Featured partner
Recommended for Bushey

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Bushey

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Transport planning and infrastructure consultancy with its main office on North Street…
Civil and structural engineering practice with a London office in Lambeth.
Flood risk consultancy based at Pyle Hill near Woking, on the northern edge of Guildford…
Flood risk and drainage consultancy based in Crawley, working across England and Wales.
Flood risk in Bushey is often from surface water, including around the Bushey High Street and Melbourne Road Conservation Area and on the Metropolitan Green Belt edge towards Borehamwood, rather than from a large main river in the town centre. The local planning authority is Hertsmere Borough Council, and Hertfordshire County Council is the Lead Local Flood Authority. Policy SADM14 of the SADM Policies Plan, adopted on 23 November 2016, requires the sequential test and a site-specific flood risk assessment in flood risk areas, covering all sources of flooding.
Local planning authority: Hertsmere Borough Council

Bushey sits on slightly higher ground than the Colne valley at Watford, but surface water and ordinary watercourses still matter, including around the Bushey High Street and Melbourne Road Conservation Area and towards the Bushey Heath, The Lakes Conservation Area. Policy SADM15 requires SuDS on all major developments, achieving the greenfield runoff rate or as close as practicable, with 1 in 100 year attenuation including climate change. Policy CS16 requires proposals to take account of the Strategic Flood Risk Assessment.
Hertsmere Borough Council assesses flood risk under Policy SADM14 and surface water under Policy SADM15 of the Site Allocations and Development Management Policies Plan, adopted on 23 November 2016, together with Policy CS16 of the Core Strategy, adopted on 16 January 2013. Hertfordshire County Council is the Lead Local Flood Authority. Confirm the current validation requirements with the council before submitting.
Local plan: Hertsmere Local Plan 2012-2027 (Core Strategy, Site Allocations and Development Management Policies Plan, and Elstree Way Corridor Area Action Plan) (The Core Strategy was adopted on 16 January 2013, the Elstree Way Corridor Area Action Plan on 8 July 2015, and the Site Allocations and Development Management Policies Plan on 23 November 2016. These remain the adopted development plan as of 13 November 2026.)
CS16: Environmental impact of development
Requires proposals to take account of the Strategic Flood Risk Assessment, to avoid development in the floodplain and close to river corridors unless the sequential and exception tests are met, and to incorporate Sustainable Urban Drainage Systems where appropriate.
SADM14: Flood Risk
Requires the sequential test, then the exception test, and a site-specific flood risk assessment in flood risk areas covering all sources of flooding. Development must not increase flood risk elsewhere, must set floor levels in Flood Zones 2 and 3 above the 1 per cent plus climate change level with at least 300 mm freeboard, must be flood resilient and resistant, and must not cause a net loss of flood storage.
SADM15: Sustainable Drainage Systems
Requires sustainable drainage measures in new development, and SuDS on all major developments, providing the most sustainable option from the SuDS hierarchy, achieving the greenfield runoff rate or as close as practicable, providing 1 in 100 year attenuation including climate change, and setting out future maintenance.
CS12: The Enhancement of the Natural Environment
Requires all development proposals to conserve and enhance the natural environment of the borough, including biodiversity, habitats, protected trees, landscape character, and sites of ecological and geological value, and to provide opportunities for habitat creation and enhancement throughout the life of a development.
General guidance for flood risk and drainage assessment, not formal advice for your site.
Hertsmere Borough Council is the local planning authority.
Policy SADM14 applies where a site is at risk from surface water, ordinary watercourses or other sources, including around the Bushey High Street and Melbourne Road Conservation Area and on the Metropolitan Green Belt edge, or could increase risk elsewhere. Confirm the current validation requirements with the council.
Both towns are assessed under the same Hertsmere policies, but the settings differ. Bushey's conservation areas and the Metropolitan Green Belt edge towards Watford and Harrow should be assessed on their own levels and drainage, with SuDS under Policy SADM15 on major developments.