needed where development could be affected by flood risk around the Horley, Church Road Conservation Area or the Gatwick Stream. Reigate and Banstead Borough Council is the local planning authority, and Surrey County Council is the Lead Local Flood Authority. The Gatwick Stream and the wider Mole catchment bring fluvial and surface-water flood risk through the town, especially around low-lying streets near the stream. Horley is a Gatwick-fringe town whose historic church core sits apart from the later railway centre, quite unlike Redhill or Reigate on the Downs. A site-specific flood risk assessment and a drainage strategy are the usual documents. Confirm the current validation requirements with the council before submitting.

Local planning authority: Reigate and Banstead Borough Council

Horley High Street on a sunny day, with shops, a stone house and a red post box along the road
Photo: Hassocks5489, CC0

In Horley

Horley is in the area of Reigate and Banstead Borough Council. Horley is a Gatwick-fringe town whose historic church core sits apart from the later railway centre, quite unlike Redhill or Reigate on the Downs. The Horley, Church Road Conservation Area and the Gatwick Stream are the official features that shape survey work here. Surrey County Council is the Lead Local Flood Authority. From 1 April 2027 planning powers pass to the new East Surrey unitary council under local government reorganisation.

Conservation areas
Horley, Church Road Conservation Area — Officially designated as Horley, Church Road in 1970 and extended in 1990 and 2024, covering the historic heart of Horley on the Mole-catchment gravels, separate from the later railway town.
Rivers
Gatwick Stream — A tributary of the River Mole that runs through Horley, close to the Gatwick fringe, and is a recognised local flood source.
Local authority and policy

In Horley, including around Horley, Church Road Conservation Area and Gatwick Stream, the same adopted local plan policies apply. Reigate and Banstead Borough Council assesses flood risk under Policy CCF2 of the Development Management Plan, adopted on 26 September 2019, together with national policy and the council's Strategic Flood Risk Assessment (2017). Policy CCF2 requires the sequential test, a site-specific flood risk assessment in Flood Zones 2 and 3, on sites greater than 1 hectare in Flood Zone 1, and on sites with critical drainage problems or other sources of flooding, and SuDS where necessary with lifetime maintenance. Surrey County Council is the Lead Local Flood Authority. Confirm current Environment Agency maps, the SFRA and local validation requirements with the council before submitting. Confirm the current validation requirements with the council before submitting.

Local plan: Reigate and Banstead Local Plan: Core Strategy (2014, reviewed 2019 and 2024) and Development Management Plan (adopted 26 September 2019, reviewed 24 September 2024) (The Core Strategy was adopted in 2014 and reviewed in 2019 and 2024. The Development Management Plan was formally adopted on 26 September 2019; the council approved and adopted the DMP Review on 24 September 2024, finding most policies did not need updating. These documents remain the adopted development plan.)

  • CCF2: Flood risk

    Requires development to avoid areas at risk of flooding where possible and to apply the sequential test in Flood Zones 2 and 3, with the exception test where national policy requires it. A site-specific flood risk assessment is required in Flood Zones 2 and 3, on sites greater than 1 hectare in Flood Zone 1, and on sites with critical drainage problems or where a vulnerable use would be subject to other sources of flooding. Assessments must take account of climate change, show that the development will be safe for its lifetime, and have regard to the Strategic Flood Risk Assessment (2017). Proposals must not increase flood risk elsewhere and should reduce surface water run-off using SuDS where necessary, with maintenance for the lifetime of the development.

  • NHE2: Protecting and enhancing biodiversity and areas of geological importance

    Affords the highest protection to internationally designated sites, including the Mole Gap to Reigate Escarpment SAC, and requires Appropriate Assessment where significant effects are likely. Major development within 3.5 km of the SAC that may support commuting and foraging habitat must have regard to Bechstein's bat, with relevant surveys and retention or mitigation of key features plus a suitable buffer. The policy also protects SSSIs, SNCIs, RIGSs and LNRs, and expects development throughout the borough, especially in Biodiversity Opportunity Areas, to retain and enhance valued habitats and, wherever possible, to achieve a net gain in biodiversity. It does not set a percentage above the later statutory 10 per cent duty.

What you’ll usually need

General guidance for flood risk and drainage assessment, not formal advice for your site.

Timing and seasons
Not seasonal.
Standards
National Planning Policy Framework; Planning Practice Guidance: Flood risk and coastal change

Questions about flood risk assessments in Horley

Who is the local planning authority for a flood risk and drainage assessment in Horley?

Reigate and Banstead Borough Council. From 1 April 2027 planning powers pass to the new East Surrey unitary council under local government reorganisation. Surrey County Council is the Lead Local Flood Authority.

When is a flood risk assessment likely in Horley?

A site-specific flood risk assessment is often needed where development could be affected by flood risk around the Horley, Church Road Conservation Area or the Gatwick Stream. The Gatwick Stream and the wider Mole catchment bring fluvial and surface-water flood risk through the town, especially around low-lying streets near the stream. Confirm the current validation requirements with the council.

Who is the Lead Local Flood Authority for Horley?

Surrey County Council is the Lead Local Flood Authority.