Featured partner
Recommended for Lewisham

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Lewisham

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Independent arboricultural consultancy based in Coulsdon.
London arboricultural consultancy with a trading office at Rathbone Place, Fitzrovia.
Independent arboricultural consultancy based in New Malden, immediately adjoining the…
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Street trees in Lewisham Town Centre and planting around Lewisham Gateway are a frequent reason for a tree survey in Lewisham. A planning application should record trees on and next to the site, usually to BS5837, so a layout can be designed around them. The local planning authority is the London Borough of Lewisham. Policy GR5 of the Lewisham Local Plan, adopted on 16 July 2025, deals with urban greening and trees. The council’s published major-application validation checklist asks for a tree survey, constraints plan, arboricultural implications assessment and method statement, including a tree protection plan, where trees on or next to the site could be affected. Policy G7 of the London Plan, published on 2 March 2021, which also forms part of the development plan, requires trees of value to be retained where possible.
Local planning authority: London Borough of Lewisham

Tree cover in Lewisham Town Centre and around Lewisham Gateway is part of local character. A tree survey should be coordinated with any flood or ecological work close to the River Ravensbourne and the River Quaggy, which meet at the Gateway, and with levels work where surface water flood risk is a concern. Catford, Deptford, Blackheath and Forest Hill are areas covered on these pages.
The London Borough of Lewisham assesses tree issues under Policy GR5 of the Lewisham Local Plan, adopted on 16 July 2025, together with Policy G7 of the London Plan, published on 2 March 2021. The council’s published validation checklists, issued as the October 2022 set, still ask for BS5837 tree survey work where trees could be affected. A draft replacement list was consulted in 2026; confirm the current local validation requirements with the council before submitting.
Local plan: Lewisham Local Plan 2020–2040 (The Lewisham Local Plan 2020–2040 was adopted on 16 July 2025 and replaced the 2011 Core Strategy and the 2013–14 site allocations, development management and town centre plans. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
SD8: Sustainable drainage
Policy SD8 requires sustainable drainage in new development.
GR3: Biodiversity and access to nature
Policy GR3 requires development to protect and enhance biodiversity and to secure biodiversity net gain. The supporting text treats the mandatory benchmark as a minimum 10 per cent increase in habitat value, which is the statutory minimum rather than a higher local standard.
GR5: Urban greening and trees
Policy GR5 of the Lewisham Local Plan, adopted on 16 July 2025, deals with urban greening and trees, including the retention and protection of trees of value and urban greening in new development.
SD7: Minimising and managing flood risk
Policy SD7 requires flood risk from all sources to be minimised and managed, including at the confluence of the River Ravensbourne and the River Quaggy in Lewisham Town Centre.
General guidance for tree survey (bs5837), not formal advice for your site.
The London Borough of Lewisham. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
The council’s published validation checklists ask for BS5837 tree survey work where trees on or next to the site could be affected. Policy GR5 of the Local Plan adopted on 16 July 2025 also deals with urban greening and trees. Confirm the current list with the council, as a replacement list was consulted in 2026.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policy G7 requires trees of value to be retained where possible, with adequate replacement if they are removed.