Featured partner
Recommended for Egham

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Egham

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Multi-disciplinary practice founded in 1985, offering arboriculture, ecology, landscape…
Independent ecology consultancy with its head office in Leatherhead, Surrey.
Independent ecological consultancy with a Surrey office near Farnham, plus offices in…
Priority habitats and species along the River Thames and at Egham Hythe are typical reasons a preliminary ecological appraisal in Egham should look beyond the red line. Policy EE10 may also apply if a site falls in the Thames Basin Heaths SPA zones of influence. The local planning authority is Runnymede Borough Council. Policy EE9 of the Runnymede 2030 Local Plan, adopted on 16 July 2020, applies a hierarchy of designated sites and seeks net gains in biodiversity. A PEA is the first look at those habitats and species, and at the further surveys a planning application may need.
Local planning authority: Runnymede Borough Council

The River Thames through Egham Hythe and Hythe End is the main wildlife corridor at the edge of the town, with further habitat in parks, gardens and the Metropolitan Green Belt. A PEA should look beyond the red line to the river, to Policy EE12 blue-infrastructure buffers, and, where relevant, to the Thames Basin Heaths SPA under Policy EE10. Buildings, trees and wet ground can support bats, reptiles, water voles and nesting birds that later surveys may need to address.
Runnymede Borough Council assesses effects on habitats and species under Policy EE9 of the Runnymede 2030 Local Plan, adopted on 16 July 2020, and under Policy EE10 where residential development could affect the Thames Basin Heaths SPA. Policy EE12 also protects blue infrastructure. A PEA is the usual way to show whether further protected-species or habitat surveys are needed, and it sits alongside any biodiversity net gain assessment. Confirm the current local validation requirements with the council before submitting.
Local plan: Runnymede 2030 Local Plan (Adopted on 16 July 2020 and still in force. The council adopted a timetable for a new Local Plan on 25 February 2026, with issues and options scoping consultation from 7 September to 12 October 2026; the new plan had not been adopted as of 13 November 2026.)
EE10: Thames Basin Heaths Special Protection Area
No additional residential development within 400 m of the SPA. Non-residential development within 400 m may require Appropriate Assessment. All additional residential development beyond 400 m but within 5 km must provide adequate avoidance measures, generally SANG and SAMM.
EE12: Blue Infrastructure
Protects and enhances rivers and other waterbodies, including buffers, deculverting and fish passage, and requires SuDS designs to take account of wildlife.
EE1: Townscape and Landscape Quality
Requires development to respect and enhance townscape and landscape quality, including the setting of the River Thames and historic landscapes around Egham.
General guidance for preliminary ecological appraisal (pea), not formal advice for your site.
Runnymede Borough Council. From 1 April 2027 planning powers pass to the new West Surrey unitary council under local government reorganisation.
Where a site contains or is next to habitats, watercourses, buildings or trees that could support protected or priority species, or designated sites under Policy EE9. Sites on the River Thames at Egham Hythe should also consider Policy EE12. Confirm the current list with the council.
No. A PEA identifies habitats, species and further survey needs. A net gain assessment uses the statutory metric to show at least 10 per cent gain. Many applications need both.