Featured partner
Recommended for Ilford

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Ilford

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Land and building surveying company with offices in Surrey (Dunsfold Park), London,…
Measured building and land surveyors trading from 111 Gosterwood Street in Deptford, in…
Land and measured-building survey practice with a London office in Crystal Palace.
Land survey and site engineering practice based in Chesham, north-west of the M25.
A topographical survey in Ilford Town Centre records levels, boundaries and features along Ilford High Road and around Redbridge Town Hall, and it underpins tree, drainage and design work. The local planning authority is the London Borough of Redbridge. Policy LP38 of the Redbridge Local Plan 2015–2030, adopted on 15 March 2018, protects trees, which the April 2024 validation list expects to be surveyed to BS5837. Policy LP21 also relies on site levels when flood risk and drainage are assessed, including near the River Roding. Policy G7 of the London Plan, published on 2 March 2021, also forms part of the development plan.
Local planning authority: London Borough of Redbridge

A survey in Ilford Town Centre should pick up trees, levels and any land falling towards the River Roding, especially where surface water flood risk is a concern around Ilford High Road, Redbridge Town Hall and Valentines Park. Barkingside and Gants Hill are areas covered on these pages.
The London Borough of Redbridge uses accurate site information when it assesses trees under Policy LP38 and flood risk under Policy LP21 of the Redbridge Local Plan 2015–2030, adopted on 15 March 2018, together with the London Plan published on 2 March 2021. Confirm the current local validation requirements with the council before submitting.
Local plan: Redbridge Local Plan 2015–2030 (The Redbridge Local Plan 2015–2030 was adopted on 15 March 2018 and remains the adopted local plan. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
LP38: Protecting Trees and Enhancing the Landscape
Policy LP38 of the Redbridge Local Plan 2015–2030, adopted on 15 March 2018, protects trees and seeks to enhance the landscape.
LP39: Nature Conservation and Biodiversity
Policy LP39 protects nature conservation and biodiversity. It does not set a biodiversity net gain percentage above the national minimum.
LP37: Green Infrastructure and Blue Ribbon Network
Policy LP37 addresses green infrastructure and the Blue Ribbon Network, including the River Roding.
LP21: Water and Flooding
Policy LP21 addresses water and flooding, including flood risk assessment and sustainable drainage.
General guidance for topographical survey, not formal advice for your site.
The London Borough of Redbridge. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
An accurate survey of levels, trees and boundaries supports the BS5837 tree survey required by the April 2024 validation list and the flood risk and drainage work required by Policy LP21.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policy G7 and Policies SI12 and SI13 are the London Plan policies most often read alongside a site survey.
No other published town guides for this survey in the council area yet.