Flood risk and drainage assessments in Southall for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Ealing rules explained

Recommended For Southall

  1. Motion

    Transport planning and infrastructure consultancy with its main office on North Street…

  2. RGP

    Transport and civil engineering consultancy with a Surrey office in Godalming and a…

  3. JMS Engineers

    Civil and structural engineering practice with a London office in Lambeth.

  4. Scott White and Hookins

    Civil and structural engineering consultancy whose London office is in Sutton town centre.

At a glance

Flood risk in Southall is shaped by Yeading Brook and Grand Union Canal, together with surface-water drainage on and around the site. A flood risk assessment should use the current Environment Agency mapping and the council's strategic flood risk assessment, and should not borrow a neighbouring town's catchment story. London Borough of Ealing is the local planning authority and the Lead Local Flood Authority, and the London Plan, published on 2 March 2021, also forms part of the development plan. Drainage proposals should show how surface water will be managed on site. Confirm the current validation requirements with the council before submitting.

Local planning authority: London Borough of Ealing

Southall Manor House, a Tudor and later brick house with a timber-framed gable, seen across a green under a cloudy sky
Photo: Matt Brown, CC BY 2.0

In Southall

Southall sits in the west of the borough, around The Broadway, The Green and Southall Manor House, with the Grand Union Canal and Norwood Green Conservation Area to the south and the Yeading Brook to the west. That canalside and brook setting is not the River Brent, Ealing Common or Ealing Broadway story used on the Ealing pages. Flood-risk and drainage work should be written for this centre, starting from Yeading Brook and Grand Union Canal.

Local character
The Broadway — The Broadway, South Road and The Green form the commercial heart of Southall Major Centre, as identified in the Southall Town Plan chapter of Ealing's development plan evidence.
Conservation areas
Norwood Green Conservation Area — Norwood Green Conservation Area lies immediately south of Southall town centre and is one of the two conservation areas the Southall Town Plan identifies for the Southall area.
Other
Grand Union Canal — The Grand Union Canal runs along the south-west side of Southall; the Southall Town Plan identifies the canalside stretch as the second of the area's two conservation areas.
Landmarks
Southall Manor House — Southall Manor House, on The Green, is a Grade II* listed Elizabethan house whose setting is a recurring heritage issue in planning applications around The Green.
Rivers
Yeading Brook — Yeading Brook is the watercourse on the west side of Southall and is a distinct catchment from the River Brent through Ealing town centre.
Local authority and policy

In Southall, including around The Broadway and Norwood Green Conservation Area, the London Borough of Ealing assesses flood risk under Policy 5.12 of the Development Management DPD, adopted on 10 December 2013, together with London Plan Policy SI 12, published on 2 March 2021. The borough is the Lead Local Flood Authority. Policy 5.12 also requires an 8 metre buffer along main rivers and 5 metres alongside ordinary watercourses. Confirm current maps, the SFRA and local validation requirements with the council before submitting. Confirm the current validation requirements with the council before submitting.

Local plan: Ealing Development (Core) Strategy 2026 (adopted 3 April 2012), Ealing Development Management DPD (adopted 10 December 2013) and The London Plan 2021 (published 2 March 2021) (The Development (Core) Strategy was adopted on 3 April 2012 and the Development Management DPD on 10 December 2013. Both remain the adopted borough development plan as of 13 November 2026, together with the London Plan 2021, published on 2 March 2021. A new Ealing Local Plan has reached proposed main modifications, including a draft 20 per cent biodiversity net gain figure; it is not adopted and is not used in these drafts. The draft London Plan 2026 is in consultation and is not adopted. There is no 2027 successor council. The London Borough of Ealing is the local planning authority and the Lead Local Flood Authority.)

  • 5.10: Urban Greening

    Ealing's local variation to London Plan urban greening policy requires development proposals to replace existing trees and plantings on the basis of no net loss of amenity. Provision for trees or plantings on site should replace those lost in consequence of the development; the quality and type of amenity offered should be the same or better.

  • 5.11: Green Roofs and Development Site Environs

    Ealing's local variation strongly encourages green roofs on all development where appropriate in design, contextual and conservation terms, and requires green roofs on major development within 100 metres of Green Belt, Metropolitan Open Land, a Green Corridor, Public Open Space, Community Open Space or a Site of Importance for Nature Conservation. Where amenity and biodiversity functions conflict in that buffer, biodiversity should take precedence.

  • 5.12: Flood Risk Management

    Ealing's local variation requires all development, including that on land that is not part of a defined floodplain, to ensure it is not vulnerable to surface water, sewer and groundwater flooding. New development that reduces the capacity of the floodplain or is in any way vulnerable to flooding will not be permitted within an 8 metre buffer along all main rivers and a 5 metre buffer alongside all ordinary watercourses. There is a general presumption against treatments that do not take a sustainable approach to drainage in domestic gardens and open space.

  • 5.4: Protect the Natural Environment – Biodiversity and Geodiversity

    Requires the council to protect and promote the network of nature conservation sites by enhancing their natural value and improving access, particularly in areas of deficiency. Biodiversity will be considered in the management of all green spaces and the network of waterways, and where development is proposed in or adjacent to such spaces. Particular priority is also placed on protecting sites not formally designated, including gardens and private amenity space, and on priority species identified in Biodiversity Action Plans.

  • 7B: Design Amenity

    Requires new development to achieve a high standard of amenity for users and adjacent uses, including high quality architecture, good levels of daylight, sunlight and privacy, coherent site development, a positive visual impact, and legibility and accessibility. External treatments must complement the building and context.

  • G6: Biodiversity and access to nature

    London Plan Policy G6 requires development proposals to manage impacts on biodiversity and aim to secure net biodiversity gain. Sites of Importance for Nature Conservation should be protected. The policy does not set a percentage.

  • G7: Trees and woodlands

    Requires existing trees of value to be retained wherever possible. Where trees are removed, there should be adequate replacement based on the value of the benefits lost, determined by a method such as i-Tree or CAVAT. Additional planting, particularly of large-canopied species, should generally be included.

  • SI 12: Flood risk management

    Requires development proposals to minimise and mitigate flood risk and address residual risk, including, where possible, making space for water and setting development back from watercourses. In London the boroughs are the Lead Local Flood Authorities.

What you’ll usually need

General guidance for flood risk and drainage assessment, not formal advice for your site.

Timing and seasons
Not seasonal.
Standards
National Planning Policy Framework; Planning Practice Guidance: Flood risk and coastal change

Questions about flood risk assessments in Southall

Who is the local planning authority for a flood risk assessment in Southall?

London Borough of Ealing. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

When is a flood risk assessment likely in Southall?

When a planning application in Southall could affect trees, habitats, heritage, flood risk or existing buildings around The Broadway and Norwood Green Conservation Area. Confirm the current validation requirements with the council.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan in Southall alongside the London Borough of Ealing local plan.