Featured partner
Recommended for Kingston upon Thames

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Kingston upon Thames

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Land and building surveying company with offices in Surrey (Dunsfold Park), London,…
Surveying and construction consultancy with its head office at Merrow Business Park in…
Land surveying company based in Shere, in Guildford borough.
Measured survey company founded in Cranleigh and now based in Camberley, with a second…
Threshold levels on the River Thames and River Hogsmill frontages, and street levels in Kingston Town Centre and the Thames Policy Area, are what a topographical survey in Kingston upon Thames has to get right. The measured plan is the base drawing for a Policy DM 4 flood risk assessment and for Policy DM 10 tree protection. The local planning authority is the Royal Borough of Kingston upon Thames. Buildings, walls and water edges should be shown as they are, because even small changes in level can alter both flood modelling and root protection areas.
Local planning authority: Royal Borough of Kingston upon Thames

Kingston Town Centre sits at the confluence of the River Thames and the River Hogsmill, with changing bank, towpath and threshold levels in the Thames Policy Area and along the Hogsmill Valley. A survey should be coordinated with any flood risk or tree work, including around Bonesgate Stream where that watercourse is relevant to the site.
The Royal Borough of Kingston upon Thames will expect drawings that rely on site levels, including flood risk assessments under Policy DM 4 and tree surveys under Policy DM 10, to be based on a competent topographical survey, alongside Policy SI 12 of the London Plan, published on 2 March 2021. There is no separate local-plan policy titled for topographical surveys, so confirm drawing standards and any validation requirements with the council before submitting.
Local plan: Royal Borough of Kingston upon Thames Core Strategy (adopted 17 April 2012) and The London Plan 2021 (published 2 March 2021) (The Core Strategy was adopted on 17 April 2012 and remains the adopted borough development plan as of 13 November 2026, together with the Kingston Town Centre Area Action Plan (K+20, 2008) until it is replaced. The London Plan 2021, published on 2 March 2021, also forms part of the development plan. A new Kingston Local Plan 2028-2043 reached Regulation 19 consultation in 2026 and is not adopted. The draft London Plan 2026 is in consultation and is not adopted. There is no 2027 successor council. The Royal Borough of Kingston upon Thames is the local planning authority and the Lead Local Flood Authority.)
SI 12: Flood risk management
Requires development proposals to minimise and mitigate flood risk and address residual risk, including, where possible, making space for water and setting development back from watercourses. In London the boroughs are the Lead Local Flood Authorities.
DM 10: Design Requirements for New Developments
Requires new development to apply good design, including a tree test: trees that are important to character, or are protected by a Tree Preservation Order, must not be adversely affected. Where trees are lost, the council will normally require two replacement specimens for each tree lost, and will refuse permission if the leafy character of the area would be harmed without commensurate replacement.
DM 6: Biodiversity
Requires development to protect and promote biodiversity. An ecological assessment is required for major development or where there is significant habitat. Proposals should not result in a net loss of biodiversity and, where appropriate, should include new or improved habitats. The policy does not set a percentage. Statutory 10 per cent biodiversity net gain under the Environment Act 2021 applies to qualifying development.
G6: Biodiversity and access to nature
London Plan Policy G6 requires development proposals to manage impacts on biodiversity and aim to secure net biodiversity gain. Sites of Importance for Nature Conservation should be protected. The policy does not set a percentage.
G7: Trees and woodlands
Requires existing trees of value to be retained wherever possible. Where trees are removed, there should be adequate replacement based on the value of the benefits lost, determined by a method such as i-Tree or CAVAT. Additional planting, particularly of large-canopied species, should generally be included.
DM 4: Water Management and Flood Risk
Requires a flood risk assessment for all development in Flood Zones 2 and 3 and for major development of 1 hectare or more in Flood Zone 1, considering all sources of flooding, climate change and the Strategic Flood Risk Assessment. Sustainable drainage should be used unless it is not feasible, following the Mayor's drainage hierarchy, and sewer capacity should be considered. The borough is the Lead Local Flood Authority under the Flood and Water Management Act 2010.
General guidance for topographical survey, not formal advice for your site.
The Royal Borough of Kingston upon Thames. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
Kingston Town Centre sits on the River Thames at its confluence with the River Hogsmill, inside the Thames Policy Area. Bank, kerb and threshold levels affect both flood risk assessments and riverside design.
Yes. A tree survey under Policy DM 10 and a flood risk assessment under Policy DM 4 both rely on accurate positions and levels, including water edges and canopy spreads.
No other published town guides for this survey in the council area yet.