Flood risk and drainage assessments in Molesey for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Elmbridge Borough Council rules explained

Recommended For Molesey

  1. Floodline Consulting

    Flood risk consultancy based at Pyle Hill near Woking, on the northern edge of Guildford…

  2. Unda

    Flood risk and drainage consultancy based in Crawley, working across England and Wales.

  3. Motion

    Transport planning and infrastructure consultancy with its main office on North Street…

  4. Mayer Brown

    Transport planning and infrastructure consultancy based at Lion House, Oriental Road in…

Get your free quote from ROAVR Group

Tell ROAVR Group about your site in Molesey. It's free, and there's no obligation. Your request is for ROAVR Group only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Molesey sits at the confluence of the River Mole and the River Thames, behind the Lower Mole Flood Alleviation Scheme, so a flood risk assessment should start with those rivers rather than with flooding in Esher town centre. The local planning authority is Elmbridge Borough Council, and Surrey County Council is the Lead Local Flood Authority. Policy CS26 of the Core Strategy, adopted on 20 July 2011, requires development to be located and designed so that it is safe, flood risk is minimised and risk is not increased elsewhere. In winter 2013/14 one Molesey property flooded from the Thames in January and twelve in February, and the Environment Agency issued warnings to 1,736 then 1,770 registered owners.

Local planning authority: Elmbridge Borough Council

Molesey Lock on the River Thames, with a narrowboat in the chamber and Hampton Court Bridge in the distance
Photo: Alan Varndell, CC BY-SA 2.0

In Molesey

The Lower Mole Flood Alleviation Scheme protects an estimated 10,000 properties and was operated on 24 and 25 December 2013 and through January and February 2014. The Section 19 report is clear that the reported Thames flooding was in Molesey, not Esher town centre. The Environment Agency stationed ambassadors in Molesey for the February event. Hurst Park has a flood forum, and Riverbank in Thames Ditton was temporarily closed. Sites in the Bridge Road Conservation Area still need a site-specific assessment, with levels tied to a topographical survey.

Rivers
River Mole — The River Mole meets the River Thames in East Molesey, opposite Hampton Court. A gauge on the Mole near that confluence recorded its highest peak in 16 years of a 26-year record on 13 December 2013. East Molesey and Thames Ditton sit in the lower Mole and Thames catchments.
River Thames — The Section 19 report records one property in Molesey flooded from the Thames in January 2014 and twelve properties in February 2014. The Environment Agency issued River Thames flood warnings for Molesey to 1,736 registered owners in January 2014 and 1,770 in February 2014, and stationed flood ambassadors in Molesey for the February event.
Landmarks
Lower Mole Flood Alleviation Scheme — The Lower Mole Flood Alleviation Scheme provides protection to an estimated 10,000 properties. The Environment Agency operated the scheme on 24 and 25 December 2013 and as necessary through January and February 2014. High flows caused some bank erosion, later repaired by the Environment Agency.
Flood zones
Hurst Park — Hurst Park is the riverside neighbourhood on the Thames in Molesey. After the winter 2013/14 floods Elmbridge Borough Council set up a Hurst Park flood forum, alongside forums for Thames Ditton Island and Wheatley's Eyot.
Conservation areas
Bridge Road Conservation Area — One of two conservation areas in East Molesey designated by Elmbridge Borough Council, covering the Bridge Road approach to Hampton Court Bridge. The council publishes a designation statement, character appraisal endorsed on 18 April 2006, and a townscape map.
Green Belt
Metropolitan Green Belt — Metropolitan Green Belt wraps the southern and western edges of Molesey towards Esher and the lower Mole corridor.
Local authority and policy

Elmbridge Borough Council assesses flood risk under Policy CS26 of the Core Strategy, adopted on 20 July 2011. Development must be safe, must not increase risk elsewhere, and must satisfy the sequential test, with the exception test where national policy requires it. Surrey County Council is the Lead Local Flood Authority. Confirm the current validation requirements with the council before submitting.

Local plan: Elmbridge Core Strategy (adopted 20 July 2011) and Development Management Plan (adopted 15 April 2015) (The Core Strategy was adopted on 20 July 2011 and the Development Management Plan on 15 April 2015. These remain the adopted development plan as of 13 November 2026. A previous draft Local Plan was withdrawn from examination in 2025 after the inspector indicated it would be found unsound. A new Local Plan is at scoping consultation (4 November to 9 December 2026), with adoption scheduled for 16 August 2029; it is not adopted. The Core Strategy plan period runs to July 2026, but the adopted policies remain in force until replaced. Under local government reorganisation, plan-making passes to the new East Surrey unitary council on 1 April 2027.)

