Tree surveys in Wembley for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Brent rules explained

Recommended For Wembley

  1. Tree Sense Arboricultural Consultants

    Independent arboricultural consultancy based in Ruislip and at Carpenders Park, near…

  2. Simon Pryce Arboriculture

    Independent arboricultural consultancy based in Radlett, just north of the London…

  3. Landmark Trees

    London arboricultural consultancy with a trading office at Rathbone Place, Fitzrovia.

  4. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

Get your free quote from Thomson Environmental Consultants

Tell Thomson Environmental Consultants about your site in Wembley. It's free, and there's no obligation. Your request is for Thomson Environmental Consultants only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Trees in Wembley Town Centre, along Olympic Way and around Wembley Stadium are a frequent reason for a tree survey in Wembley. A planning application should record trees on and next to the site, usually to BS5837, so a layout can be designed around them. The local planning authority is the London Borough of Brent. Policy BGI2 of the Local Plan 2019-2041, adopted on 24 February 2022, requires a BS5837 or equivalent tree survey where existing trees on or adjoining the site could be affected, and seeks equivalent canopy cover if trees are removed on major sites. Policy G7 of the London Plan, published on 2 March 2021, which also forms part of the development plan, requires trees of value to be retained where possible.

Local planning authority: London Borough of Brent

An aerial view of Wembley Stadium and the surrounding town, looking across the arch and the pitch
Photo: Arne Müseler, CC BY-SA 3.0 de

In Wembley

Street trees on Wembley High Road, planting along Olympic Way and in Wembley Park, and trees at Tokyngton Recreation Ground, Chalkhill Open Space and Barn Hill Open Space contribute to local character. A tree survey should be coordinated with any ecological work close to the River Brent and Brent Reservoir.

Local character
Wembley Town Centre — A Major Centre in the London Plan, with future potential to become a Metropolitan Centre, focused on Wembley High Road. This is the main search centre for the Brent borough page.
Olympic Way — The processional route between Wembley Park station and Wembley Stadium, a planted public realm corridor in the town.
Wembley Park — The district immediately east of Wembley Town Centre, around the stadium and station. It is an area covered by this page, not a separate place.
Wembley High Road — The main street of Wembley Town Centre, where street trees, building lines and levels set the character for tree and topographical surveys.
Landmarks
Wembley Stadium — The national stadium immediately east of Wembley Town Centre, a defining landmark whose surrounding public realm, trees and levels often feature in survey work.
Wembley Arena — The arena next to Wembley Stadium, part of the same landmark cluster east of Wembley Town Centre.
Rivers
River Brent — The main river corridor through Wembley, running south and east of the town centre toward Brent Reservoir and on through the borough.
SSSIs
Brent Reservoir — A Site of Special Scientific Interest north-east of Wembley, also known locally as the Welsh Harp, named in the Local Plan supporting text on green and blue infrastructure.
Other
Barn Hill Open Space — Open space and hillside north of Wembley Park, looking toward Brent Reservoir, part of the green setting of the town.
Grand Union Canal — The Paddington Arm of the canal, running south of Wembley through Alperton, a waterside corridor close enough to be part of the town's wider setting.
Tokyngton Recreation Ground — Parkland on the River Brent south of Wembley Town Centre, part of the river-corridor setting.
Chalkhill Open Space — Open space north of Wembley Park, part of the local green network between the town and Barn Hill Open Space.
Local authority and policy

The London Borough of Brent assesses tree and woodland issues under Policy BGI2 of the Local Plan 2019-2041, adopted on 24 February 2022, together with Policy G7 of the London Plan, published on 2 March 2021, which also forms part of the development plan. Policy BGI2 requires a BS5837 survey where trees on or adjoining the site could be affected, and equivalent canopy cover or a contribution if trees are lost on major development. Confirm the current local validation requirements with the council before submitting.

Local plan: Brent Local Plan 2019-2041 (adopted 24 February 2022) and The London Plan 2021 (published 2 March 2021) (The Brent Local Plan 2019-2041 was adopted by Full Council on 24 February 2022 and remains the adopted borough development plan as of 13 November 2026, together with the London Plan 2021, published on 2 March 2021. The draft London Plan 2026 is in consultation and is not adopted. There is no 2027 successor council. The London Borough of Brent is the local planning authority and the Lead Local Flood Authority.)

  • G7: Trees and woodlands

    Requires existing trees of value to be retained wherever possible. Where trees are removed, there should be adequate replacement based on the value of the benefits lost, determined by a method such as i-Tree or CAVAT. Additional planting, particularly of large-canopied species, should generally be included.

  • SI 12: Flood risk management

    Requires development proposals to minimise and mitigate flood risk and address residual risk, including, where possible, making space for water and setting development back from watercourses. In London the boroughs are the Lead Local Flood Authorities.

  • BGI1: Green and Blue Infrastructure in Brent

    Requires development to achieve a net gain in biodiversity and avoid any detrimental impact on the geodiversity of an area, and to place emphasis on solutions that support biodiversity when meeting the urban greening factor. It also seeks additional public open space, including in Wembley Central ward, and requires development on or near the Capital Ring to protect its character and, where appropriate, contribute to its improvement. The policy does not set a biodiversity net gain percentage.

  • BGI2: Trees and Woodlands

    Requires development with existing trees on or adjoining the site that could be affected to submit a BS5837 or equivalent tree survey. Major development should make provision for the planting and retention of trees on site; where retention is agreed not to be possible, new trees should achieve equivalent canopy cover or a financial contribution should be made for off-site planting of equivalent canopy cover. Minor development that results in the loss of trees should provide appropriate replacements on site. Works to trees should accord with BS3998 or equivalent, and retained or proposed trees should accord with BS5837 recommendations.

  • BSUI3: Managing Flood Risk

    Requires proposals that need a flood risk assessment to demonstrate that the development will be resistant and resilient to all relevant sources of flooding including surface water, to pass the sequential and exception tests as required by national policy, to minimise flood risk on site and not increase it elsewhere, and not to create new basement dwellings in areas of high flood risk. Proposals that fail to make appropriate provision for flood risk mitigation, or which would increase the risk or consequences of flooding, will be refused. Opportunities will be sought from redevelopment in functional floodplain (Flood Zone 3b) to restore natural function and storage capacity.

  • G6: Biodiversity and access to nature

    London Plan Policy G6 requires development proposals to manage impacts on biodiversity and aim to secure net biodiversity gain. Sites of Importance for Nature Conservation should be protected. The policy does not set a percentage.

What you’ll usually need

General guidance for tree survey (bs5837), not formal advice for your site.

Timing and seasons
Can be carried out all year; leaf-on months make some assessments easier.
Standards
BS5837:2012

Questions about tree surveys in Wembley

Who is the local planning authority for a tree survey in Wembley?

London Borough of Brent. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

When is a tree survey likely in Wembley?

Policy BGI2 requires a BS5837 or equivalent survey where existing trees on or adjoining the site could be affected. This is typical in Wembley Town Centre, along Olympic Way and around Wembley Stadium. Confirm the current validation requirements with the council.

Does the London Plan also apply?

Yes. Policy G7 of the London Plan forms part of the development plan and requires trees of value to be retained where possible, with adequate replacement if they are removed.