Featured partner
Recommended for Egham

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Egham

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Surveying and construction consultancy with its head office at Merrow Business Park in…
Land surveying company based in Shere, in Guildford borough.
Land and building surveying company with offices in Surrey (Dunsfold Park), London,…
Underground mapping and land surveying company with its registered office in Wormley and…
Accurate levels on the River Thames floodplain at Egham Hythe, Hythe End and The Causeway are why a topographical survey matters in Egham, including any drawings for the safeguarded River Thames Scheme corridor. The survey measures buildings, trees and water edges so that a design, flood model or tree protection plan is based on the site as it is. The local planning authority is Runnymede Borough Council. Those levels also support Policy EE13 flood risk assessments, Policy EE12 watercourse buffers and Policy EE9 tree surveys.
Local planning authority: Runnymede Borough Council

Much of Egham Hythe and The Causeway is low-lying, with subtle changes in level between the River Thames, highway edges and adjoining streets. The safeguarded River Thames Scheme corridor also depends on accurate land take and levels. A survey should pick up river banks, trees and existing drainage, and should be coordinated with any flood risk or BS5837 tree work.
Runnymede Borough Council will expect drawings that rely on site levels, including flood risk assessments under Policy EE13, to be based on a competent topographical survey. Policy EE12 also protects blue infrastructure along the River Thames, which needs an accurate bank and site boundary. There is no separate local-plan policy titled for topographical surveys, so confirm drawing standards and any validation requirements with the council before submitting.
Local plan: Runnymede 2030 Local Plan (Adopted on 16 July 2020 and still in force. The council adopted a timetable for a new Local Plan on 25 February 2026, with issues and options scoping consultation from 7 September to 12 October 2026; the new plan had not been adopted as of 13 November 2026.)
EE10: Thames Basin Heaths Special Protection Area
No additional residential development within 400 m of the SPA. Non-residential development within 400 m may require Appropriate Assessment. All additional residential development beyond 400 m but within 5 km must provide adequate avoidance measures, generally SANG and SAMM.
EE12: Blue Infrastructure
Protects and enhances rivers and other waterbodies, including buffers, deculverting and fish passage, and requires SuDS designs to take account of wildlife.
EE1: Townscape and Landscape Quality
Requires development to respect and enhance townscape and landscape quality, including the setting of the River Thames and historic landscapes around Egham.
General guidance for topographical survey, not formal advice for your site.
Runnymede Borough Council. From 1 April 2027 planning powers pass to the new West Surrey unitary council under local government reorganisation.
Egham Hythe, Hythe End and The Causeway sit on the undefended floodplain of the River Thames. Policy EE13 also safeguards land for the River Thames Scheme. Small differences in ground and bank level affect flood routes and channel design.
Yes. A tree survey under Policy EE9 and a flood risk assessment under Policy EE13 both rely on accurate positions and levels, including river banks and canopy spreads.