Featured partner
Recommended for Elephant and Castle

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Elephant and Castle

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Independent arboricultural consultancy based in Coulsdon.
London arboricultural consultancy with a trading office at Rathbone Place, Fitzrovia.
Independent arboricultural consultancy based in New Malden, immediately adjoining the…
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Street trees and garden trees around Elephant and Castle Town Centre and in the Walworth Road Conservation Area are a frequent reason for a tree survey in Elephant and Castle. A planning application should record trees on and next to the site, including those in a conservation area or covered by a tree preservation order, and should show how they will be protected during the works. London Borough of Southwark is the local planning authority, and the London Plan, published on 2 March 2021, also forms part of the development plan. Applications around Elliot's Row Conservation Area often need the same tree constraints plan as elsewhere in the borough, but the character of Elephant and Castle is not interchangeable with the parent town. Confirm the current validation requirements with the council before submitting.
Local planning authority: London Borough of Southwark

Elephant and Castle, officially Elephant and Castle/ Walworth Road in Table A1.1, is the interchange major centre around Elephant and Castle Town Centre, with Walworth Road Conservation Area to the south and Elliot's Row Conservation Area to the west. That peninsula and Walworth setting is not Rye Lane or Peckham Rye, and it is not the docks at Canada Water. Tree surveys for applications in Elephant and Castle should record street trees and garden trees around Elephant and Castle Town Centre and Walworth Road Conservation Area.
In Elephant and Castle, including around Elephant and Castle Town Centre and Walworth Road Conservation Area, the London Borough of Southwark assesses tree issues under Policy P61 of the Southwark Plan, adopted on 23 February 2022, together with Policy G7 of the London Plan, published on 2 March 2021. The Southwark Plan 2022 Validation Requirements and Relevant Planning Documents ask for a tree survey or arboricultural impacts assessment where Policy P61 applies. Confirm the current local validation requirements with the council before submitting. Confirm the current validation requirements with the council before submitting.
Local plan: Southwark Plan 2022 (The Southwark Plan 2019–2036 was adopted on 23 February 2022 and remains the adopted local plan. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
P60: Biodiversity
Policy P60 requires development to contribute to net gains in biodiversity by enhancing and protecting SINCs, Local Nature Reserves, protected species and priority habitats. It does not set a percentage above the national minimum.
P61: Trees
Policy P61 of the Southwark Plan, adopted on 23 February 2022, requires significant existing trees to be retained and protected, including trees of high amenity value, trees in conservation areas, and veteran, ancient and notable trees, and requires retained trees to be protected during construction in line with BS5837.
P68: Reducing flood risk
Policy P68 requires development not to increase flood risk on or off site, sets finished floor levels in areas at risk of flooding, and requires major development to reduce surface water run-off to greenfield rates through sustainable drainage. Tidal flood risk from the Thames is identified in the north of the borough, not in Peckham Town Centre.
General guidance for tree survey (bs5837), not formal advice for your site.
London Borough of Southwark. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
When a planning application in Elephant and Castle could affect trees, habitats, heritage, flood risk or existing buildings around Elephant and Castle Town Centre and Walworth Road Conservation Area. Confirm the current validation requirements with the council.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan in Elephant and Castle alongside the London Borough of Southwark local plan.