Featured partner
Recommended for Stratford

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Stratford

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Measured building and land surveyors trading from 111 Gosterwood Street in Deptford, in…
Land and building surveying company with offices in Surrey (Dunsfold Park), London,…
Land and measured-building survey practice with a London office in Crystal Palace.
Land survey and site engineering practice based in Chesham, north-west of the M25.
A topographical survey in Stratford Town Centre records levels, boundaries and features around Queen Elizabeth Olympic Park and the streets that serve them, and it underpins tree, drainage and design work. The local planning authority is the London Borough of Newham. Policy GWS4 of Our Newham Local Plan 2026–2042, adopted on 2 November 2026, requires an arboricultural report where trees are on or next to the site, which is usually plotted on an accurate survey. Policy CE7 and Policy CE8 also rely on site levels when flood risk and sustainable drainage are assessed. Policy G7 of the London Plan, published on 2 March 2021, also forms part of the development plan.
Local planning authority: London Borough of Newham

A survey in Stratford Town Centre should pick up trees, levels and any water features linked to the River Lea, the Bow Back Rivers and Queen Elizabeth Olympic Park, especially where surface water flood risk is a concern. Forest Gate, Green Street and Canning Town are areas covered on these pages.
The London Borough of Newham uses accurate site information when it assesses trees under Policy GWS4 and flood risk and drainage under Policies CE7 and CE8 of Our Newham Local Plan 2026–2042, adopted on 2 November 2026, together with the London Plan published on 2 March 2021. Confirm the current local validation requirements with the council before submitting.
Local plan: Our Newham Local Plan 2026–2042 (Our Newham Local Plan 2026–2042 was adopted on 2 November 2026 and is the adopted local plan. The previous Newham Local Plan 2018 and, within Newham, the LLDC Local Plan 2020 have been formally withdrawn. Stratford is now fully under the London Borough of Newham. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
CE7: Managing flood risk
Policy CE7 requires all new development to avoid placing people or essential infrastructure at increased flood risk for the lifetime of the development, to assess risk from all sources using the Strategic Flood Risk Assessment, to apply the sequential test and, where necessary, the exception test, and to provide a flood risk assessment when required by national requirements, the SFRA and Environment Agency advice. Development should be set back a minimum of 16 metres from the landward side of tidal flood defences and eight metres from fluvial river defences. The Thames, the River Roding and the River Lea are the borough’s principal watercourses; the Thames and the Royal Docks neighbourhoods lie to the south of Stratford Town Centre, while the River Lea and the Bow Back Rivers adjoin Queen Elizabeth Olympic Park.
CE8: Sustainable drainage
Policy CE8 requires sustainable drainage in new development, following the London Plan drainage hierarchy, so that surface water is managed on site and flood risk is not increased elsewhere.
GWS4: Trees
Policy GWS4 of Our Newham Local Plan 2026–2042, adopted on 2 November 2026, requires development to protect trees and deliver a network of improved tree stock and canopy cover. It seeks a net increase in trees on all new development sites and requires an arboricultural report at the planning application stage for all new development with trees on or adjacent to the site. Loss is only supported in exceptional circumstances with adequate on-site replacement or a mitigating contribution. Major development that proposes to remove a tree must submit a CAVAT study.
GWS3: Biodiversity, urban greening, and access to nature
Policy GWS3 requires development to deliver a biodiversity net gain of at least 10 per cent, which restates the statutory minimum and does not set a higher local percentage. Major development, and all development close to a SINC or likely to affect protected or priority species, must submit an ecological assessment. The policy also applies the London Plan urban greening factor and Epping Forest Special Area of Conservation mitigation for net additional homes within 6.2 km of the SAC.
General guidance for topographical survey, not formal advice for your site.
The London Borough of Newham. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
An accurate survey of levels, trees and boundaries supports the arboricultural report required by Policy GWS4 and the flood risk and drainage work required by Policies CE7 and CE8.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policy G7 and Policies SI12 and SI13 are the London Plan policies most often read alongside a site survey.