Biodiversity net gain in Victoria for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Westminster City Council rules explained

Recommended For Victoria

  1. Greengage Environmental

    Environmental and ecology consultancy with a London office at Holyrood Street, near…

  2. Eight Versa

    London environmental consultancy based at Marshalsea Road, Southwark, formerly trading…

  3. Aven Ecology

    London-based ecological consultancy in Muswell Hill.

  4. Thomson Environmental Consultants

    Environmental consultancy founded in 2004, with its head office on the Surrey Research…

Get your free quote from Eight Versa

Tell Eight Versa about your site in Victoria. It's free, and there's no obligation. Your request is for Eight Versa only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Planting around Westminster Cathedral, street trees along Victoria Street, and the riverside corridor of the River Thames all contribute to the ecology of this CAZ cluster. Westminster City Council requires developments to achieve biodiversity net gain wherever feasible and appropriate, and to maximise opportunities to enhance existing habitats and create new habitats for priority species. The adopted plan does not set a percentage above the statutory 10 per cent minimum. A biodiversity gain plan and the statutory metric show how at least 10 per cent net gain will be secured on qualifying applications. Surface water flood risk can be addressed in the same design, because Policy 35 also requires sustainable drainage that can be combined with greening.

Local planning authority: Westminster City Council

The striped brick campanile and nave of Westminster Cathedral, seen against a cloudy sky
Photo: Tony Hisgett, CC BY 2.0

In Victoria

Sites along Victoria Street, around Westminster Cathedral and toward the River Thames often include courtyard habitat, trees and planted roofs that count in a biodiversity metric. Surface water flood risk and drainage design should be considered together with the gain plan.

Landmarks
Westminster Cathedral
Local character
Victoria Street
Rivers
River Thames
Flood zones
surface water flood risk
Local authority and policy

Westminster City Council assesses biodiversity net gain under Policy 34 of the City Plan 2019–2040, adopted on 21 April 2021. The policy seeks net gain wherever feasible and appropriate and does not set a percentage above the statutory 10 per cent minimum. After the National Planning Policy Framework published on 17 August 2026, qualifying applications are assessed against the statutory 10 per cent minimum except on a justified site allocation. Confirm the current local validation requirements with the council before submitting.

Local plan: City Plan 2019–2040 (Westminster's City Plan 2019–2040 was adopted on 21 April 2021 and is the adopted local plan. A later partial review is not treated as adopted. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)

  • 34: Green infrastructure

    Policy 34 of the City Plan 2019–2040, adopted on 21 April 2021, protects and enhances Westminster's green infrastructure. Developments will, wherever possible, contribute to the greening of the city by incorporating trees, green walls, green roofs, rain gardens and other green features. Sites of Importance for Natural Conservation, priority habitats and other ecological features outside the SINC network will be protected. Developments should achieve biodiversity net gain, wherever feasible and appropriate, and should maximise opportunities to enhance existing habitats and create new habitats for priority species. The policy does not set a percentage above the statutory 10 per cent minimum. Trees of amenity, ecological and historic value, and those which contribute to the character and appearance of the townscape, will be protected. The planting of trees to optimise the city's canopy cover will be encouraged in new developments. Supporting text says the loss of such trees should be prevented, and that proposals for new trees should have regard to the Trees and the Public Realm SPD.

  • 35: Flood risk

    Policy 35 requires all developments to be safe for their lifetime from the risk of flooding, complying with the council's Strategic Flood Risk Assessment, Surface Water Management Plan, Local Flood Risk Management Strategy and the Mayor's Regional Flood Risk Appraisal. A site-specific flood risk assessment must be submitted for developments of 1 hectare or greater, all developments in Flood Zones 2 and 3, and all developments within a Surface Water Flood Risk Hotspot. Highly Vulnerable Uses will not be allowed in Flood Zone 3. Within the Rapid Inundation Zone, basement dwellings and basement extensions to existing dwellings will not be acceptable. An undeveloped buffer zone of 16 metres should be maintained around flood defence structures wherever possible. New development must incorporate Sustainable Drainage Systems, should aim to achieve greenfield run-off rates, and should demonstrate how all opportunities to minimise site run-off have been taken.

What you’ll usually need

General guidance for biodiversity net gain (bng), not formal advice for your site.

Timing and seasons
Habitat condition surveys are best carried out in the growing season (roughly April to September).
Standards
Statutory biodiversity metric; Environment Act 2021

Questions about bng assessments in Victoria

Who is the local planning authority for a biodiversity net gain assessment in Victoria?

The Westminster City Council. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

Does Westminster require more than 10 per cent biodiversity net gain?

No. Policy 34 requires developments to achieve biodiversity net gain wherever feasible and appropriate, but it does not set a local percentage above the statutory 10 per cent minimum on qualifying development. After the National Planning Policy Framework published on 17 August 2026, qualifying applications are assessed against the statutory 10 per cent minimum except on a justified site allocation.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policy G6 is read alongside the statutory net gain requirement.