Biodiversity net gain in Esher for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Elmbridge Borough Council rules explained

Recommended For Esher

  1. The Ecology Partnership

    Independent ecology consultancy with its head office in Leatherhead, Surrey.

  2. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

  3. ACD Environmental

    Multi-disciplinary practice founded in 1985, offering arboriculture, ecology, landscape…

  4. Darwin Ecology

    Independent ecological consultancy with a Surrey office near Farnham, plus offices in…

Get your free quote from ACD Environmental

Tell ACD Environmental about your site in Esher. It's free, and there's no obligation. Your request is for ACD Environmental only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Habitats on and around Esher Common SSSI and along the River Mole have to be measured carefully in a biodiversity net gain assessment for Esher, and any Thames Basin Heaths SPA interest shown on mapping is a separate test, not a substitute for the metric. The local planning authority is Elmbridge Borough Council. Policy CS15 of the Core Strategy, adopted on 20 July 2011, seeks to avoid a net loss of biodiversity and, where feasible, a net gain, without naming a percentage. These drafts therefore apply the statutory minimum of 10 per cent under the Environment Act 2021, unless a scheme is exempt.

Local planning authority: Elmbridge Borough Council

The Bear Hotel on the High Street in Esher, Surrey
Photo: Hassocks5489, CC0

In Esher

Esher is framed by Esher Common SSSI, the River Mole, the River Rythe and the Metropolitan Green Belt. Policy CS15 and Policy DM21 also protect designated sites and priority habitats. Policy CS13 requires avoidance or mitigation for new residential development likely to affect the Thames Basin Heaths SPA; applicants should check whether a specific Esher site falls inside the 5 km zone rather than assume that it does. Net gain and Habitat Regulations tests are separate requirements.

Rivers
River Mole — Flows through the lower catchment at Esher before joining the Thames at East Molesey. The Section 19 report records a flashy response even this far downstream, with sharp peaks on 24 December 2013, 17 January and 1 February 2014. The peak flow of 148 cubic metres per second on 23 to 24 December was the largest in the gauge's 16-year record, estimated as a 1 in 150 annual chance on a pooled analysis. The 2013/14 flood event at Esher is separately estimated as a 1 in 50 annual chance event.
River Rythe — A local watercourse that the Core Strategy identifies as part of Esher's character, with a medium risk of flooding.
SSSIs
Esher Common SSSI — Nationally designated site comprising parts of Esher Common, West End Common and Fairmile Common, named in the reasoned justification to Policy CS15. Policy CS9 also promotes environmental management across Esher Common. Policy DM21 resists development that would have an adverse effect on national sites unless, in exceptional circumstances, the benefits clearly outweigh the harm.
Flood zones
Woodstock Lane South — Temporarily closed by Surrey County Council during the winter 2013/14 floods. The Section 19 report also notes surface water or highway drainage risk in the nearby Claygate area on Woodstock Road, which does not appear to be at fluvial risk on Environment Agency maps.
Landmarks
Lower Mole Flood Alleviation Scheme — Environment Agency scheme that the Section 19 report says provides protection to an estimated 10,000 properties. It was operated on 24 and 25 December 2013 and as necessary through January and February 2014. High flows caused some bank erosion, later repaired. The Core Strategy notes residual flood risk behind Lower Mole defences protecting East Molesey, Hersham and West End.
Special Protection Areas
Thames Basin Heaths SPA — European site protected by Policy CS13. New residential development likely to have a significant effect must provide agreed avoidance or mitigation. A 5 km zone of influence and a 400 m exclusion zone apply. Applicants should check current mapping for a specific Esher site rather than assume the town centre is inside the zone. Brooklands Community Park and work at Esher Common SSSI are part of the borough's wider mitigation and restoration approach.
Green Belt
Metropolitan Green Belt — Wraps much of Esher outside the built-up area, including commons and open land around West End.
Conservation areas
Esher Conservation Area — Policy CS9 requires specific attention to areas of high heritage value, including West End and Esher Conservation Areas, when new development is designed.
Local authority and policy

Elmbridge Borough Council applies the statutory biodiversity net gain duty under the Environment Act 2021, which requires a minimum 10 per cent gain for qualifying development, together with Policy CS15 of the Core Strategy, adopted on 20 July 2011, and Policy DM21 of the Development Management Plan, adopted on 15 April 2015. The adopted policies seek to avoid net loss and, where feasible, achieve a net gain, but they do not set a higher local percentage. The council's Biodiversity Duty Report, dated 26 March 2026, confirms that the council has been applying the statutory 10 per cent minimum. Policy CS13's protection of the Thames Basin Heaths SPA is additional to net gain where a site is affected. Confirm the current validation requirements with the council before submitting.

