Featured partner
Recommended for Woolwich

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Woolwich

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Civil and structural engineering practice with a London office in Lambeth.
Transport and civil engineering consultancy with a Surrey office in Godalming and a…
Transport planning and infrastructure consultancy with its main office on North Street…
Civil and structural engineering consultancy whose London office is in Sutton town centre.
The River Thames and the Thames tidal floodplain at Woolwich Town Centre and the Royal Arsenal are a frequent reason for a flood risk assessment in Woolwich. Tidal, residual and surface water flooding all need to be considered, together with climate change. The local planning authority, and the Lead Local Flood Authority, is the Royal Borough of Greenwich. Policy E2 of the Core Strategy, adopted on 30 July 2014, requires flood risk assessments covering all sources, residual risk, climate change and the safeguarding of tidal and fluvial flood defences. Policy SI12 of the London Plan, published on 2 March 2021, also forms part of the development plan.
Local planning authority: Royal Borough of Greenwich

Woolwich Town Centre, Beresford Square and the Royal Arsenal sit on the Thames tidal floodplain, defended by the Thames Barrier and raised defences. Residual risk from a breach, although a low probability, still needs to be considered. The Core Strategy also records fluvial risk along the Quaggy, Ravensbourne, Shuttle, Deptford Creek and Butts Canal elsewhere in the borough, and surface water risk including at the Royal Arsenal and Plumstead.
The Royal Borough of Greenwich assesses flood risk and drainage under Policies E2 and E3 of the Core Strategy, adopted on 30 July 2014, together with Policies SI12 and SI13 of the London Plan, published on 2 March 2021. Policy E2 requires flood risk assessments to demonstrate that development will be safe, will not increase flood risk elsewhere, and will safeguard tidal and fluvial defences. Confirm the current local validation requirements with the council before submitting.
Local plan: Royal Greenwich Local Plan: Core Strategy with Detailed Policies (The Royal Greenwich Local Plan: Core Strategy with Detailed Policies was adopted on 30 July 2014 and remains the adopted local plan. A new Local Plan is in preparation, including a draft consulted from late 2025, but that review is not treated as adopted policy. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
OS(f): Ecological Factors
Policy OS(f) of the Core Strategy, adopted on 30 July 2014, requires development to take account of ecological factors, including an appropriate survey of existing trees, protection of trees and root systems, and surveys of flora and fauna on Sites of Importance for Nature Conservation and on sites over one hectare.
OS3: South East London Green Chain
Policy OS3 promotes and enhances the South East London Green Chain, including the Green Chain Walk from the Thames through Woolwich Common toward Shooters Hill and Eltham.
E2: Flood Risk
Policy E2 requires the Strategic Flood Risk Assessment to inform development, applies the sequential and exception tests, and requires flood risk assessments covering all sources of flooding, residual risk, climate change and the safeguarding of tidal and fluvial flood defences.
E3: Residual Flood Risk
Policy E3 addresses residual flood risk behind the Thames tidal defences.
OS4: Biodiversity
Policy OS4 requires Royal Greenwich’s rich biodiversity to be protected, restored and enhanced, with a presumption against development of SSSIs, SINCs and Local Nature Reserves. It does not set a biodiversity net gain percentage above the national minimum.
General guidance for flood risk and drainage assessment, not formal advice for your site.
The Royal Borough of Greenwich. It is also the local planning authority. The London Plan forms part of the development plan. There is no 2027 successor council for this borough.
Policy E2 requires flood risk from all sources to be assessed, including tidal and residual risk on the Thames tidal floodplain at Woolwich Town Centre, Beresford Square and the Royal Arsenal, together with surface water. Confirm the current local validation requirements with the council.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policies SI12 and SI13 deal with flood risk and sustainable drainage alongside Policies E2 and E3.