Featured partner
Recommended for Ash

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Ash

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Multi-disciplinary practice founded in 1985, offering arboriculture, ecology, landscape…
Ecological consultancy owned by Surrey Wildlife Trust, based at the Trust's offices in…
Independent ecology consultancy with its head office in Leatherhead, Surrey.
A preliminary ecological appraisal in Ash is often the first ecology report where development could affect habitats in the Basingstoke Canal South Conservation Area or around the Ash Manor. Guildford Borough Council is the local planning authority. The canal SSSI, moat, ponds and nearby heathland edge can support bats, reptiles, amphibians and other protected species, and the Thames Basin Heaths SPA also influences new homes. Ash is a large Blackwater Valley settlement, with Ash Vale and Ash Green, quite separate from Guildford town on the Wey. The appraisal identifies habitats and the further surveys that may follow. Confirm the current validation requirements with the council before submitting.
Local planning authority: Guildford Borough Council

Ash is in the area of Guildford Borough Council. Ash is a large Blackwater Valley settlement, with Ash Vale and Ash Green, quite separate from Guildford town on the Wey. The Basingstoke Canal South Conservation Area and the Ash Manor are the official features that shape survey work here. Surrey County Council is the Lead Local Flood Authority. From 1 April 2027 planning powers pass to the new West Surrey unitary council under local government reorganisation.
In Ash, including around Basingstoke Canal South Conservation Area and Ash Manor, the same adopted local plan policies apply. Guildford Borough Council asks for a biodiversity assessment with applications where the site is in or next to a nationally designated habitat site, within 8 metres of a watercourse or its corridor, or known or likely to contain protected species or habitats. Policy ID4 of the Local Plan: Strategy and Sites (2019) protects SPAs and SACs, SSSIs, Sites of Nature Conservation Importance and Local Nature Reserves, and requires Habitats Regulations Assessment where a European site could be affected. Policy P6 of the Development Management Policies (2023) requires the mitigation hierarchy to be applied to irreplaceable and priority habitats and species, and Policy P10 sets a minimum 10-metre undeveloped buffer to main rivers. A PEA is usually the first step to show these policies have been addressed. Confirm the current validation requirements with the council before submitting.
Local plan: Guildford Borough Local Plan: Strategy and Sites (2019) and Development Management Policies (2023) (Adopted. A new-style Guildford Local Plan is being prepared (timetable published 5 June 2026; planned adoption 30 April 2029) and will replace both parts.)
P1: Surrey Hills Area of Outstanding Natural Beauty and Area of Great Landscape Value
Conserves and enhances the AONB, presumes against major development there, and protects its setting; the AGLV is kept until the AONB boundary review ends.
D1: Place shaping
Overarching design and place-making policy (not specific to surveys).
D13: The Corridor of The River Wey & Godalming Navigations
Development affecting the Navigations must conserve their character, setting, ecology and heritage and integrate flood mitigation sensitively.
D12: Light Impacts and Dark Skies
Lighting schemes need a Light Impact Assessment covering wildlife; light spill into habitats and buffers must be avoided; extra protection in darker parts of the Surrey Hills.
D20: Conservation Areas
Development in conservation areas must preserve or enhance their character (title verified; detailed wording not re-read for this pack).
ID4: Green and blue infrastructure
Protects SPAs/SACs, SSSIs, SNCIs and Local Nature Reserves; seeks biodiversity gains, especially in Biodiversity Opportunity Areas; protects watercourse corridors.
P10: Water Quality, Waterbodies and Riparian Corridors
No deterioration of waterbodies; an undeveloped buffer of at least 10m from the top of bank on both sides of a main river, with a Landscape and Ecological Management Plan; no new culverting.
P11: Sustainable Surface Water Management
Greenfield run-off rates for greenfield sites; as close as practicable on brownfield; maximise permeable surfaces; follow the SuDS hierarchy and Surrey LLFA guidance; infiltration needs 1m clearance above groundwater.
P2: Green Belt
Inappropriate development in the Metropolitan Green Belt is refused unless very special circumstances exist; defines how extensions and replacement buildings are judged.
P4: Flooding, flood risk and groundwater protection zones
Development in medium/high flood risk areas needs a site-specific FRA, sequential/exception tests and safe access; undeveloped flood zone 3b is safeguarded; all schemes must show no increase in run-off and prioritise SuDS; protects Source Protection Zones.
P5: Thames Basin Heaths Special Protection Area
No net new homes within 400m of the SPA; new homes within 400m–5km must provide SANG and SAMM; schemes of 50+ homes at 5–7km assessed case by case.
P6: Protecting Important Habitats and Species
Protects irreplaceable and priority habitats and species; where ancient woodland is in or next to a site, a BS5837 survey locating ancient/veteran trees and a buffer of at least 15m are required.
P7: Biodiversity in New Developments
The adopted policy text sought at least 20% biodiversity net gain using the national metric, with gains secured for 30+ years, maximum on-site gain and features for wildlife on buildings. Following the National Planning Policy Framework published on 17 August 2026 the statutory 10% minimum applies except where a higher figure is justified on a specific site allocation.
General guidance for preliminary ecological appraisal (pea), not formal advice for your site.
Guildford Borough Council. From 1 April 2027 planning powers pass to the new West Surrey unitary council under local government reorganisation. Surrey County Council is the Lead Local Flood Authority.
It is often the first ecology report where development could affect habitats in the Basingstoke Canal South Conservation Area or around the Ash Manor. Confirm the current validation requirements with the council.
It can identify the need for further surveys, such as bat, reptile or other protected species work, before an application is submitted.