Preliminary ecological appraisals in Cambridge for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Cambridge City Council rules explained

Recommended For Cambridge

  1. MKA Ecology

    Ecological consultancy whose own site publishes a Cambridge head office at 1 New…

  2. Skilled Ecology Consultancy

    Family-owned ecological consultancy whose own site publishes a postal address at…

  3. CSA Environmental

    Environmental consultancy trading as CSA Environmental, with a Hertfordshire office at…

  4. Greenwillows Associates

    Independent ecological and arboricultural consultancy whose own site publishes a…

At a glance

A preliminary ecological appraisal in Cambridge is often needed where work could affect the Central Conservation Area, or the River Cam. Cambridge City Council is the local planning authority. Policy 69 and Policy 70 protect designated sites, priority species and habitats and seek no net loss or a net gain. Cambridge City Council applies the statutory 10 per cent biodiversity net gain minimum. It is a historic university city around the official Central Conservation Area and the River Cam, quite unlike Huntingdon, St Neots or St Ives. The adopted Cambridge Local Plan 2018 applies here. Confirm the current validation requirements with the council before submitting.

Local planning authority: Cambridge City Council

King's College Chapel and the Backs, seen across the River Cam
Photo: Christopher Hilton, CC BY-SA 2.0

In Cambridge

Cambridge is in the area of Cambridge City Council. It is a historic university city around the official Central Conservation Area and the River Cam, quite unlike Huntingdon, St Neots or St Ives. The adopted Cambridge Local Plan 2018 applies here. The Central Conservation Area and the River Cam are the official features that shape preliminary ecological appraisal work here. Cambridgeshire County Council is the Lead Local Flood Authority. There is no confirmed successor council for Cambridge.

Conservation areas
Central Conservation Area — The official Central Conservation Area, also referred to in the Cambridge Historic Core Conservation Area Appraisal as Central Conservation Area No. 1, of which the historic core is a sector. The appraisal is listed on Greater Cambridge Shared Planning's official conservation area appraisals page.
Rivers
River Cam — The River Cam, the official river running through Cambridge and identified in the adopted Cambridge Local Plan 2018.
Local authority and policy

In Cambridge, including around the Central Conservation Area and at the River Cam, the same adopted local plan policies apply. Cambridge City Council assesses ecology under Policy 70 of the Cambridge Local Plan 2018. Policy 70 (Protection of priority species and habitats) of the Cambridge Local Plan 2018, adopted on 18 October 2018, provides that development will be permitted which protects priority species and habitats and enhances habitats and populations of priority species. Proposals that harm or disturb populations and habitats should minimise any ecological harm and secure achievable mitigation and/or compensatory measures, resulting in either no net loss or a net gain of priority habitat and local populations of priority species. Where significant harm cannot be avoided, adequately mitigated or, as a last resort, compensated for, planning permission will be refused. The policy does not set a higher than statutory biodiversity net gain percentage. Cambridge City Council applies the statutory 10 per cent minimum. Confirm the current validation requirements with the council before submitting.

Local plan: Cambridge Local Plan 2018 (adopted)

  • 69: Protection of sites of biodiversity and geodiversity importance

    Policy 69 (Protection of sites of biodiversity and geodiversity importance) of the Cambridge Local Plan 2018, adopted on 18 October 2018, provides that, in determining any planning application affecting a site of biodiversity or geodiversity importance, development will be permitted if it will not have an adverse impact on, or lead to the loss of, part or all of a site identified on the Policies Map. Regard must be had to the international, national or local status and designation of the site and the nature and quality of the site's intrinsic features, including its rarity. Where development is permitted, proposals must include measures to minimise harm, to secure achievable mitigation and/or compensatory measures, and where possible enhance the nature conservation value of the site affected. The policy does not set a higher than statutory biodiversity net gain percentage. Cambridge City Council applies the statutory 10 per cent minimum.

  • 70: Protection of priority species and habitats

    Policy 70 (Protection of priority species and habitats) of the Cambridge Local Plan 2018, adopted on 18 October 2018, provides that development will be permitted which protects priority species and habitats and enhances habitats and populations of priority species. Proposals that harm or disturb populations and habitats should minimise any ecological harm and secure achievable mitigation and/or compensatory measures, resulting in either no net loss or a net gain of priority habitat and local populations of priority species. Where significant harm cannot be avoided, adequately mitigated or, as a last resort, compensated for, planning permission will be refused. The policy does not set a higher than statutory biodiversity net gain percentage. Cambridge City Council applies the statutory 10 per cent minimum.

  • 32: Flood risk

    Policy 32 (Flood risk) of the Cambridge Local Plan 2018, adopted on 18 October 2018, requires it to be demonstrated that the peak rate and post-development volume of run-off over the lifetime of the development, allowing for climate change, are no greater than for the undeveloped site; that flooding of property in and adjacent to the development would not occur for a 1 in 100 year event plus climate change, including in the event of local drainage system failure; that discharge locations have capacity; and that a management and maintenance plan is in place for the lifetime of the development. Discharge should be to ground via infiltration first, then to a water body, then to a surface water sewer. Discharge to a foul water or combined sewer is unacceptable. Development is also required to be supported by an assessment of the flood risk to the development.

  • 71: Trees

    Policy 71 (Trees) of the Cambridge Local Plan 2018, adopted on 18 October 2018, provides that development will not be permitted which involves felling, significant surgery or potential root damage to trees of amenity or other value, unless there are demonstrable public benefits accruing from the proposal which clearly outweigh the current and future amenity value of the trees. Development proposals should preserve, protect and enhance existing trees and hedges that have amenity value as perceived from the public realm; provide appropriate replacement planting where felling is proved necessary; and provide sufficient space for trees and other vegetation to mature. Particular consideration should be given to veteran or ancient trees, as defined by Natural England, in order to preserve their historic, ecological and amenity value.

What you’ll usually need

General guidance for preliminary ecological appraisal (pea), not formal advice for your site.

Timing and seasons
Possible all year; spring and summer give the most reliable habitat records.
Standards
CIEEM Guidelines for Preliminary Ecological Appraisal

Questions about peas in Cambridge

Who is the local planning authority for a preliminary ecological appraisal in Cambridge?

Cambridge City Council. Cambridgeshire County Council is the Lead Local Flood Authority. There is no confirmed successor council for Cambridge.

When is a preliminary ecological appraisal likely in Cambridge?

A preliminary ecological appraisal in Cambridge is often needed where development could affect habitats or species in the Central Conservation Area or at the River Cam. Confirm the current validation requirements with the council.

Why do official features matter for ecology work in Cambridge?

The Central Conservation Area and the River Cam are official features that can support habitats and protected species, so an appraisal is often used to identify constraints before a planning application is drawn up. Confirm the current validation requirements with the council.