Flood risk and drainage assessments in Canada Water for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • London Borough of Southwark rules explained

Recommended For Canada Water

  1. JMS Engineers

    Civil and structural engineering practice with a London office in Lambeth.

  2. RGP

    Transport and civil engineering consultancy with a Surrey office in Godalming and a…

  3. Motion

    Transport planning and infrastructure consultancy with its main office on North Street…

  4. Scott White and Hookins

    Civil and structural engineering consultancy whose London office is in Sutton town centre.

Get your free quote from Scott White and Hookins

Tell Scott White and Hookins about your site in Canada Water. It's free, and there's no obligation. Your request is for Scott White and Hookins only — we don't pass your details to the other firms on this page.

The business will come back to you as soon as they can. Response times depend on the individual business you've contacted.

At a glance

Flood risk in Canada Water is shaped by Canada Water and Greenland Dock, together with surface-water drainage on and around the site. A flood risk assessment should use the current Environment Agency mapping and the council's strategic flood risk assessment, and should not borrow a neighbouring town's catchment story. London Borough of Southwark is the local planning authority and the Lead Local Flood Authority, and the London Plan, published on 2 March 2021, also forms part of the development plan. Drainage proposals should show how surface water will be managed on site. Confirm the current validation requirements with the council before submitting.

Local planning authority: London Borough of Southwark

Greenland Dock at dusk, with still water reflecting a line of trees and the towers of Canary Wharf in the distance
Photo: The wub, CC BY-SA 4.0

In Canada Water

Canada Water is the docklands major centre around the Canada Water basin and Greenland Dock, with St Mary's Rotherhithe Conservation Area and Edward III's Rotherhithe Conservation Area on the Thames to the north. That retained-dock and Rotherhithe village setting is not Rye Lane or Peckham Rye, and it is not the Elephant and Castle interchange. Flood-risk and drainage work should be written for this centre, starting from Canada Water and Greenland Dock.

Landmarks
Canada Water — Canada Water is the retained dock basin at the heart of the major centre, around which the town centre, the library and the underground and Overground stations are arranged.
Greenland Dock — Greenland Dock is the large retained dock immediately south of Canada Water, a distinctive water body and former Surrey Commercial Dock.
Conservation areas
St Mary's Rotherhithe Conservation Area — St Mary's Rotherhithe Conservation Area was designated on 9 October 1970 and extended in 1978. It covers the historic Thames-side village around St Mary's Church, north of Canada Water.
Edward III's Rotherhithe Conservation Area — Edward III's Rotherhithe Conservation Area was designated on 1 February 2011 and includes the scheduled manor house site and open land on the river north of Southwark Park.
Local authority and policy

In Canada Water, including around Canada Water and Greenland Dock, the London Borough of Southwark assesses flood risk and drainage under Policy P68 of the Southwark Plan, adopted on 23 February 2022, together with Policies SI12 and SI13 of the London Plan, published on 2 March 2021. The Southwark Plan 2022 Validation Requirements ask for a flood risk assessment in flood zones. Confirm the current local validation requirements with the council before submitting. Confirm the current validation requirements with the council before submitting.

Local plan: Southwark Plan 2022 (The Southwark Plan 2019–2036 was adopted on 23 February 2022 and remains the adopted local plan. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)

  • P60: Biodiversity

    Policy P60 requires development to contribute to net gains in biodiversity by enhancing and protecting SINCs, Local Nature Reserves, protected species and priority habitats. It does not set a percentage above the national minimum.

  • P61: Trees

    Policy P61 of the Southwark Plan, adopted on 23 February 2022, requires significant existing trees to be retained and protected, including trees of high amenity value, trees in conservation areas, and veteran, ancient and notable trees, and requires retained trees to be protected during construction in line with BS5837.

  • P68: Reducing flood risk

    Policy P68 requires development not to increase flood risk on or off site, sets finished floor levels in areas at risk of flooding, and requires major development to reduce surface water run-off to greenfield rates through sustainable drainage. Tidal flood risk from the Thames is identified in the north of the borough, not in Peckham Town Centre.

What you’ll usually need

General guidance for flood risk and drainage assessment, not formal advice for your site.

Timing and seasons
Not seasonal.
Standards
National Planning Policy Framework; Planning Practice Guidance: Flood risk and coastal change

Questions about flood risk assessments in Canada Water

Who is the local planning authority for a flood risk assessment in Canada Water?

London Borough of Southwark. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.

When is a flood risk assessment likely in Canada Water?

When a planning application in Canada Water could affect trees, habitats, heritage, flood risk or existing buildings around Canada Water and Greenland Dock. Confirm the current validation requirements with the council.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan in Canada Water alongside the London Borough of Southwark local plan.