Flood risk and drainage assessments in Woolwich for planning applications

  • 5 checked firms
  • Free quotes, no obligation
  • Royal Borough of Greenwich rules explained

Recommended For Woolwich

  1. JMS Engineers

    Civil and structural engineering practice with a London office in Lambeth.

  2. RGP

    Transport and civil engineering consultancy with a Surrey office in Godalming and a…

  3. Motion

    Transport planning and infrastructure consultancy with its main office on North Street…

  4. Scott White and Hookins

    Civil and structural engineering consultancy whose London office is in Sutton town centre.

At a glance

The River Thames and the Thames tidal floodplain at Woolwich Town Centre and the Royal Arsenal are a frequent reason for a flood risk assessment in Woolwich. Tidal, residual and surface water flooding all need to be considered, together with climate change. The local planning authority, and the Lead Local Flood Authority, is the Royal Borough of Greenwich. Policy E2 of the Core Strategy, adopted on 30 July 2014, requires flood risk assessments covering all sources, residual risk, climate change and the safeguarding of tidal and fluvial flood defences. Policy SI12 of the London Plan, published on 2 March 2021, also forms part of the development plan.

Local planning authority: Royal Borough of Greenwich

Woolwich Town Hall on Market Street, a red-brick civic building with a clock tower beside the Woolwich Centre
Photo: Kleon3, CC BY-SA 4.0

In Woolwich

Woolwich Town Centre, Beresford Square and the Royal Arsenal sit on the Thames tidal floodplain, defended by the Thames Barrier and raised defences. Residual risk from a breach, although a low probability, still needs to be considered. The Core Strategy also records fluvial risk along the Quaggy, Ravensbourne, Shuttle, Deptford Creek and Butts Canal elsewhere in the borough, and surface water risk including at the Royal Arsenal and Plumstead.

Local character
Woolwich Town Centre
Beresford Square
Royal Arsenal
Rivers
River Thames
Other
Woolwich Common
South East London Green Chain
Flood zones
Thames tidal floodplain
Local authority and policy

The Royal Borough of Greenwich assesses flood risk and drainage under Policies E2 and E3 of the Core Strategy, adopted on 30 July 2014, together with Policies SI12 and SI13 of the London Plan, published on 2 March 2021. Policy E2 requires flood risk assessments to demonstrate that development will be safe, will not increase flood risk elsewhere, and will safeguard tidal and fluvial defences. Confirm the current local validation requirements with the council before submitting.

Local plan: Royal Greenwich Local Plan: Core Strategy with Detailed Policies (The Royal Greenwich Local Plan: Core Strategy with Detailed Policies was adopted on 30 July 2014 and remains the adopted local plan. A new Local Plan is in preparation, including a draft consulted from late 2025, but that review is not treated as adopted policy. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)

  • OS(f): Ecological Factors

    Policy OS(f) of the Core Strategy, adopted on 30 July 2014, requires development to take account of ecological factors, including an appropriate survey of existing trees, protection of trees and root systems, and surveys of flora and fauna on Sites of Importance for Nature Conservation and on sites over one hectare.

  • OS3: South East London Green Chain

    Policy OS3 promotes and enhances the South East London Green Chain, including the Green Chain Walk from the Thames through Woolwich Common toward Shooters Hill and Eltham.

  • E2: Flood Risk

    Policy E2 requires the Strategic Flood Risk Assessment to inform development, applies the sequential and exception tests, and requires flood risk assessments covering all sources of flooding, residual risk, climate change and the safeguarding of tidal and fluvial flood defences.

  • E3: Residual Flood Risk

    Policy E3 addresses residual flood risk behind the Thames tidal defences.

  • OS4: Biodiversity

    Policy OS4 requires Royal Greenwich’s rich biodiversity to be protected, restored and enhanced, with a presumption against development of SSSIs, SINCs and Local Nature Reserves. It does not set a biodiversity net gain percentage above the national minimum.

What you’ll usually need

General guidance for flood risk and drainage assessment, not formal advice for your site.

Timing and seasons
Not seasonal.
Standards
National Planning Policy Framework; Planning Practice Guidance: Flood risk and coastal change

Questions about flood risk assessments in Woolwich

Who is the Lead Local Flood Authority for Woolwich?

The Royal Borough of Greenwich. It is also the local planning authority. The London Plan forms part of the development plan. There is no 2027 successor council for this borough.

When is a flood risk assessment likely in Woolwich Town Centre?

Policy E2 requires flood risk from all sources to be assessed, including tidal and residual risk on the Thames tidal floodplain at Woolwich Town Centre, Beresford Square and the Royal Arsenal, together with surface water. Confirm the current local validation requirements with the council.

Does the London Plan also apply?

Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policies SI12 and SI13 deal with flood risk and sustainable drainage alongside Policies E2 and E3.