Featured partner
Recommended for Maldon

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Maldon

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Civil and environmental engineering consultancy with an office titled Essex at 1-2…
Civil and structural engineering practice with an Essex office at 8 Atlantic Square,…
Flood risk and drainage consultancy based in Crawley, working across England and Wales.
Civil engineering practice at 49 Glebe Road, Kelvedon, telephone 01376 573247.
A flood risk assessment in Maldon is often needed in the Maldon Conservation Area or around The Chelmer and Blackwater Navigation Conservation Area, and on other sites at risk of flooding from rivers, the sea, surface water or other sources. Maldon District Council is the local planning authority. Policy D5 requires development to avoid high-risk flood zones where possible, or to be safe and flood-resilient where development in a flood-risk area is necessary, and to contribute positively towards the aims of the relevant flood and shoreline management plans and sustainable drainage standards. Confirm the current validation requirements with the council before submitting.
Local planning authority: Maldon District Council

Maldon is in the area of Maldon District Council. It is a historic port on the Blackwater Estuary, quite unlike the inland county town of Chelmsford or the open-coast resorts of Tendring, with an official conservation area in the town and the official Chelmer and Blackwater Navigation conservation area along the historic waterway that meets the estuary here. The Maldon Conservation Area and The Chelmer and Blackwater Navigation Conservation Area are the official features that shape flood risk and drainage work here. Essex County Council is the Lead Local Flood Authority. There is no confirmed 2027 successor council for Essex.
In Maldon, including around the Maldon Conservation Area and around The Chelmer and Blackwater Navigation Conservation Area, the same adopted local plan policies apply. Maldon District Council assesses flood risk and drainage under Policy D5 of the Maldon District Local Development Plan 2014-2029. Policy D5 requires development to avoid high-risk flood zones where possible, or to be safe and flood-resilient where development in a flood-risk area is necessary, and to contribute positively towards the aims of the relevant flood and shoreline management plans and sustainable drainage standards. Confirm the current validation requirements with the council before submitting.
Local plan: Maldon District Local Development Plan 2014-2029 (The Maldon District Local Development Plan 2014-2029 was approved on 21 July 2017 and is the statutory development plan as of 15 November 2026.)
N2: Natural Environment and Biodiversity
Policy N2 (Natural Environment and Biodiversity) of the Maldon District Local Development Plan 2014-2029, approved on 21 July 2017, seeks to protect and enhance the natural environment and biodiversity.
D5: Flood Risk and Coastal Management
Policy D5 (Flood Risk and Coastal Management) of the Maldon District Local Development Plan 2014-2029 requires development to avoid high-risk flood zones where possible, or to be safe and flood-resilient where development in a flood-risk area is necessary, and to contribute positively towards delivering the aims of the relevant flood and shoreline management plans and national and local sustainable drainage standards.
General guidance for flood risk and drainage assessment, not formal advice for your site.
Maldon District Council. Essex County Council is the Lead Local Flood Authority. There is no confirmed 2027 successor council for Essex.
A flood risk assessment in Maldon is often needed in the Maldon Conservation Area or around The Chelmer and Blackwater Navigation Conservation Area, and on other sites at risk of flooding from rivers, the sea, surface water or other sources. Confirm the current validation requirements with the council.
Policy D5 requires development to avoid high-risk flood zones where possible, or to be safe and flood-resilient where development in a flood-risk area is necessary, and to contribute positively towards the aims of the relevant flood and shoreline management plans and sustainable drainage standards. Confirm the current validation requirements with the council.
No other published town guides for this survey in the council area yet.