Featured partner
Recommended for Bagshot

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Bagshot

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Multi-disciplinary practice founded in 1985, offering arboriculture, ecology, landscape…
Ecological consultancy owned by Surrey Wildlife Trust, based at the Trust's offices in…
Independent ecological consultancy with a Surrey office near Farnham, plus offices in…
Biodiversity net gain in Bagshot needs to be measured where development could affect habitats in the Bagshot Village Conservation Area or around the Bagshot Church Road Conservation Area. Surrey Heath Borough Council applies the statutory biodiversity net gain duty under the Environment Act 2021, which requires a minimum 10 per cent net gain on qualifying applications, together with the adopted local plan. After the National Planning Policy Framework published on 17 August 2026, qualifying applications are assessed against the statutory 10 per cent minimum except on a justified site allocation. Gardens, heathland edges and ponds around the village can support bats, reptiles and nesting birds, and the Thames Basin Heaths SPA also influences new homes. Confirm the current validation requirements with the council before submitting.
Local planning authority: Surrey Heath Borough Council

Bagshot is in the area of Surrey Heath Borough Council. Bagshot is a distinct A30 village with its own High Street and church core, separate from Camberley's later military and town-centre streets. The Bagshot Village Conservation Area and the Bagshot Church Road Conservation Area are the official features that shape survey work here. Surrey County Council is the Lead Local Flood Authority. From 1 April 2027 planning powers pass to the new West Surrey unitary council under local government reorganisation.
In Bagshot, including around Bagshot Village Conservation Area and Bagshot Church Road Conservation Area, the same adopted local plan policies apply. Surrey Heath Borough Council applies the statutory biodiversity net gain duty under the Environment Act 2021, which requires a minimum 10 per cent gain for qualifying development, and Policies CP14A and CP14B of the Core Strategy adopted on 1 February 2012. The council's Biodiversity Net Gain webpage and the Local Validation List 2025 (updated for net gain in December 2024) require a biodiversity statement, the statutory metric spreadsheet, and baseline and draft proposed habitat plans with an eligible application. A draft habitat management and monitoring plan is required for significant on-site or off-site gains. The emerging Local Plan 2019–2038 included a draft policy seeking at least 20 per cent net gain, but that plan had not been adopted as of 13 November 2026, and these drafts follow the council's published 10 per cent requirement. SPA avoidance under Policy CP14B and the Avoidance Strategy SPD (March 2019) is additional to net gain. Confirm the current list and any later adoption of the new plan with the council before submitting. After the National Planning Policy Framework published on 17 August 2026, qualifying applications are assessed against the statutory 10 per cent minimum except on a justified site allocation. Confirm the current validation requirements with the council before submitting.
Local plan: Core Strategy and Development Management Policies Development Plan Document (2012), extant saved policies of the Local Plan 2000, and the Camberley Town Centre Area Action Plan (Adopted. The Core Strategy and Development Management Policies DPD was adopted on 1 February 2012 and covers the period 2011 to 2028. It remains the statutory development plan, together with saved Local Plan 2000 policies and the Camberley Town Centre Area Action Plan, until replaced.)
CP14A: Biodiversity and Nature Conservation
Seeks to conserve and enhance biodiversity in Surrey Heath. Development that results in harm to or loss of features of interest for biodiversity will not be permitted. Particular regard is had to SPAs and SACs, SSSIs, and local sites including ancient woodland. Outside those areas, new development will where appropriate be required to contribute to the protection, management and enhancement of biodiversity.
CP13: Green Infrastructure
Seeks a network of accessible and integrated green infrastructure. Schemes that enhance existing green infrastructure, increase provision or improve connectivity are encouraged. Development that results in the loss, fragmentation or isolation of green infrastructure will be resisted. Strategic green infrastructure includes European sites and SANGs.
DM9: Design Principles
Among other design tests, development is acceptable where it protects trees and other vegetation worthy of retention and provides high quality hard and soft landscaping where appropriate.
CP14B: European Sites
Development is permitted only where it will not give rise to a likely significant adverse effect on the integrity of the Thames Basin Heaths SPA and/or the Thursley, Ash, Pirbright & Chobham Common SAC. No net new residential development is permitted within 400 m of the SPA. All net new residential development within 5 km must provide or contribute to SANG (at least 8 ha per 1,000 new occupants) and contribute to SAMM, in accordance with the adopted Avoidance Strategy. Developments of 10 or more net new dwellings are only permitted within identified SANG catchment areas.
DM10: Development and Flood Risk
Takes a sequential approach to flood risk. Development in Flood Zones 2 and 3, on sites of 1 ha or greater in Zone 1, and on sites at medium or high risk from other sources of flooding identified in the SFRA, will not be supported unless the sequential and exception tests are passed where relevant, a site-specific flood risk assessment shows the proposal would reduce risk or at least be risk-neutral, and any identified risks can be reduced to acceptable levels through design and mitigation. Development is expected to reduce the volume and rate of surface water run-off through appropriately designed SuDS.
General guidance for biodiversity net gain (bng), not formal advice for your site.
Surrey Heath Borough Council. From 1 April 2027 planning powers pass to the new West Surrey unitary council under local government reorganisation. Surrey County Council is the Lead Local Flood Authority.
Surrey Heath Borough Council applies the statutory 10 per cent minimum on qualifying applications, together with the adopted local plan. After the National Planning Policy Framework published on 17 August 2026, qualifying applications are assessed against the statutory 10 per cent minimum except on a justified site allocation.
They can form part of the baseline, and the metric should record the habitats that are actually on the site. Confirm the current validation requirements with the council.