Featured partner
Recommended for Welwyn Garden City

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Welwyn Garden City

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Hertfordshire civil engineering and transport planning consultancy trading as EAS, with…
Consulting engineers with a St Albans office at Phoenix House, Campfield Road.
Hitchin civil engineering consultancy.
Flood risk and drainage consultancy based in Crawley, working across England and Wales.
A flood risk and drainage assessment in Welwyn Garden City is often needed where development could be affected by flood risk around the Welwyn Garden City Conservation Area or the Beehive Conservation Area. Welwyn Hatfield Borough Council is the local planning authority, and Hertfordshire County Council is the Lead Local Flood Authority. Ordinary watercourses and surface water across the planned layout are the usual flood considerations. Welwyn Garden City is a planned garden city around a formal axis, quite unlike Old Hatfield and Hatfield House. A site-specific flood risk assessment and a drainage strategy are the usual documents. Confirm the current validation requirements with the council before submitting.
Local planning authority: Welwyn Hatfield Borough Council

Welwyn Garden City is in the area of Welwyn Hatfield Borough Council. Welwyn Garden City is a planned garden city around a formal axis, quite unlike Old Hatfield and Hatfield House. The Welwyn Garden City Conservation Area and the Beehive Conservation Area are the official features that shape survey work here. Hertfordshire County Council is the Lead Local Flood Authority. There is no confirmed 2027 successor council for Hertfordshire.
In Welwyn Garden City, including around Welwyn Garden City Conservation Area and Beehive Conservation Area, the same adopted local plan policies apply. Welwyn Hatfield Borough Council assesses flood risk under Policy SADM14 of the Local Plan 2016-2036, adopted on 12 October 2023, together with national policy. SADM14 requires sustainable drainage and flood-risk management, and the protection and naturalisation of watercourses where appropriate. Hertfordshire County Council is the Lead Local Flood Authority. Confirm the current validation requirements with the council before submitting.
Local plan: Welwyn Hatfield Local Plan 2016-2036 (The Local Plan 2016-2036 was adopted on 12 October 2023 and remains the statutory development plan as of 15 November 2026.)
SADM14: Flood risk and surface water management
Requires sustainable drainage, the protection and naturalisation of watercourses where appropriate, and flood-risk management that can also support biodiversity.
SP11: Protection and enhancement of critical environmental assets
Protects and enhances critical environmental assets, including biodiversity, ecological networks, landscape and the historic environment.
SADM16: Ecology and landscape
Requires the protection, conservation and enhancement of biodiversity and ecological networks. A former local 10 per cent biodiversity net gain requirement in earlier drafting has been superseded by the statutory framework.
General guidance for flood risk and drainage assessment, not formal advice for your site.
Welwyn Hatfield Borough Council. There is no confirmed 2027 successor council for Hertfordshire. Hertfordshire County Council is the Lead Local Flood Authority.
A site-specific flood risk assessment is often needed where development could be affected by flood risk around the Welwyn Garden City Conservation Area or the Beehive Conservation Area. Ordinary watercourses and surface water across the planned layout are the usual flood considerations. Confirm the current validation requirements with the council.
Hertfordshire County Council is the Lead Local Flood Authority.