Protected species surveys in Ealing for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Ealing rules explained

Recommended For Ealing

  1. Aven Ecology

    London-based ecological consultancy in Muswell Hill.

  2. Greengage Environmental

    Environmental and ecology consultancy with a London office at Holyrood Street, near…

  3. Eight Versa

    London environmental consultancy based at Marshalsea Road, Southwark, formerly trading…

  4. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

Get your free quote from Aven Ecology

Tell Aven Ecology about your site in Ealing. It's free, and there's no obligation. Your request is for Aven Ecology only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

The River Brent, Brent River Park and the parkland at Walpole Park and Ealing Common can support bats, reptiles and nesting birds, so a protected species survey in Ealing often has to look at those spaces as well as the application site. For applications the local planning authority is the London Borough of Ealing. Policy 5.4 of the Core Strategy, adopted on 3 April 2012, protects nature conservation sites and priority species, and requires biodiversity to be considered where development is proposed in or adjacent to green spaces and waterways.

Local planning authority: London Borough of Ealing

Ealing Common in spring, with trees, daffodils and the white railings along the road
Photo: Alan Hughes, CC BY-SA 2.0

In Ealing

Lammas Park, Pitshanger Park, Ealing Green and gardens in the Ealing Green Conservation Area add further habitat around Ealing Town Centre. A PEA should identify which species surveys are actually needed on the specific site.

Rivers
River Brent — The main river corridor through the borough, identified in the Core Strategy for nature conservation and flood management, including the stretch through Brent River Park west and north of Ealing Town Centre.
Local character
Ealing Town Centre — A Metropolitan Centre focused on Ealing Broadway, the main search centre for this borough page.
Ealing Broadway — The Broadway frontage and station area at the heart of Ealing Town Centre, the principal search name for this Metropolitan Centre.
Other
Ealing Common — A large common and open space east of Ealing Town Centre, also identified in the Core Strategy as a priority site for improving access to nature.
Walpole Park — A historic park immediately south-west of Ealing Town Centre, named in the Core Strategy with Lammas Park as a site of local importance for nature conservation with potential for enhancement.
Brent River Park — The parkland corridor along the River Brent, identified in the Core Strategy as a green corridor managed particularly for nature conservation and flood management.
Ealing Green — The historic green south of Ealing Town Centre, within the Ealing Green Conservation Area and next to Walpole Park.
Lammas Park — A park adjoining Walpole Park, named with it in the Core Strategy as a nature conservation site with potential for enhancement.
Haven Green — The open space beside Ealing Broadway station at the northern edge of Ealing Town Centre, an important tree and public-realm setting for the Metropolitan Centre.
Pitshanger Park — A park on the River Brent north of Ealing Town Centre, identified in the Core Strategy as a priority site for improving access to nature.
Cleveland Park — Parkland on the north side of Ealing Town Centre, part of the leafy setting between the centre and the River Brent corridor.
Conservation areas
Ealing Green Conservation Area — The conservation area covering Ealing Green and the historic setting around Walpole Park, south of Ealing Town Centre.
Local authority and policy

The London Borough of Ealing assesses effects on protected and priority species under Policy 5.4 of the Core Strategy, adopted on 3 April 2012, together with London Plan Policy G6, published on 2 March 2021. Confirm the current local validation requirements with the council before submitting.

Local plan: Ealing Development (Core) Strategy 2026 (adopted 3 April 2012), Ealing Development Management DPD (adopted 10 December 2013) and The London Plan 2021 (published 2 March 2021) (The Development (Core) Strategy was adopted on 3 April 2012 and the Development Management DPD on 10 December 2013. Both remain the adopted borough development plan as of 13 November 2026, together with the London Plan 2021, published on 2 March 2021. A new Ealing Local Plan has reached proposed main modifications, including a draft 20 per cent biodiversity net gain figure; it is not adopted and is not used in these drafts. The draft London Plan 2026 is in consultation and is not adopted. There is no 2027 successor council. The London Borough of Ealing is the local planning authority and the Lead Local Flood Authority.)

  • 5.10: Urban Greening

    Ealing's local variation to London Plan urban greening policy requires development proposals to replace existing trees and plantings on the basis of no net loss of amenity. Provision for trees or plantings on site should replace those lost in consequence of the development; the quality and type of amenity offered should be the same or better.

  • 5.11: Green Roofs and Development Site Environs

    Ealing's local variation strongly encourages green roofs on all development where appropriate in design, contextual and conservation terms, and requires green roofs on major development within 100 metres of Green Belt, Metropolitan Open Land, a Green Corridor, Public Open Space, Community Open Space or a Site of Importance for Nature Conservation. Where amenity and biodiversity functions conflict in that buffer, biodiversity should take precedence.

  • 5.12: Flood Risk Management

    Ealing's local variation requires all development, including that on land that is not part of a defined floodplain, to ensure it is not vulnerable to surface water, sewer and groundwater flooding. New development that reduces the capacity of the floodplain or is in any way vulnerable to flooding will not be permitted within an 8 metre buffer along all main rivers and a 5 metre buffer alongside all ordinary watercourses. There is a general presumption against treatments that do not take a sustainable approach to drainage in domestic gardens and open space.

  • 5.4: Protect the Natural Environment – Biodiversity and Geodiversity

    Requires the council to protect and promote the network of nature conservation sites by enhancing their natural value and improving access, particularly in areas of deficiency. Biodiversity will be considered in the management of all green spaces and the network of waterways, and where development is proposed in or adjacent to such spaces. Particular priority is also placed on protecting sites not formally designated, including gardens and private amenity space, and on priority species identified in Biodiversity Action Plans.

  • 7B: Design Amenity

    Requires new development to achieve a high standard of amenity for users and adjacent uses, including high quality architecture, good levels of daylight, sunlight and privacy, coherent site development, a positive visual impact, and legibility and accessibility. External treatments must complement the building and context.

  • G6: Biodiversity and access to nature

    London Plan Policy G6 requires development proposals to manage impacts on biodiversity and aim to secure net biodiversity gain. Sites of Importance for Nature Conservation should be protected. The policy does not set a percentage.

  • G7: Trees and woodlands

    Requires existing trees of value to be retained wherever possible. Where trees are removed, there should be adequate replacement based on the value of the benefits lost, determined by a method such as i-Tree or CAVAT. Additional planting, particularly of large-canopied species, should generally be included.

  • SI 12: Flood risk management

    Requires development proposals to minimise and mitigate flood risk and address residual risk, including, where possible, making space for water and setting development back from watercourses. In London the boroughs are the Lead Local Flood Authorities.

What you’ll usually need

General guidance for protected species survey, not formal advice for your site.

Timing and seasons
Most surveys are seasonal and the window depends on the species.
Standards
Species-specific guidance (e.g. Natural England standing advice)

Questions about protected species surveys in Ealing

Who is the local planning authority for a protected species survey in Ealing?

London Borough of Ealing. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

Which protected species are typically considered in Ealing?

Depending on the site, further survey may be needed for bats, reptiles, amphibians or nesting birds, particularly along the River Brent and at Ealing Common, Walpole Park and Brent River Park. A PEA should identify what is actually needed.

Do nature conservation sites change what is required?

Yes. Policy 5.4 protects the network of nature conservation sites, including parks such as Walpole Park and Lammas Park. A survey should consider effects on those sites where they are relevant to the proposal.