Flood risk and drainage assessments in Cambridge for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Cambridge City Council rules explained

Recommended For Cambridge

  1. MTC Engineering

    Civil engineering consultancy whose own site publishes a trading office at Ground Floor,…

  2. Cannon Consulting Engineers

    Consulting engineers whose own site publishes a trading office at Cambridge House,…

  3. Richard Herrmann Associates

    Civil and structural engineering consultancy whose own site publishes a trading office…

  4. Stomor

    Hitchin civil engineering consultancy.

Get your free quote from Richard Herrmann Associates

Tell Richard Herrmann Associates about your site in Cambridge. It's free, and there's no obligation. Your request is for Richard Herrmann Associates only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

A flood risk assessment in Cambridge is often needed where work could affect the Central Conservation Area, or the River Cam. Cambridge City Council is the local planning authority. Policy 32 requires run-off rates and volumes to be no greater than for the undeveloped site, applies a discharge hierarchy, and requires an assessment of flood risk to the development. It is a historic university city around the official Central Conservation Area and the River Cam, quite unlike Huntingdon, St Neots or St Ives. The adopted Cambridge Local Plan 2018 applies here. Confirm the current validation requirements with the council before submitting.

Local planning authority: Cambridge City Council

King's College Chapel and the Backs, seen across the River Cam
Photo: Christopher Hilton, CC BY-SA 2.0

In Cambridge

Cambridge is in the area of Cambridge City Council. It is a historic university city around the official Central Conservation Area and the River Cam, quite unlike Huntingdon, St Neots or St Ives. The adopted Cambridge Local Plan 2018 applies here. The Central Conservation Area and the River Cam are the official features that shape flood risk and drainage work here. Cambridgeshire County Council is the Lead Local Flood Authority. There is no confirmed successor council for Cambridge.

Conservation areas
Central Conservation Area — The official Central Conservation Area, also referred to in the Cambridge Historic Core Conservation Area Appraisal as Central Conservation Area No. 1, of which the historic core is a sector. The appraisal is listed on Greater Cambridge Shared Planning's official conservation area appraisals page.
Rivers
River Cam — The River Cam, the official river running through Cambridge and identified in the adopted Cambridge Local Plan 2018.
Local authority and policy

In Cambridge, including around the Central Conservation Area and at the River Cam, the same adopted local plan policies apply. Cambridge City Council assesses flood risk and drainage under Policy 32 of the Cambridge Local Plan 2018. Policy 32 (Flood risk) of the Cambridge Local Plan 2018, adopted on 18 October 2018, requires it to be demonstrated that the peak rate and post-development volume of run-off over the lifetime of the development, allowing for climate change, are no greater than for the undeveloped site; that flooding of property in and adjacent to the development would not occur for a 1 in 100 year event plus climate change, including in the event of local drainage system failure; that discharge locations have capacity; and that a management and maintenance plan is in place for the lifetime of the development. Discharge should be to ground via infiltration first, then to a water body, then to a surface water sewer. Discharge to a foul water or combined sewer is unacceptable. Development is also required to be supported by an assessment of the flood risk to the development. Confirm the current validation requirements with the council before submitting.

Local plan: Cambridge Local Plan 2018 (adopted)

  • 69: Protection of sites of biodiversity and geodiversity importance

    Policy 69 (Protection of sites of biodiversity and geodiversity importance) of the Cambridge Local Plan 2018, adopted on 18 October 2018, provides that, in determining any planning application affecting a site of biodiversity or geodiversity importance, development will be permitted if it will not have an adverse impact on, or lead to the loss of, part or all of a site identified on the Policies Map. Regard must be had to the international, national or local status and designation of the site and the nature and quality of the site's intrinsic features, including its rarity. Where development is permitted, proposals must include measures to minimise harm, to secure achievable mitigation and/or compensatory measures, and where possible enhance the nature conservation value of the site affected. The policy does not set a higher than statutory biodiversity net gain percentage. Cambridge City Council applies the statutory 10 per cent minimum.

  • 70: Protection of priority species and habitats

    Policy 70 (Protection of priority species and habitats) of the Cambridge Local Plan 2018, adopted on 18 October 2018, provides that development will be permitted which protects priority species and habitats and enhances habitats and populations of priority species. Proposals that harm or disturb populations and habitats should minimise any ecological harm and secure achievable mitigation and/or compensatory measures, resulting in either no net loss or a net gain of priority habitat and local populations of priority species. Where significant harm cannot be avoided, adequately mitigated or, as a last resort, compensated for, planning permission will be refused. The policy does not set a higher than statutory biodiversity net gain percentage. Cambridge City Council applies the statutory 10 per cent minimum.

  • 32: Flood risk

    Policy 32 (Flood risk) of the Cambridge Local Plan 2018, adopted on 18 October 2018, requires it to be demonstrated that the peak rate and post-development volume of run-off over the lifetime of the development, allowing for climate change, are no greater than for the undeveloped site; that flooding of property in and adjacent to the development would not occur for a 1 in 100 year event plus climate change, including in the event of local drainage system failure; that discharge locations have capacity; and that a management and maintenance plan is in place for the lifetime of the development. Discharge should be to ground via infiltration first, then to a water body, then to a surface water sewer. Discharge to a foul water or combined sewer is unacceptable. Development is also required to be supported by an assessment of the flood risk to the development.

  • 71: Trees

    Policy 71 (Trees) of the Cambridge Local Plan 2018, adopted on 18 October 2018, provides that development will not be permitted which involves felling, significant surgery or potential root damage to trees of amenity or other value, unless there are demonstrable public benefits accruing from the proposal which clearly outweigh the current and future amenity value of the trees. Development proposals should preserve, protect and enhance existing trees and hedges that have amenity value as perceived from the public realm; provide appropriate replacement planting where felling is proved necessary; and provide sufficient space for trees and other vegetation to mature. Particular consideration should be given to veteran or ancient trees, as defined by Natural England, in order to preserve their historic, ecological and amenity value.

What you’ll usually need

General guidance for flood risk and drainage assessment, not formal advice for your site.

Timing and seasons
Not seasonal.
Standards
National Planning Policy Framework; Planning Practice Guidance: Flood risk and coastal change

Questions about flood risk assessments in Cambridge

Who is the local planning authority for a flood risk assessment in Cambridge?

Cambridge City Council. Cambridgeshire County Council is the Lead Local Flood Authority. There is no confirmed successor council for Cambridge.

When is a flood risk assessment likely in Cambridge?

A flood risk assessment in Cambridge is often needed where development could be affected by the River Cam, or by other sources of flooding around the Central Conservation Area. Confirm the current validation requirements with the council.

Who is the Lead Local Flood Authority for Cambridge?

Cambridgeshire County Council is the Lead Local Flood Authority. Confirm the current validation requirements with the council.