Featured partner
Recommended for Harrow

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Harrow

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Transport planning and infrastructure consultancy with its main office on North Street…
Transport and civil engineering consultancy with a Surrey office in Godalming and a…
Civil and structural engineering practice with a London office in Lambeth.
Civil and structural engineering consultancy whose London office is in Sutton town centre.
The Wealdstone Brook through Harrow Town Centre, and the River Pinn further west, are the main fluvial setting for a flood risk assessment in Harrow, together with surface-water risk on the slopes of Harrow on the Hill. For applications the local planning authority is the London Borough of Harrow, which is also the Lead Local Flood Authority. Policy CN3 of the Local Plan 2021-2041, adopted on 24 March 2026, requires the sequential and exception tests, and a flood risk assessment that shows resistance and resilience to all relevant sources including surface water.
Local planning authority: London Borough of Harrow

Byron Recreation Ground sits on the Wealdstone Brook corridor toward Wealdstone. Surface-water flow on the slopes of Harrow on the Hill and through Harrow Town Centre also needs to be considered, not only mapped river flood zones. Policy CN3 sets finished floor levels for residential development in Flood Zone 3 at least 300 mm above the modelled 1 in 100 year plus climate change flood level.
The London Borough of Harrow assesses flood risk under Policy CN3 of the Local Plan 2021-2041, adopted on 24 March 2026, together with London Plan Policy SI 12, published on 2 March 2021. The borough is the Lead Local Flood Authority. Policy CN3 also refuses new dwellings in basements and basement development in Flood Zone 3b. Confirm current maps, the SFRA and local validation requirements with the council before submitting.
Local plan: Harrow Local Plan 2021-2041 (adopted 24 March 2026) and The London Plan 2021 (published 2 March 2021) (The Harrow Local Plan 2021-2041 was adopted on 24 March 2026 and is the adopted borough development plan as of 13 November 2026, together with the London Plan 2021, published on 2 March 2021. It replaces the 2012 and 2013 plan documents. The draft London Plan 2026 is in consultation and is not adopted. There is no 2027 successor council. The London Borough of Harrow is the local planning authority and the Lead Local Flood Authority.)
GI3: Biodiversity
Requires development proposals, unless exempt under the Environment Act 2021, to contain a biodiversity plan including an appropriate net gain metric, a preliminary ecological assessment where appropriate, and an on- and off-site mitigation and management plan. Proposals must follow the mitigation hierarchy and must not result in loss of, or uncompensated harm to, irreplaceable habitats, designated sites or other important features. Unless exempt, major and minor development must be supported by a Biodiversity Net-Gain Plan demonstrating a minimum of 2 biodiversity units per hectare or a minimum net uplift of 10 per cent, whichever is greater, plus at least one wildlife enhancement per residential dwelling. Following the NPPF published on 17 August 2026, the statutory 10 per cent minimum applies except where a higher figure is justified on a specific site allocation.
GI4: Urban Greening, Landscaping and Trees
Requires a design-led approach that maximises local greening, with a presumption in favour of retaining and integrating existing trees, woodlands and hedgerows. Trees identified for retention must be protected during construction, with appropriate root protection areas. Planning permission will be refused where proposals would result in the loss of or harm to trees subject to a TPO, ancient or veteran trees or woodland, or trees categorised as suitable quality and value in a BS5837 survey. Where tree loss is unavoidable, replacement will be required at a rate of at least two new trees for each tree lost, on site where appropriate, or by a contribution for any shortfall. Major development should meet the London Plan Urban Greening Factor scores of 0.4 for predominantly residential and 0.3 for predominantly commercial development unless it is not feasible.
CN3: Reducing Flood Risk
Requires proposals to apply the sequential and exception tests in line with national policy. Where a flood risk assessment is required, it must show that the development will be resistant and resilient to all relevant sources of flooding including surface water, minimise flood risk on site, not increase flood risk elsewhere, reduce flood risk overall where possible, and provide a dry means of escape. For residential development in Flood Zone 3, finished floor levels must be at least 300 mm above the modelled 1 in 100 year plus climate change flood level. Basement development will not be allowed on sites in Flood Zone 3b, and new dwellings or additional habitable accommodation in basements will be refused. Natural flood management methods should be the preferred approach.
G6: Biodiversity and access to nature
London Plan Policy G6 requires development proposals to manage impacts on biodiversity and aim to secure net biodiversity gain. Sites of Importance for Nature Conservation should be protected. The policy does not set a percentage.
G7: Trees and woodlands
Requires existing trees of value to be retained wherever possible. Where trees are removed, there should be adequate replacement based on the value of the benefits lost, determined by a method such as i-Tree or CAVAT. Additional planting, particularly of large-canopied species, should generally be included.
SI 12: Flood risk management
Requires development proposals to minimise and mitigate flood risk and address residual risk, including, where possible, making space for water and setting development back from watercourses. In London the boroughs are the Lead Local Flood Authorities.
General guidance for flood risk and drainage assessment, not formal advice for your site.
London Borough of Harrow. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
Policy CN3 requires a flood risk assessment in line with national policy, showing resistance and resilience to all relevant sources including surface water. National policy requires a site-specific assessment in Flood Zones 2 and 3 and for major development of 1 hectare or more in Flood Zone 1. The Wealdstone Brook through Harrow Town Centre and the River Pinn further west are the main fluvial setting. Confirm the current SFRA and validation requirements with the council.
The London Borough of Harrow is the Lead Local Flood Authority.
No other published town guides for this survey in the council area yet.