Local plan: Elmbridge Core Strategy (adopted 20 July 2011) and Development Management Plan (adopted 15 April 2015) (The Core Strategy was adopted on 20 July 2011 and the Development Management Plan on 15 April 2015. These remain the adopted development plan as of 13 November 2026. A previous draft Local Plan was withdrawn from examination in 2025 after the inspector indicated it would be found unsound. A new Local Plan is at scoping consultation (4 November to 9 December 2026), with adoption scheduled for 16 August 2029; it is not adopted. The Core Strategy plan period runs to July 2026, but the adopted policies remain in force until replaced. Under local government reorganisation, plan-making passes to the new East Surrey unitary council on 1 April 2027.)

  • CS15: Biodiversity

    Seeks to avoid loss and contribute to a net gain in biodiversity. The policy protects designated sites, including those relevant to the Thames Basin Heaths SPA and the South West London Waterbodies SPA, protects woodland including ancient woodland, and protects priority habitats and species. Clause 8 requires that new development does not result in a net loss of biodiversity and, where feasible, contributes to a net gain through the incorporation of biodiversity features. It does not set a percentage. National sites named in the reasoned justification include Esher Common SSSI.

  • DM21: Nature conservation and biodiversity

    Expects all new development to preserve, manage and where possible enhance existing habitats, protected species and biodiversity features, in accordance with Core Strategy Policy CS15. Support is given to proposals that incorporate new biodiversity features. Development affecting internationally designated sites is considered against Policies CS13 and CS15 and relevant legislation. Development affecting nationally designated sites will not be permitted if it would have an adverse effect, except in exceptional circumstances where the benefits clearly outweigh the harm, with avoidance, mitigation and compensation sought. Significant harm to locally designated sites or to priority habitats and species will not be permitted. Potential SANG sites identified on the Policies Map are protected from development that would compromise that function. The presumption in favour of sustainable development does not apply to development affecting international sites.

  • DM6: Landscape and trees

    Requires development to include an integral scheme of landscape, tree retention, protection and/or planting that reflects or enhances the existing landscape, contributes to biodiversity, and does not result in the loss of or damage to significant trees and hedgerows unless, in exceptional circumstances, the benefits would outweigh the loss. Existing trees, including their root systems, must be adequately protected before, during and after construction. Loss or deterioration of irreplaceable habitats, including ancient woodland and ancient or veteran trees, is not accepted unless, in exceptional circumstances, the benefits would outweigh the loss. The policy also covers works to trees protected by a Tree Preservation Order.

  • CS26: Flooding

    Requires development to be located, designed and laid out so that it is safe, flood risk is minimised and risk is not increased elsewhere, with residual risks safely managed. Permission is only granted where a sequential test shows the site is in the lowest appropriate flood risk zone in accordance with national policy and the Elmbridge Strategic Flood Risk Assessment, and where development would not constrain the natural function of the flood plain. Development in Flood Zones 2 or 3 requires flood resistance and resilience measures. New development must include SuDS; all development in Flood Zones 2 and 3 must control surface water runoff at greenfield rates as near to source as possible. The policy covers both fluvial and surface water flooding and takes account of climate change. Reasoned justification records comprehensive flood defence and alleviation works along the River Mole after the 1968 floods, and residual risk behind Lower Mole defences.

  • CS13: Thames Basin Heaths Special Protection Area

    Requires new residential development likely to have a significant effect on the Thames Basin Heaths SPA to demonstrate adequate avoidance or mitigation, agreed with Natural England. A 5 km zone of influence applies, with a 400 m exclusion zone where mitigation is unlikely to protect the integrity of the SPA. Outside the exclusion zone but within 5 km, mitigation is required prior to occupation and in perpetuity, based on access management and Suitable Accessible Natural Greenspace. Applicants should check current mapping for a specific site rather than assume a town centre falls inside the zone.

What you’ll usually need

General guidance for biodiversity net gain (bng), not formal advice for your site.

Timing and seasons
Habitat condition surveys are best carried out in the growing season (roughly April to September).
Standards
Statutory biodiversity metric; Environment Act 2021

Questions about bng assessments in Esher

Who is the local planning authority for a biodiversity net gain assessment in Esher?

Elmbridge Borough Council. From 1 April 2027 planning powers pass to the new East Surrey unitary council under local government reorganisation.

Is biodiversity net gain required in Esher?

Yes, for qualifying applications. The council applies the statutory minimum of 10 per cent under the Environment Act 2021. Policy CS15 already sought to avoid net loss and, where feasible, achieve a net gain, but it does not set a higher local percentage. Confirm the current validation requirements with the council.

How does the Thames Basin Heaths SPA affect an Esher application?

Policy CS13 requires avoidance or mitigation for new residential development likely to have a significant effect, including a 5 km zone of influence. Check current mapping for the specific site. This test is in addition to biodiversity net gain.