Featured partner
Recommended for Enfield Town

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Enfield Town

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Civil and structural engineering practice with a London office in Lambeth.
Transport and civil engineering consultancy with a Surrey office in Godalming and a…
Transport planning and infrastructure consultancy with its main office on North Street…
Civil and structural engineering consultancy whose London office is in Sutton town centre.
Enfield Town was identified for a more detailed Level 2 Strategic Flood Risk Assessment, and surface water flood risk remains a live issue around Enfield Civic Centre, in the Enfield Town Conservation Area and beside the New River and Enfield Town Park. The London Borough of Enfield requires development to avoid and reduce flood risk and not increase it elsewhere, and it requires Sustainable Drainage Systems in all developments. A site-specific flood risk assessment is needed in the circumstances set out in Policy DMD 60, including surface-water risk identified in the Surface Water Management Plan. Major development must achieve greenfield run-off rates. Fluvial flood zones in the borough are more extensive along the River Lee and its tributaries than in the town-centre core, but surface and groundwater still need a careful look here.
Local planning authority: London Borough of Enfield

Surface water flood risk around Enfield Civic Centre, in the Enfield Town Conservation Area and beside the New River and Enfield Town Park can trigger a flood risk assessment even where a site is not in a fluvial flood zone. Drainage design should protect flow routes and permeable surfaces.
The London Borough of Enfield assesses flood risk and drainage under Core Policy 28 and Policies DMD 59, DMD 60 and DMD 61 of the adopted Core Strategy (November 2010) and Development Management Document (November 2014), read with London Plan Policies SI12 and SI13. Confirm the current local validation requirements with the council before submitting.
Local plan: Enfield Core Strategy 2010–2025 and Development Management Document (2014) (The adopted borough-wide development plan documents remain the Core Strategy (November 2010) and the Development Management Document (November 2014). A new Local Plan has been submitted for examination and is not treated as adopted. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
DMD 80: Trees on Development Sites
Policy DMD 80 of the Enfield Development Management Document, adopted in November 2014, refuses development, including subsidiary or enabling works, that involves the loss of or harm to trees covered by Tree Preservation Orders or trees of significant amenity or biodiversity value, unless exceptional circumstances support removal and adequate replacement is provided. All development and demolition must retain and protect trees of amenity and biodiversity value on the site and on adjacent sites, ensure the future long-term health and amenity value of the trees is not harmed, and provide adequate separation from buildings, including regard to shading. Works must comply with established arboricultural good practice, guidelines and legislation. Supporting text advises that measures to safeguard retained trees should be in accordance with BS 5837.
DMD 78: Nature Conservation
Policy DMD 78 permits development that has a direct or indirect negative impact upon important ecological assets only where the harm cannot reasonably be avoided and it has been demonstrated that appropriate mitigation can address the harm, secured through planning obligations or conditions. Important ecological assets include the Chingford Reservoirs Site of Special Scientific Interest, Sites of Importance for Nature Conservation, ancient woodland, veteran trees, and habitats and species of principal importance. Major development in areas of deficiency must maximise opportunities to improve access to nature. Policy DMD 79 separately requires on-site ecological enhancements on developments creating 100 square metres of floorspace or one net dwelling or more, having regard to feasibility and viability. Core Policy 36 of the Core Strategy, adopted in November 2010, seeks to protect, enhance, restore or add to biodiversity interests.
Core Policy 36: Biodiversity
Core Policy 36 of the Enfield Core Strategy, adopted in November 2010, seeks to protect, enhance, restore or add to biodiversity interests in the borough, including parks, green corridors, waterways, and sites, habitats and species identified at European, national, London or local level. The council will continue to protect, restore and enhance such sites and will require improvements to biodiversity provision, with priority given to areas of deficiency. The policy does not set a biodiversity net gain percentage above the national minimum.
DMD 59: Avoiding and Reducing Flood Risk
Policy DMD 59 requires new development to avoid and reduce the risk of flooding and not increase the risks elsewhere. Development must be appropriately located and informed by a site-specific flood risk assessment in flood risk areas in line with Policy DMD 60, preserve overland flood and flow routes, ensure no net loss of flood storage on site (or, exceptionally, adequate off-site compensatory storage), manage surface water in line with Policy DMD 61, and prevent the loss of permeable surfaces while maximising green infrastructure as potential flood storage. Policy DMD 60 sets when a flood risk assessment is required, including development of 1 hectare or more in Flood Zone 1, all new development in Flood Zones 2 and 3, below-ground space in groundwater flood risk areas, and proposals identified as being at risk from surface water flooding in the Surface Water Management Plan. Policy DMD 61 requires a drainage strategy for all developments, with major development required to achieve greenfield run-off rates. Core Policy 28 requires Sustainable Drainage Systems in all developments.
Core Policy 28: Managing Flood Risk Through Development
Core Policy 28 of the Enfield Core Strategy, adopted in November 2010, takes a risk-based approach to development and flood risk, directing development to areas of lowest risk. Sustainable Drainage Systems are required in all developments, irrespective of the flood risk at individual sites. Developments in areas identified as being at risk from surface or groundwater flooding must demonstrate that further investigation of the extent of risk, and the feasibility of options for prevention or mitigation, have been considered. A Level 2 Strategic Flood Risk Assessment was identified for Enfield Town among other locations.
General guidance for flood risk and drainage assessment, not formal advice for your site.
The London Borough of Enfield. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
The London Borough of Enfield. It is also the local planning authority. The London Plan forms part of the development plan. There is no 2027 successor council for this borough.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policies SI12 and SI13 are the London Plan flood risk and sustainable drainage policies.
No other published town guides for this survey in the council area yet.