Featured partner
Recommended for Redhill

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Redhill

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Flood risk consultancy based at Pyle Hill near Woking, on the northern edge of Guildford…
Flood risk and drainage consultancy based in Crawley, working across England and Wales.
Transport planning and infrastructure consultancy with its main office on North Street…
Transport planning and infrastructure consultancy based at Lion House, Oriental Road in…
Redhill Brook, together with surface water and groundwater, flooded parts of Redhill in December 2013 and led to temporary closures of Gatton Park Road and Whitepost Hill. An assessment and drainage strategy for a site in the town should show how those sources will be managed and how a proposal will avoid passing risk onto Colesmead Road or other streets downstream. Reigate and Banstead Borough Council is the local planning authority, and Surrey County Council is the Lead Local Flood Authority. Development Management Plan Policy CCF2 (adopted 26 September 2019) applies the sequential test and sets out when a site-specific flood risk assessment is required, including in Flood Zones 2 and 3 and on larger Zone 1 sites.
Local planning authority: Reigate and Banstead Borough Council

Redhill Brook is heavily culverted and urbanised through the town and responded quickly to the storms of 23 and 24 December 2013, reaching 2.46 m above local datum on 24 December. The Section 19 report of 28 October 2015 describes a combination of surface water, fluvial and groundwater flooding, and notes that in some areas the two could not be distinguished. The brook burst its banks on 31 December 2013; emergency works diverted flow into an adjacent quarry, and a new channel was cut in March 2014. Gatton Park Road and Whitepost Hill were temporarily closed, and Surrey County Council later removed a grill and cleared silt on an ordinary watercourse at Colesmead Road. Environment Agency maps also show surface water routes along London Road/Brighton Road A23 and around ponds in Temple Wood and Serpentine Wood, with groundwater potential around the A23. Across Reigate and Banstead there were about 60 incidents of internal property flooding that winter. Policy CCF2's reasoned justification also noted a then-planned flood alleviation project in Redhill; confirm the current position with the council and the Environment Agency.
Reigate and Banstead Borough Council assesses flood risk under Policy CCF2 of the Development Management Plan, adopted on 26 September 2019, together with national policy and the council's Strategic Flood Risk Assessment (2017). Policy CCF2 requires the sequential test, a site-specific flood risk assessment in Flood Zones 2 and 3, on sites greater than 1 hectare in Flood Zone 1, and on sites with critical drainage problems or other sources of flooding, and SuDS where necessary with lifetime maintenance. Surrey County Council is the Lead Local Flood Authority. Confirm current Environment Agency maps, the SFRA and local validation requirements with the council before submitting.
Local plan: Reigate and Banstead Local Plan: Core Strategy (2014, reviewed 2019 and 2024) and Development Management Plan (adopted 26 September 2019, reviewed 24 September 2024) (The Core Strategy was adopted in 2014 and reviewed in 2019 and 2024. The Development Management Plan was formally adopted on 26 September 2019; the council approved and adopted the DMP Review on 24 September 2024, finding most policies did not need updating. These documents remain the adopted development plan.)
CCF2: Flood risk
Requires development to avoid areas at risk of flooding where possible and to apply the sequential test in Flood Zones 2 and 3, with the exception test where national policy requires it. A site-specific flood risk assessment is required in Flood Zones 2 and 3, on sites greater than 1 hectare in Flood Zone 1, and on sites with critical drainage problems or where a vulnerable use would be subject to other sources of flooding. Assessments must take account of climate change, show that the development will be safe for its lifetime, and have regard to the Strategic Flood Risk Assessment (2017). Proposals must not increase flood risk elsewhere and should reduce surface water run-off using SuDS where necessary, with maintenance for the lifetime of the development.
NHE2: Protecting and enhancing biodiversity and areas of geological importance
Affords the highest protection to internationally designated sites, including the Mole Gap to Reigate Escarpment SAC, and requires Appropriate Assessment where significant effects are likely. Major development within 3.5 km of the SAC that may support commuting and foraging habitat must have regard to Bechstein's bat, with relevant surveys and retention or mitigation of key features plus a suitable buffer. The policy also protects SSSIs, SNCIs, RIGSs and LNRs, and expects development throughout the borough, especially in Biodiversity Opportunity Areas, to retain and enhance valued habitats and, wherever possible, to achieve a net gain in biodiversity. It does not set a percentage above the later statutory 10 per cent duty.
General guidance for flood risk and drainage assessment, not formal advice for your site.
Reigate and Banstead Borough Council is the local planning authority. Surrey County Council is the Lead Local Flood Authority. From 1 April 2027 planning powers pass to the new East Surrey unitary council under local government reorganisation.
Policy CCF2 requires a site-specific flood risk assessment in Flood Zones 2 and 3, on sites greater than 1 hectare in Flood Zone 1, and on sites with critical drainage problems or other sources of flooding. In Redhill, the culverted Redhill Brook and surface water routes can be as important as fluvial maps. Confirm the current SFRA and validation requirements with the council.
The Section 19 report records a rapid response to the December 2013 storms, a peak of 2.46 m above local datum on 24 December, the brook bursting its banks on 31 December, emergency diversion into an adjacent quarry, and a new channel cut in March 2014. Gatton Park Road and Whitepost Hill were temporarily closed.