Bat surveys in Harrow for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Harrow rules explained

Recommended For Harrow

  1. Aven Ecology

    London-based ecological consultancy in Muswell Hill.

  2. Greengage Environmental

    Environmental and ecology consultancy with a London office at Holyrood Street, near…

  3. Eight Versa

    London environmental consultancy based at Marshalsea Road, Southwark, formerly trading…

  4. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

Get your free quote from ROAVR Group

Tell ROAVR Group about your site in Harrow. It's free, and there's no obligation. Your request is for ROAVR Group only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Older buildings and mature trees on Harrow on the Hill, including in the Harrow on the Hill Conservation Area, are typical starting points for a bat survey in Harrow, especially where lighting could affect commuting routes. For planning applications the local planning authority is the London Borough of Harrow. Policy GI3 of the Local Plan 2021-2041, adopted on 24 March 2026, requires all proposals to consider the presence of protected and priority species and to submit up-to-date surveys where appropriate, with mitigation strategies for their continued protection.

Local planning authority: London Borough of Harrow

The High Street in Harrow on the Hill, with historic houses, iron railings and a tree-lined road
Photo: David Howard, CC BY-SA 2.0

In Harrow

Bats may roost in older buildings in Harrow Town Centre and around St Mary's Church, Harrow on the Hill, and forage across Lowlands Recreation Ground, The Grove Open Space, Harrow Recreation Ground and along the Wealdstone Brook. A bat survey should consider lighting and whether a PEA has already flagged features for further work.

Local character
Harrow Town Centre — A Metropolitan Centre focused on the station, St Ann's Road and the shopping streets at the foot of the Hill, the main search centre for this borough page.
Landmarks
Harrow on the Hill — The wooded hill and historic settlement south of Harrow Town Centre, a defining landmark whose trees, slopes and conservation area shape survey work.
St Mary's Church, Harrow on the Hill — The parish church on the crown of Harrow on the Hill, a recognisable landmark in the conservation area.
Conservation areas
Harrow on the Hill Conservation Area — The conservation area protecting the historic hill settlement, named in the Local Plan as a heritage asset whose character should be preserved and enhanced.
Rivers
Wealdstone Brook — The watercourse running through and north of Harrow Town Centre toward Wealdstone, the main fluvial setting for the Metropolitan Centre.
River Pinn — A tributary west of Harrow Town Centre, through Pinner and the western part of the borough, identified as part of the borough's river network.
Green Belt
Metropolitan Green Belt — Covers land on the northern and western edge of the borough, beyond Harrow Town Centre, forming part of the wider landscape setting.
Other
Lowlands Recreation Ground — Open space on the south side of Harrow Town Centre, at the foot of Harrow on the Hill, with trees and changing levels that often feature in survey work.
Harrow Recreation Ground — A park west of Harrow Town Centre, part of the green setting between the centre and residential streets.
The Grove Open Space — Open space on the Hill side of the town, part of the planted setting between Harrow Town Centre and Harrow on the Hill.
Byron Recreation Ground — A park in Wealdstone, north of Harrow Town Centre, on the Wealdstone Brook corridor.
West Harrow Recreation Ground — Open space west of the town centre, part of the local park network between Harrow Town Centre and the River Pinn catchment.
Local authority and policy

The London Borough of Harrow assesses effects on bats as protected species under Policy GI3 of the Local Plan 2021-2041, adopted on 24 March 2026, together with London Plan Policy G6, published on 2 March 2021. Surveys should follow current best practice and, where a licence may be needed, show how roosts will be retained or compensated. Confirm the current local validation requirements with the council before submitting.

Local plan: Harrow Local Plan 2021-2041 (adopted 24 March 2026) and The London Plan 2021 (published 2 March 2021) (The Harrow Local Plan 2021-2041 was adopted on 24 March 2026 and is the adopted borough development plan as of 13 November 2026, together with the London Plan 2021, published on 2 March 2021. It replaces the 2012 and 2013 plan documents. The draft London Plan 2026 is in consultation and is not adopted. There is no 2027 successor council. The London Borough of Harrow is the local planning authority and the Lead Local Flood Authority.)

