Featured partner
Recommended for East Ham

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for East Ham

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Civil and structural engineering practice with a London office in Lambeth.
Transport and civil engineering consultancy with a Surrey office in Godalming and a…
Transport planning and infrastructure consultancy with its main office on North Street…
Civil and structural engineering consultancy whose London office is in Sutton town centre.
Flood risk in East Ham is shaped by East Ham Town Centre Conservation Area and East Ham High Street North, together with surface-water drainage on and around the site. A flood risk assessment should use the current Environment Agency mapping and the council's strategic flood risk assessment, and should not borrow a neighbouring town's catchment story. London Borough of Newham is the local planning authority and the Lead Local Flood Authority, and the London Plan, published on 2 March 2021, also forms part of the development plan. Drainage proposals should show how surface water will be managed on site. Confirm the current validation requirements with the council before submitting.
Local planning authority: London Borough of Newham

East Ham is the eastern major centre in the borough, around East Ham Town Centre Conservation Area, East Ham High Street North and Central Park, East Ham. That civic High Street setting is not Stratford Town Centre, Queen Elizabeth Olympic Park, the River Lea or the Bow Back Rivers. Flood-risk and drainage work should be written for this centre, starting from East Ham Town Centre Conservation Area and East Ham High Street North.
In East Ham, including around East Ham Town Centre Conservation Area and East Ham High Street North, the London Borough of Newham, as local planning authority and Lead Local Flood Authority, assesses flood risk under Policy CE7 and sustainable drainage under Policy CE8 of Our Newham Local Plan 2026–2042, adopted on 2 November 2026, together with Policies SI12 and SI13 of the London Plan, published on 2 March 2021. The December 2024 Planning Application Requirements list sets out when a flood risk assessment is required but still cites the withdrawn 2018 Local Plan, so confirm the current local validation requirements and policy numbers with the council before submitting. Confirm the current validation requirements with the council before submitting.
Local plan: Our Newham Local Plan 2026–2042 (Our Newham Local Plan 2026–2042 was adopted on 2 November 2026 and is the adopted local plan. The previous Newham Local Plan 2018 and, within Newham, the LLDC Local Plan 2020 have been formally withdrawn. Stratford is now fully under the London Borough of Newham. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
CE7: Managing flood risk
Policy CE7 requires all new development to avoid placing people or essential infrastructure at increased flood risk for the lifetime of the development, to assess risk from all sources using the Strategic Flood Risk Assessment, to apply the sequential test and, where necessary, the exception test, and to provide a flood risk assessment when required by national requirements, the SFRA and Environment Agency advice. Development should be set back a minimum of 16 metres from the landward side of tidal flood defences and eight metres from fluvial river defences. The Thames, the River Roding and the River Lea are the borough’s principal watercourses; the Thames and the Royal Docks neighbourhoods lie to the south of Stratford Town Centre, while the River Lea and the Bow Back Rivers adjoin Queen Elizabeth Olympic Park.
CE8: Sustainable drainage
Policy CE8 requires sustainable drainage in new development, following the London Plan drainage hierarchy, so that surface water is managed on site and flood risk is not increased elsewhere.
GWS4: Trees
Policy GWS4 of Our Newham Local Plan 2026–2042, adopted on 2 November 2026, requires development to protect trees and deliver a network of improved tree stock and canopy cover. It seeks a net increase in trees on all new development sites and requires an arboricultural report at the planning application stage for all new development with trees on or adjacent to the site. Loss is only supported in exceptional circumstances with adequate on-site replacement or a mitigating contribution. Major development that proposes to remove a tree must submit a CAVAT study.
GWS3: Biodiversity, urban greening, and access to nature
Policy GWS3 requires development to deliver a biodiversity net gain of at least 10 per cent, which restates the statutory minimum and does not set a higher local percentage. Major development, and all development close to a SINC or likely to affect protected or priority species, must submit an ecological assessment. The policy also applies the London Plan urban greening factor and Epping Forest Special Area of Conservation mitigation for net additional homes within 6.2 km of the SAC.
General guidance for flood risk and drainage assessment, not formal advice for your site.
London Borough of Newham. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
When a planning application in East Ham could affect trees, habitats, heritage, flood risk or existing buildings around East Ham Town Centre Conservation Area and East Ham High Street North. Confirm the current validation requirements with the council.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan in East Ham alongside the London Borough of Newham local plan.