Featured partner
Recommended for Croydon

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Croydon

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Environmental and ecology consultancy with a London office at Holyrood Street, near…
London environmental consultancy based at Marshalsea Road, Southwark, formerly trading…
Independent ecology consultancy with its head office in Leatherhead, Surrey.
Environmental consultancy founded in 2004, with its head office on the Surrey Research…
Wandle Park, the River Wandle and open space around Park Hill form an important part of the setting for a biodiversity net gain assessment in Croydon. The assessment uses the statutory metric to show how a proposal will secure a measurable gain. The local planning authority is the London Borough of Croydon. Policy DM27 of the Croydon Local Plan, adopted on 27 February 2018, requires development to enhance biodiversity and to have no adverse impact on designated sites or protected species. It does not set a percentage above the national minimum. After the National Planning Policy Framework published on 17 August 2026, qualifying applications are assessed against the statutory 10 per cent minimum except on a justified site allocation. Policy G6 of the London Plan, published on 2 March 2021, also forms part of the development plan.
Local planning authority: London Borough of Croydon

A net gain assessment in Croydon Town Centre or the Croydon Opportunity Area should be read alongside any appraisal of Wandle Park, the River Wandle, Park Hill and Lloyd Park. Policy SP7 supports the Green Grid and the Wandle Valley Area Framework. The River Wandle rises around Wandle Park, to the west of North End, rather than running through the main shopping streets.
The London Borough of Croydon assesses biodiversity net gain under Policy DM27 of the Croydon Local Plan, adopted on 27 February 2018, together with the Environment Act 2021 and Policy G6 of the London Plan, published on 2 March 2021. Policy DM27 does not set a local percentage above 10 per cent, so the statutory minimum applies except on a justified site allocation. The Local Validation List of May 2026 requires applications to explain whether they are exempt and, if not, how biodiversity net gain will be delivered. Confirm the current local validation requirements with the council before submitting.
Local plan: Croydon Local Plan 2018 (The Croydon Local Plan 2018 was adopted on 27 February 2018 and remains the adopted local plan. A later review has been published in draft, including a 2024 revised text, but that review is not treated as adopted policy. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
DM28: Trees
Policy DM28 of the Croydon Local Plan, adopted on 27 February 2018, requires the Council to protect and enhance the borough’s woodlands, trees and hedgerows.
DM27: Protecting and enhancing our biodiversity
Policy DM27 requires development to enhance biodiversity, to have no adverse impact on land with biodiversity or geo-diversity value, and to have no adverse impact on protected species or their habitats. It does not set a biodiversity net gain percentage above the national minimum.
SP7: Green Grid
Policy SP7 protects the Green Grid, including the Wandle Valley Area Framework, and supports street tree planting, green roofs and ecological restoration.
DM25: Sustainable Drainage Systems and reducing flood risk
Policy DM25 requires development to reduce flood risk from all sources, to apply the sequential and exception tests, and to provide sustainable drainage that achieves better than greenfield runoff rates where possible. A flood risk assessment is required for all development in Flood Zones 2 and 3 and for major development, and in Flood Zone 1 where other sources of flooding are identified.
SP6: Environment and Climate Change
Policy SP6 sets the strategic approach to climate change, flood risk and environmental quality, and records that the Council is the Lead Local Flood Authority.
General guidance for biodiversity net gain (bng), not formal advice for your site.
The London Borough of Croydon. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
No sourced higher adopted standard applies. Policy DM27 requires biodiversity to be enhanced. After the National Planning Policy Framework published on 17 August 2026, qualifying applications are assessed against the statutory 10 per cent minimum except on a justified site allocation.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policy G6 deals with biodiversity and urban greening alongside Policies DM27 and SP7.
No other published town guides for this survey in the council area yet.