Featured partner
Recommended for Hounslow

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Hounslow

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Independent arboricultural consultancy based in Ruislip and at Carpenders Park, near…
Independent arboricultural consultancy based in Radlett, just north of the London…
London arboricultural consultancy with a trading office at Rathbone Place, Fitzrovia.
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Trees on Hounslow Heath and in Hounslow Town Centre, including street trees along Hounslow High Street, are a frequent reason for a tree survey in Hounslow. A planning application should record trees on and next to the site, usually to BS5837, so a layout can be designed around them. The local planning authority is the London Borough of Hounslow. Policy GB7 of the Local Plan, adopted on 15 September 2015, encourages landscaping and tree planting and the protection of existing trees through Tree Preservation Orders. Policy G7 of the London Plan, published on 2 March 2021, which also forms part of the development plan, requires trees of value to be retained where possible.
Local planning authority: London Borough of Hounslow

Street trees on Hounslow High Street and in Treaty Gardens, parkland trees in Lampton Park, Inwood Park and Beaversfield Park, and tree cover on Hounslow Heath contribute to local character. A tree survey should be coordinated with any ecological work close to the heath and the River Crane.
The London Borough of Hounslow assesses tree and landscape issues under Policy GB7 of the Local Plan, adopted on 15 September 2015, together with Policy G7 of the London Plan, published on 2 March 2021, which also forms part of the development plan. Policy GB7 protects existing trees, including through Tree Preservation Orders, and expects landscaping and tree planting as part of greening the borough. Confirm the current local validation requirements with the council before submitting.
Local plan: Hounslow Local Plan (adopted 15 September 2015) and The London Plan 2021 (published 2 March 2021) (The Hounslow Local Plan was adopted on 15 September 2015 and remains the adopted borough development plan as of 13 November 2026, together with the London Plan 2021, published on 2 March 2021. The draft London Plan 2026 is in consultation and is not adopted. There is no 2027 successor council. The London Borough of Hounslow is the local planning authority and the Lead Local Flood Authority.)
EQ3: Flood risk and surface water management
Requires development proposals to prepare flood risk assessments consistent with Environment Agency and Strategic Flood Risk Assessment requirements, to apply the sequential approach within site boundaries, to incorporate necessary flood resistance and resilience measures, and to incorporate sustainable urban drainage systems and avoid non-permeable hard standings, with the aim of achieving greenfield runoff rates. The policy also uses the sequential and exception tests to avoid inappropriate development in flood risk areas, and promotes opening up river corridors and buffer zones to watercourses.
G6: Biodiversity and access to nature
London Plan Policy G6 requires development proposals to manage impacts on biodiversity and aim to secure net biodiversity gain. Sites of Importance for Nature Conservation should be protected. The policy does not set a percentage.
G7: Trees and woodlands
Requires existing trees of value to be retained wherever possible. Where trees are removed, there should be adequate replacement based on the value of the benefits lost, determined by a method such as i-Tree or CAVAT. Additional planting, particularly of large-canopied species, should generally be included.
GB4: The green infrastructure network
Requires development proposals to make a positive contribution to the green infrastructure network and to incorporate on-site green infrastructure that integrates into the wider network, which may include green roofs, sustainable drainage, trees and pedestrian access routes. Proposals must demonstrate that there will be no significant adverse impact on the borough's green infrastructure. The supporting text identifies the River Crane, the Duke of Northumberland's River and the Crane Corridor as green links.
GB7: Biodiversity
Requires development to be permitted only where significant adverse impact on biodiversity is avoided, mitigated, or as a last resort compensated. It protects designated international, national and local nature conservation areas, promotes qualitative enhancement including access, connectivity and new habitat, and encourages greening through landscaping and tree planting, including protection of existing trees through Tree Preservation Orders. Development proposals are expected to contribute to greening, including green roofs and walls, landscaping, tree planting and other measures such as bat and bird boxes, through ecological plans and strategies where major developments are proposed, thereby resulting in a gain for biodiversity.
SI 12: Flood risk management
Requires development proposals to minimise and mitigate flood risk and address residual risk, including, where possible, making space for water and setting development back from watercourses. In London the boroughs are the Lead Local Flood Authorities.
General guidance for tree survey (bs5837), not formal advice for your site.
London Borough of Hounslow. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
Policy GB7 protects existing trees, including those covered by a TPO, and expects landscaping and tree planting. A BS5837 survey is the usual way to record trees on and next to a site in Hounslow Town Centre or on the edge of Hounslow Heath. Confirm the current validation checklist with the council.
Yes. Policy G7 of the London Plan forms part of the development plan and requires trees of value to be retained where possible, with adequate replacement if they are removed.