Featured partner
Recommended for Peckham

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Peckham

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Environmental and ecology consultancy with a London office at Holyrood Street, near…
London environmental consultancy based at Marshalsea Road, Southwark, formerly trading…
Independent ecology consultancy with its head office in Leatherhead, Surrey.
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Peckham Rye and Peckham Town Centre are a frequent reason for a preliminary ecological appraisal in Peckham. The appraisal identifies habitats and the likelihood of protected species so that further surveys can be programmed. The local planning authority is the London Borough of Southwark. Policy P60 of the Southwark Plan, adopted on 23 February 2022, requires development to protect designated sites, protected species and priority habitats, and to contribute to net gains in biodiversity. Policy G6 of the London Plan, published on 2 March 2021, also forms part of the development plan.
Local planning authority: London Borough of Southwark

An appraisal in Peckham Town Centre, along Rye Lane or around Peckham Library should consider links to Peckham Rye and any railway or garden habitat. Elephant and Castle, Canada Water, Camberwell and Dulwich are areas covered on these pages, or later tests for other major centres, rather than part of Peckham Town Centre itself.
The London Borough of Southwark assesses ecological appraisals under Policy P60 of the Southwark Plan, adopted on 23 February 2022, together with Policy G6 of the London Plan, published on 2 March 2021. Confirm the current local validation requirements with the council before submitting.
Local plan: Southwark Plan 2022 (The Southwark Plan 2019–2036 was adopted on 23 February 2022 and remains the adopted local plan. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
P60: Biodiversity
Policy P60 requires development to contribute to net gains in biodiversity by enhancing and protecting SINCs, Local Nature Reserves, protected species and priority habitats. It does not set a percentage above the national minimum.
P61: Trees
Policy P61 of the Southwark Plan, adopted on 23 February 2022, requires significant existing trees to be retained and protected, including trees of high amenity value, trees in conservation areas, and veteran, ancient and notable trees, and requires retained trees to be protected during construction in line with BS5837.
P68: Reducing flood risk
Policy P68 requires development not to increase flood risk on or off site, sets finished floor levels in areas at risk of flooding, and requires major development to reduce surface water run-off to greenfield rates through sustainable drainage. Tidal flood risk from the Thames is identified in the north of the borough, not in Peckham Town Centre.
General guidance for preliminary ecological appraisal (pea), not formal advice for your site.
The London Borough of Southwark. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
An appraisal is often needed where a proposal may affect Peckham Rye or other habitats in or next to Peckham Town Centre, so that any further protected species surveys can be programmed.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policy G6 deals with biodiversity alongside Policy P60.