Featured partner
Recommended for Bicester

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Bicester

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Flood and drainage engineering consultancy whose own site publishes a trading address at…
Civil engineering consultancy whose own site publishes a trading address at The Stables,…
Multidisciplinary consultancy whose own contact page publishes an Oxford office at The…
Civil engineering consultancy whose own site publishes a trading address at 2 Preston…
A flood risk assessment in Bicester is often needed where work could affect the Bicester Conservation Area, or the RAF Bicester Conservation Area. Cherwell District Council is the local planning authority. Policy ESD 6 applies a sequential approach to flood risk and requires a site-specific flood risk assessment in the circumstances set out in the adopted policy. It is a historic market town around the Bicester Conservation Area and the RAF Bicester Conservation Area, quite unlike Banbury to the north-west. The adopted Cherwell Local Plan 2011-2031 (Part 1) applies here. Confirm the current validation requirements with the council before submitting.
Local planning authority: Cherwell District Council

Bicester is in the area of Cherwell District Council. It is a historic market town around the Bicester Conservation Area and the RAF Bicester Conservation Area, quite unlike Banbury to the north-west. The adopted Cherwell Local Plan 2011-2031 (Part 1) applies here. The Bicester Conservation Area and the RAF Bicester Conservation Area are the official features that shape flood risk and drainage work here. Oxfordshire County Council is the Lead Local Flood Authority. There is no confirmed successor council for Oxfordshire.
In Bicester, including around the Bicester Conservation Area and at the RAF Bicester Conservation Area, the same adopted local plan policies apply. Cherwell District Council assesses flood risk and drainage under Policy ESD 6 of the Cherwell Local Plan 2011-2031 (Part 1). Policy ESD 6 (Sustainable Flood Risk Management) of the Cherwell Local Plan 2011-2031 (Part 1), adopted on 20 July 2015, provides that the Council will manage and reduce flood risk through a sequential approach, locating vulnerable developments in areas at lower risk of flooding, and requires site-specific flood risk assessments for development in Flood Zones 2 or 3, for development of one hectare or more in Flood Zone 1, and for sites known to have experienced flooding problems or located within nine metres of any watercourse. Oxfordshire County Council is the Lead Local Flood Authority. Confirm the current validation requirements with the council before submitting.
Local plan: Cherwell Local Plan 2011-2031 (Part 1) (adopted)
ESD 10: Protection and Enhancement of Biodiversity and the Natural Environment
Policy ESD 10 (Protection and Enhancement of Biodiversity and the Natural Environment) of the Cherwell Local Plan 2011-2031 (Part 1), adopted on 20 July 2015, seeks a net gain in biodiversity by protecting, managing, enhancing and extending existing resources, and encourages the protection of trees with an aim to increase the number of trees in the District. The policy does not set a higher than statutory biodiversity net gain percentage. Cherwell District Council applies the statutory 10 per cent minimum.
ESD 6: Sustainable Flood Risk Management
Policy ESD 6 (Sustainable Flood Risk Management) of the Cherwell Local Plan 2011-2031 (Part 1), adopted on 20 July 2015, provides that the Council will manage and reduce flood risk through a sequential approach, locating vulnerable developments in areas at lower risk of flooding, and requires site-specific flood risk assessments for development in Flood Zones 2 or 3, for development of one hectare or more in Flood Zone 1, and for sites known to have experienced flooding problems or located within nine metres of any watercourse.
ESD 15: The Character of the Built and Historic Environment
Policy ESD 15 (The Character of the Built and Historic Environment) of the Cherwell Local Plan 2011-2031 (Part 1), adopted on 20 July 2015, requires new development to complement and enhance the character of its context, including conservation areas and their settings, and to conserve, sustain and enhance designated and non-designated heritage assets.
General guidance for flood risk and drainage assessment, not formal advice for your site.
Cherwell District Council. Oxfordshire County Council is the Lead Local Flood Authority. There is no confirmed successor council for Oxfordshire.
A flood risk assessment in Bicester is often needed for development in or near the Bicester Conservation Area or the RAF Bicester Conservation Area, including sites in flood risk areas or above the national size thresholds. Confirm the current validation requirements with the council.
Oxfordshire County Council is the Lead Local Flood Authority. There is no confirmed successor council for Oxfordshire.