Featured partner
Recommended for Bromley

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Bromley

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Environmental and ecology consultancy with a London office at Holyrood Street, near…
London environmental consultancy based at Marshalsea Road, Southwark, formerly trading…
Independent ecology consultancy with its head office in Leatherhead, Surrey.
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Church House Gardens and the River Ravensbourne form an important part of the setting for a biodiversity net gain assessment in Bromley. The assessment uses the statutory metric to show how a proposal will secure a measurable gain. The local planning authority is the London Borough of Bromley. Policy 79 of the Bromley Local Plan, adopted on 16 January 2019, requires the Council to enhance biodiversity and assist ecological restoration. It does not set a percentage above the national minimum. After the National Planning Policy Framework published on 17 August 2026, qualifying applications are assessed against the statutory 10 per cent minimum except on a justified site allocation. Policy G6 of the London Plan, published on 2 March 2021, also forms part of the development plan.
Local planning authority: London Borough of Bromley

A net gain assessment in Bromley Town Centre should be read alongside any appraisal of Church House Gardens, Market Square, Bromley North and the River Ravensbourne. The Validation Guidance of January 2025 asks for a biodiversity net gain statement or plan demonstrating a minimum 10 per cent gain unless the development is exempt. Orpington and the wider Green Belt in the south of the borough are areas covered on these pages, not a second town in this batch.
The London Borough of Bromley assesses biodiversity net gain under Policy 79 of the Bromley Local Plan, adopted on 16 January 2019, together with the Environment Act 2021 and Policy G6 of the London Plan, published on 2 March 2021. Policy 79 does not set a local percentage above 10 per cent, so the statutory minimum applies except on a justified site allocation. The Validation Guidance of January 2025 requires a biodiversity net gain statement or plan demonstrating a minimum 10 per cent gain unless exempt. Confirm the current local validation requirements with the council before submitting.
Local plan: Bromley Local Plan (The Bromley Local Plan was adopted on 16 January 2019 and remains the adopted local plan. A review is under way but is not treated as adopted policy. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
Policy 73: Development and Trees
Policy 73 of the Bromley Local Plan, adopted on 16 January 2019, seeks the retention of healthy trees of amenity value and, where development may affect important trees, requires a tree survey and arboricultural implications assessment in accordance with BS5837.
Policy 72: Protected Species
Policy 72 resists development that would have an adverse effect on protected species unless mitigating measures can be secured.
Policy 115: Reducing Flood Risk
Policy 115 requires a flood risk assessment in Flood Zones 2 and 3, in surface water flood risk hotspots, and for major development across the borough, and applies the sequential and exception tests.
Policy 116: Sustainable Urban Drainage Systems
Policy 116 requires developments to incorporate sustainable drainage and requires a site-specific flood risk assessment in Flood Zones 2, 3a and 3b and in Flood Zone 1 surface water hotspots.
Policy 79: Biodiversity and Access to Nature
Policy 79 requires the Council to enhance biodiversity across the borough and assist ecological restoration. It does not set a biodiversity net gain percentage above the national minimum.
General guidance for biodiversity net gain (bng), not formal advice for your site.
The London Borough of Bromley. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
No sourced higher adopted standard applies. Policy 79 requires biodiversity to be enhanced. After the National Planning Policy Framework published on 17 August 2026, qualifying applications are assessed against the statutory 10 per cent minimum except on a justified site allocation.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policy G6 deals with biodiversity alongside Policy 79.