Flood risk and drainage assessments in Sandy for planning applications

  • 4 checked firms
  • Free quotes, no obligation
  • Central Bedfordshire Council rules explained

Recommended For Sandy

  1. Stomor

    Hitchin civil engineering consultancy.

  2. iStruct Consultants

    Civil and structural engineering consultancy whose own site publishes a consistent…

  3. Chiltern Design

    Civil and structural engineering practice whose own site publishes a trading address at…

Get your free quote from Stomor

Tell Stomor about your site in Sandy. It's free, and there's no obligation. Your request is for Stomor only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

A flood risk assessment in Sandy is often needed where work could affect the Sandy Conservation Area, or the Greensand Ridge Nature Improvement Area. Central Bedfordshire Council is the local planning authority. Policy CC3 requires a site-specific Flood Risk Assessment within 20 metres of any watercourse or in an area of high surface-water flood risk, and applies the sequential and exception tests. It is a greensand-ridge town around the official Sandy Conservation Area and the Greensand Ridge Nature Improvement Area, quite unlike Dunstable, Leighton Buzzard, Biggleswade or Houghton Regis. The adopted Central Bedfordshire Local Plan 2015 to 2035 applies here. Confirm the current validation requirements with the council before submitting.

Local planning authority: Central Bedfordshire Council

Sandy High Street
Photo: Robert Eva, CC BY-SA 2.0

In Sandy

Sandy is in the area of Central Bedfordshire Council. It is a greensand-ridge town around the official Sandy Conservation Area and the Greensand Ridge Nature Improvement Area, quite unlike Dunstable, Leighton Buzzard, Biggleswade or Houghton Regis. The adopted Central Bedfordshire Local Plan 2015 to 2035 applies here. The Sandy Conservation Area and the Greensand Ridge Nature Improvement Area are the official features that shape flood risk and drainage work here. Central Bedfordshire Council is the Lead Local Flood Authority. There is no confirmed successor council for Central Bedfordshire.

Conservation areas
Sandy Conservation Area — The official Sandy Conservation Area, as named in Central Bedfordshire Council's official conservation-areas dataset published on the council's planning open-data page.
Other
Greensand Ridge Nature Improvement Area — The official Greensand Ridge Nature Improvement Area, identified and protected by Policy EE8 of the adopted Central Bedfordshire Local Plan 2015 to 2035, which includes land around Sandy.
Local authority and policy

In Sandy, including around the Sandy Conservation Area and at the Greensand Ridge Nature Improvement Area, the same adopted local plan policies apply. Central Bedfordshire Council assesses flood risk and drainage under Policy CC3 of the Central Bedfordshire Local Plan 2015 to 2035. Policy CC3 (Flood Risk Management) of the Central Bedfordshire Local Plan 2015 to 2035, adopted on 22 July 2021, requires a site-specific Flood Risk Assessment for any site within 20 metres of any watercourse, including those not shown on the Environment Agency flood maps, or within an area at high risk of surface water flooding. Development will be supported where it is located in areas at lowest risk of flooding from all sources, the sequential and exception tests demonstrate that the site is appropriate, a sequential approach to site layout is applied, the development will be safe for its lifetime and will not increase flood risk elsewhere, and surface water runoff is managed to pre-development rates and volumes, giving priority to the use of SuDS. Central Bedfordshire Council is the Lead Local Flood Authority. Confirm the current validation requirements with the council before submitting.

Local plan: Central Bedfordshire Local Plan 2015 to 2035 (adopted)

  • EE4: Trees, Woodlands and Hedgerows

    Policy EE4 (Trees, Woodlands and Hedgerows) of the Central Bedfordshire Local Plan 2015 to 2035, adopted on 22 July 2021, provides that development proposals will be permitted where they do not adversely affect ancient woodland and aged and veteran trees; where woodlands, traditional orchards, hedgerows and specimen trees found outside woodlands are protected and buffered; where existing hedgerows and trees are incorporated to enhance developments; and where any removal of trees or hedgerows to accommodate development is justified and lost assets are replaced within the development site with appropriate planting of suitable species of equivalent scale and character, providing equivalent canopy cover and habitat connectivity.

  • EE2: Enhancing Biodiversity

    Policy EE2 (Enhancing Biodiversity) of the Central Bedfordshire Local Plan 2015 to 2035, adopted on 22 July 2021, provides that development proposals will be permitted where they provide a net gain in biodiversity through the conservation, restoration, enhancement and creation of ecological networks of habitats, species and sites. Proposals should avoid negative impacts on biodiversity and geodiversity; where this is not possible they must mitigate unavoidable impacts and, as a last resort, compensate for residual impacts, delivering a net gain in biodiversity. The policy does not set a higher than statutory biodiversity net gain percentage. Central Bedfordshire Council applies the statutory 10 per cent minimum.

  • EE3: Nature Conservation

    Policy EE3 (Nature Conservation) of the Central Bedfordshire Local Plan 2015 to 2035, adopted on 22 July 2021, requires up-to-date, comprehensive ecological surveys undertaken in accordance with industry guidelines and standards to support and inform development proposals that would affect sites for nature conservation, protected species, or species and habitats of principal importance, demonstrating that development will deliver a net gain. Proposals will be permitted where they do not have an adverse effect, either alone or in-combination, on European designated sites unless they satisfy the Habitats Regulations, will not adversely affect SSSIs, National Nature Reserves and Roadside Nature Reserves, and are designed to prevent any adverse impact on County Wildlife Sites, Local Nature Reserves, local geological or geomorphological sites, protected species, or species and habitats of principal importance. The policy does not set a higher than statutory biodiversity net gain percentage. Central Bedfordshire Council applies the statutory 10 per cent minimum.

  • CC3: Flood Risk Management

    Policy CC3 (Flood Risk Management) of the Central Bedfordshire Local Plan 2015 to 2035, adopted on 22 July 2021, requires a site-specific Flood Risk Assessment for any site within 20 metres of any watercourse, including those not shown on the Environment Agency flood maps, or within an area at high risk of surface water flooding. Development will be supported where it is located in areas at lowest risk of flooding from all sources, the sequential and exception tests demonstrate that the site is appropriate, a sequential approach to site layout is applied, the development will be safe for its lifetime and will not increase flood risk elsewhere, and surface water runoff is managed to pre-development rates and volumes, giving priority to the use of SuDS.

What you’ll usually need

General guidance for flood risk and drainage assessment, not formal advice for your site.

Timing and seasons
Not seasonal.
Standards
National Planning Policy Framework; Planning Practice Guidance: Flood risk and coastal change

Questions about flood risk assessments in Sandy

Who is the local planning authority for a flood risk assessment in Sandy?

Central Bedfordshire Council. Central Bedfordshire Council is the Lead Local Flood Authority. There is no confirmed successor council for Central Bedfordshire.

When is a flood risk assessment likely in Sandy?

A flood risk assessment in Sandy is often needed for development in or near the Sandy Conservation Area or the Greensand Ridge Nature Improvement Area, including sites in flood risk areas or above the national size thresholds. Confirm the current validation requirements with the council.

Who is the Lead Local Flood Authority for Sandy?

Central Bedfordshire Council is the Lead Local Flood Authority. There is no confirmed successor council for Central Bedfordshire.