  • GI3: Biodiversity

    Requires development proposals, unless exempt under the Environment Act 2021, to contain a biodiversity plan including an appropriate net gain metric, a preliminary ecological assessment where appropriate, and an on- and off-site mitigation and management plan. Proposals must follow the mitigation hierarchy and must not result in loss of, or uncompensated harm to, irreplaceable habitats, designated sites or other important features. Unless exempt, major and minor development must be supported by a Biodiversity Net-Gain Plan demonstrating a minimum of 2 biodiversity units per hectare or a minimum net uplift of 10 per cent, whichever is greater, plus at least one wildlife enhancement per residential dwelling. Following the NPPF published on 17 August 2026, the statutory 10 per cent minimum applies except where a higher figure is justified on a specific site allocation.

  • GI4: Urban Greening, Landscaping and Trees

    Requires a design-led approach that maximises local greening, with a presumption in favour of retaining and integrating existing trees, woodlands and hedgerows. Trees identified for retention must be protected during construction, with appropriate root protection areas. Planning permission will be refused where proposals would result in the loss of or harm to trees subject to a TPO, ancient or veteran trees or woodland, or trees categorised as suitable quality and value in a BS5837 survey. Where tree loss is unavoidable, replacement will be required at a rate of at least two new trees for each tree lost, on site where appropriate, or by a contribution for any shortfall. Major development should meet the London Plan Urban Greening Factor scores of 0.4 for predominantly residential and 0.3 for predominantly commercial development unless it is not feasible.

  • CN3: Reducing Flood Risk

    Requires proposals to apply the sequential and exception tests in line with national policy. Where a flood risk assessment is required, it must show that the development will be resistant and resilient to all relevant sources of flooding including surface water, minimise flood risk on site, not increase flood risk elsewhere, reduce flood risk overall where possible, and provide a dry means of escape. For residential development in Flood Zone 3, finished floor levels must be at least 300 mm above the modelled 1 in 100 year plus climate change flood level. Basement development will not be allowed on sites in Flood Zone 3b, and new dwellings or additional habitable accommodation in basements will be refused. Natural flood management methods should be the preferred approach.

  • G6: Biodiversity and access to nature

    London Plan Policy G6 requires development proposals to manage impacts on biodiversity and aim to secure net biodiversity gain. Sites of Importance for Nature Conservation should be protected. The policy does not set a percentage.

  • G7: Trees and woodlands

    Requires existing trees of value to be retained wherever possible. Where trees are removed, there should be adequate replacement based on the value of the benefits lost, determined by a method such as i-Tree or CAVAT. Additional planting, particularly of large-canopied species, should generally be included.

  • SI 12: Flood risk management

    Requires development proposals to minimise and mitigate flood risk and address residual risk, including, where possible, making space for water and setting development back from watercourses. In London the boroughs are the Lead Local Flood Authorities.

What you’ll usually need

General guidance for bat survey, not formal advice for your site.

Timing and seasons
Roost inspections can be done all year; emergence and re-entry surveys are seasonal, typically May to September.
Standards
Bat Conservation Trust Bat Surveys for Professional Ecologists: Good Practice Guidelines

Questions about bat surveys in Harrow

Who is the local planning authority for a bat survey in Harrow?

London Borough of Harrow. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

When is a bat survey likely in Harrow?

Where a building or tree may be used by bats, or where works and lighting could affect commuting routes on Harrow on the Hill, in the Harrow on the Hill Conservation Area or along the Wealdstone Brook. A PEA is often the first step. Confirm the current requirements with the council.

Does the Hill still matter for bats?

Yes. Harrow on the Hill, the Harrow on the Hill Conservation Area and the Wealdstone Brook are likely roosting, commuting and foraging habitats, even where the lower town is densely built.