Featured partner
Recommended for Victoria

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Victoria

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
London arboricultural consultancy with a trading office at Rathbone Place, Fitzrovia.
Arboricultural and ecological consultancy trading as Tim Moya Associates from 2 The…
Independent arboricultural consultancy based in Radlett, just north of the London…
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Street trees along Victoria Street, planting around Westminster Cathedral, and trees toward the River Thames embankment give this CAZ cluster much of its civic character. Westminster City Council will protect trees of amenity, ecological and historic value and those which contribute to the townscape, and encourages new tree planting to optimise canopy cover. A BS 5837 tree survey shows the council what is being kept, how construction on tight plots along Victoria Street will stay outside root protection areas, and how replacement or additional planting will make up any loss. Surface water flood risk is another reason to show trees and soft landscape on an accurate plan, because Policy 34 also treats trees as part of the city's green infrastructure.
Local planning authority: Westminster City Council

Tree cover along Victoria Street, around Westminster Cathedral and toward the River Thames is part of the area's character. Surface water flood risk should be considered alongside any tree and landscape scheme.
Westminster City Council assesses tree and landscape issues under Policy 34 of the City Plan 2019–2040, adopted on 21 April 2021, read with the London Plan tree and urban greening policies. Confirm the current local validation requirements with the council before submitting.
Local plan: City Plan 2019–2040 (Westminster's City Plan 2019–2040 was adopted on 21 April 2021 and is the adopted local plan. A later partial review is not treated as adopted. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
34: Green infrastructure
Policy 34 of the City Plan 2019–2040, adopted on 21 April 2021, protects and enhances Westminster's green infrastructure. Developments will, wherever possible, contribute to the greening of the city by incorporating trees, green walls, green roofs, rain gardens and other green features. Sites of Importance for Natural Conservation, priority habitats and other ecological features outside the SINC network will be protected. Developments should achieve biodiversity net gain, wherever feasible and appropriate, and should maximise opportunities to enhance existing habitats and create new habitats for priority species. The policy does not set a percentage above the statutory 10 per cent minimum. Trees of amenity, ecological and historic value, and those which contribute to the character and appearance of the townscape, will be protected. The planting of trees to optimise the city's canopy cover will be encouraged in new developments. Supporting text says the loss of such trees should be prevented, and that proposals for new trees should have regard to the Trees and the Public Realm SPD.
35: Flood risk
Policy 35 requires all developments to be safe for their lifetime from the risk of flooding, complying with the council's Strategic Flood Risk Assessment, Surface Water Management Plan, Local Flood Risk Management Strategy and the Mayor's Regional Flood Risk Appraisal. A site-specific flood risk assessment must be submitted for developments of 1 hectare or greater, all developments in Flood Zones 2 and 3, and all developments within a Surface Water Flood Risk Hotspot. Highly Vulnerable Uses will not be allowed in Flood Zone 3. Within the Rapid Inundation Zone, basement dwellings and basement extensions to existing dwellings will not be acceptable. An undeveloped buffer zone of 16 metres should be maintained around flood defence structures wherever possible. New development must incorporate Sustainable Drainage Systems, should aim to achieve greenfield run-off rates, and should demonstrate how all opportunities to minimise site run-off have been taken.
General guidance for tree survey (bs5837), not formal advice for your site.
The Westminster City Council. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
A tree survey is expected where trees of amenity, ecological or historic value could be affected, including along Victoria Street, around Westminster Cathedral and toward the River Thames. Confirm the current local validation requirements with the council before submitting.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policy G7 on trees and woodlands is the London Plan policy most often read alongside a tree survey.
No other published town guides for this survey in the council area yet.