  • CS15: Biodiversity

    Seeks to avoid loss and contribute to a net gain in biodiversity. The policy protects designated sites, including those relevant to the Thames Basin Heaths SPA and the South West London Waterbodies SPA, protects woodland including ancient woodland, and protects priority habitats and species. Clause 8 requires that new development does not result in a net loss of biodiversity and, where feasible, contributes to a net gain through the incorporation of biodiversity features. It does not set a percentage. National sites named in the reasoned justification include Esher Common SSSI.

  • DM21: Nature conservation and biodiversity

    Expects all new development to preserve, manage and where possible enhance existing habitats, protected species and biodiversity features, in accordance with Core Strategy Policy CS15. Support is given to proposals that incorporate new biodiversity features. Development affecting internationally designated sites is considered against Policies CS13 and CS15 and relevant legislation. Development affecting nationally designated sites will not be permitted if it would have an adverse effect, except in exceptional circumstances where the benefits clearly outweigh the harm, with avoidance, mitigation and compensation sought. Significant harm to locally designated sites or to priority habitats and species will not be permitted. Potential SANG sites identified on the Policies Map are protected from development that would compromise that function. The presumption in favour of sustainable development does not apply to development affecting international sites.

  • DM6: Landscape and trees

    Requires development to include an integral scheme of landscape, tree retention, protection and/or planting that reflects or enhances the existing landscape, contributes to biodiversity, and does not result in the loss of or damage to significant trees and hedgerows unless, in exceptional circumstances, the benefits would outweigh the loss. Existing trees, including their root systems, must be adequately protected before, during and after construction. Loss or deterioration of irreplaceable habitats, including ancient woodland and ancient or veteran trees, is not accepted unless, in exceptional circumstances, the benefits would outweigh the loss. The policy also covers works to trees protected by a Tree Preservation Order.

  • CS26: Flooding

    Requires development to be located, designed and laid out so that it is safe, flood risk is minimised and risk is not increased elsewhere, with residual risks safely managed. Permission is only granted where a sequential test shows the site is in the lowest appropriate flood risk zone in accordance with national policy and the Elmbridge Strategic Flood Risk Assessment, and where development would not constrain the natural function of the flood plain. Development in Flood Zones 2 or 3 requires flood resistance and resilience measures. New development must include SuDS; all development in Flood Zones 2 and 3 must control surface water runoff at greenfield rates as near to source as possible. The policy covers both fluvial and surface water flooding and takes account of climate change. Reasoned justification records comprehensive flood defence and alleviation works along the River Mole after the 1968 floods, and residual risk behind Lower Mole defences.

  • CS13: Thames Basin Heaths Special Protection Area

    Requires new residential development likely to have a significant effect on the Thames Basin Heaths SPA to demonstrate adequate avoidance or mitigation, agreed with Natural England. A 5 km zone of influence applies, with a 400 m exclusion zone where mitigation is unlikely to protect the integrity of the SPA. Outside the exclusion zone but within 5 km, mitigation is required prior to occupation and in perpetuity, based on access management and Suitable Accessible Natural Greenspace. Applicants should check current mapping for a specific site rather than assume a town centre falls inside the zone.

What you’ll usually need

General guidance for flood risk and drainage assessment, not formal advice for your site.

Timing and seasons
Not seasonal.
Standards
National Planning Policy Framework; Planning Practice Guidance: Flood risk and coastal change

Questions about flood risk assessments in Molesey

Who is the local planning authority for a flood risk assessment in Molesey?

Elmbridge Borough Council. From 1 April 2027 planning powers pass to the new East Surrey unitary council under local government reorganisation.

When is a flood risk assessment likely in Molesey?

Policy CS26 applies where a site is at risk from the River Thames, the River Mole, surface water or other sources, or could increase risk elsewhere. A site-specific flood risk assessment is typically required in Flood Zones 2 and 3 and for other sites identified by national or local guidance. Confirm the current validation requirements with the council.

Did the Lower Mole Flood Alleviation Scheme prevent flooding in Molesey in 2013/14?

The scheme was operated through the winter events and protects an estimated 10,000 properties, but the Section 19 report still records one Molesey property flooded from the Thames in January 2014 and twelve in February. Hurst Park has a flood forum. A site-specific assessment is still required.