Featured partner
Recommended for Lewisham

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Lewisham

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Environmental and ecology consultancy with a London office at Holyrood Street, near…
London environmental consultancy based at Marshalsea Road, Southwark, formerly trading…
Independent ecology consultancy with its head office in Leatherhead, Surrey.
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Buildings in Lewisham Town Centre and trees and watercourse corridors around Lewisham Gateway are a frequent reason for a bat survey in Lewisham. Where a preliminary appraisal finds roosting or commuting potential, further bat surveys may be needed before a decision can be made. The local planning authority is the London Borough of Lewisham. Policy GR3 of the Lewisham Local Plan, adopted on 16 July 2025, requires biodiversity and protected habitats to be protected and enhanced. Policy G6 of the London Plan, published on 2 March 2021, also forms part of the development plan.
Local planning authority: London Borough of Lewisham

The River Ravensbourne and the River Quaggy, meeting at Lewisham Gateway, provide commuting habitat. Older buildings in Lewisham Town Centre can also have bat potential. An appraisal or bat survey should consider lighting effects and be coordinated with any tree survey.
The London Borough of Lewisham assesses bat and other protected-species issues under Policy GR3 of the Lewisham Local Plan, adopted on 16 July 2025, together with Policy G6 of the London Plan, published on 2 March 2021, and the Conservation of Habitats and Species Regulations. Confirm the current local validation requirements with the council before submitting.
Local plan: Lewisham Local Plan 2020–2040 (The Lewisham Local Plan 2020–2040 was adopted on 16 July 2025 and replaced the 2011 Core Strategy and the 2013–14 site allocations, development management and town centre plans. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
SD8: Sustainable drainage
Policy SD8 requires sustainable drainage in new development.
GR3: Biodiversity and access to nature
Policy GR3 requires development to protect and enhance biodiversity and to secure biodiversity net gain. The supporting text treats the mandatory benchmark as a minimum 10 per cent increase in habitat value, which is the statutory minimum rather than a higher local standard.
GR5: Urban greening and trees
Policy GR5 of the Lewisham Local Plan, adopted on 16 July 2025, deals with urban greening and trees, including the retention and protection of trees of value and urban greening in new development.
SD7: Minimising and managing flood risk
Policy SD7 requires flood risk from all sources to be minimised and managed, including at the confluence of the River Ravensbourne and the River Quaggy in Lewisham Town Centre.
General guidance for bat survey, not formal advice for your site.
The London Borough of Lewisham. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
Where a preliminary ecological appraisal finds roosting or commuting potential, including in buildings in Lewisham Town Centre or along the River Ravensbourne and the River Quaggy at Lewisham Gateway, further bat surveys may be required before an application can be determined.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan. The London Plan forms part of the development plan alongside the Lewisham Local Plan adopted on 16 July 2025.