Featured partner
Recommended for Wood Green

ROAVR Group
Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Featured partner
Recommended for Wood Green

Tree, ecology, flood risk and topographical surveys for planning applications.
4.9 Google rating
Local experts.
Transport planning and infrastructure consultancy with its main office on North Street…
Civil and structural engineering practice with a London office in Lambeth.
Transport and civil engineering consultancy with a Surrey office in Godalming and a…
Civil and structural engineering consultancy whose London office is in Sutton town centre.
Wood Green is a densely paved metropolitan centre, so surface water flood risk is the usual concern along Wood Green High Road, around Haringey Civic Centre and beside Ducketts Common, rather than fluvial flood zones on the High Road itself. The London Borough of Haringey requires all new development to avoid and reduce flood risk and not to increase it, and to manage surface water as close to its source as possible. Major development must reduce run-off to a greenfield rate for a 1 in 100 year storm; minor development should aim for that rate and at least halve existing run-off. A site-specific flood risk assessment is needed in Flood Zones 2 and 3a and in the other circumstances set out in national policy and Policy DM24. Sustainable drainage should be designed to benefit amenity and biodiversity, including the open space at the common.
Local planning authority: London Borough of Haringey

Surface water flood risk along Wood Green High Road, around Haringey Civic Centre and beside Ducketts Common can trigger a flood risk assessment and a drainage scheme even where a site is not in a fluvial flood zone.
The London Borough of Haringey assesses flood risk and drainage under Policy SP5 and Policies DM24 and DM25 of the adopted Strategic Policies and Development Management DPD (24 July 2017), read with London Plan Policies SI12 and SI13. Confirm the current local validation requirements with the council before submitting.
Local plan: Haringey's Local Plan: Strategic Policies 2013–2026 (consolidated with alterations since 2017) and Development Management DPD (Haringey's Strategic Policies (2013, with 2017 alterations) and the Development Management DPD were adopted on 24 July 2017 and remain the adopted borough-wide local plan. The London Plan, published on 2 March 2021, also forms part of the development plan. There is no 2027 successor council for this borough.)
SP13: Open Space and Biodiversity
Policy SP13 of Haringey's Strategic Policies, adopted on 24 July 2017, requires new development to protect and improve the borough's parks and open spaces and to protect and improve sites of biodiversity and nature conservation, including private gardens. This includes a contribution to wildlife and ecological habitats; the protection, management and maintenance of existing trees and the planting of new trees where appropriate; and the protection, enhancement and creation of Sites of Importance for Nature Conservation and Local Nature Reserves. The policy does not set a biodiversity net gain percentage above the national minimum.
DM19: Nature Conservation
Policy DM19 of the Development Management DPD, adopted on 24 July 2017, requires development on or adjacent to internationally designated sites, Sites of Special Scientific Interest, Local Nature Reserves, Sites of Importance for Nature Conservation or Ecological Corridors to protect and enhance the nature conservation value of the site. Development with a direct or indirect adverse impact upon important ecological assets is only permitted where the harm cannot reasonably be avoided and appropriate mitigation can address the harm caused. Supporting text expects proposals to seek opportunities to enhance biodiversity wherever possible.
DM24: Managing and Reducing Flood Risk
Policy DM24 requires all proposals for new development to avoid and reduce the risk of flooding to future occupants and not to increase the risk of flooding. Proposals in Flood Zones 2 and 3a must provide evidence for the Sequential and, where required, Exception Tests, informed by a site-specific flood risk assessment taking account of all sources of flooding. All new development must manage and reduce surface water run-off and manage water and waste water discharges. Development in Flood Zone 3b is not permitted except for water-compatible uses and essential infrastructure. Policy DM25 requires surface water to be managed as close to its source as possible. Major development must reduce surface water flows to a greenfield run-off rate for a 1 in 100 year critical storm event; minor development should aim for greenfield rates and, at a minimum, a 50 per cent reduction on existing site run-off rates. Policy SP5 requires all development to reduce all forms of flood risk and to implement Sustainable Drainage Systems.
General guidance for flood risk and drainage assessment, not formal advice for your site.
The London Borough of Haringey. The London Plan also forms part of the development plan. The borough is the Lead Local Flood Authority. There is no 2027 successor council for this borough.
The London Borough of Haringey. It is also the local planning authority. The London Plan forms part of the development plan. There is no 2027 successor council for this borough.
Yes. The London Plan, published on 2 March 2021, forms part of the development plan. Policies SI12 and SI13 are the London Plan flood risk and sustainable drainage policies.
No other published town guides for this survey in the council area yet.